Permit #2022070496
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00350-0090 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00350 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 470-817-1259 |
| Location Address: 9 RICHARD PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/01/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤209,353.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/12/2023 | FINAL APPROVED | JWALKER |
| ROW - STORMWATER FINAL | 12/12/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES 1) ALL BARE AREAS THAT WAS ON THE RIGHT SIDE OF YOUR LOT NEED TO BE SOD 2) NOT ALLOWED TO HAVE SEED AND STRAW IN THE RIGHT OF WAY NEEDS SOD Sec 300.03 F4 Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be sodded to match grade and prevent soil erosion. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/12/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please dont invert square nut type cap -try to use flush mount caps 11/30/2023 - PREVIOUS INSPECTION NOTES lower sewer C/Ocap-try to use a flush not square nut type | |||
| U -UTILITY RESIDENTIAL FINAL | 11/30/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: lower sewer C/Ocap-try to use a flush not square nut type | |||
| ROW - STORMWATER FINAL | 11/30/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) ALL BARE AREAS THAT WAS ON THE RIGHT SIDE OF YOUR LOT NEED TO BE SOD 2) NOT ALLOWED TO HAVE SEED AND STRAW IN THE RIGHT OF WAY NEEDS SOD Sec 300.03 F4 Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be sodded to match grade and prevent soil erosion. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/30/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/28/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------------- 11/21/2023 - PREVIOUS INSPECTION NOTES 1) CULVERT PIPE HAS TO MUCH PITCH NEED TO REVERIFY THAT THE PIPE IS CORRECT Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan.The culvert cannot sloped more than 0.10 feet in the direction of the drainage flow. 2) NEED TO HAVE AN ELEVATION IN THE MIDDLE AGAINST THE BACK OF HOUSE ELEVATIONS SHOW THE 10' OFF STRUCTURE IS HIGHER SO WATER WILL IMPACT THE STRUCTURE 3) NEED TO HAVE .10 OF FALL EVERY 20' Sec.300.01 (4,5,6) Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/28/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - DRAINAGE | 11/28/2023 | APPROVED | PFLANAGAN |
| Note: 11/6/2023 - PREVIOUS INSPECTION NOTES 11/06/23 PLEASE READ PREVIOUS INSPECTORS NOTES. YOU NEED TO MOVE THE PORTA POTTY OUT OF THE CITY STREE AND ONTO YOUR SITE. THIS IS A SAFETY HAZARD AND NEEDS TO BE CORRECTED IMMEDIATELY. INSPECTOR WILL BE BVACK FOR COMPLIANCE REINSPECTION TOMORROW 11/7/23. IF IT IS NOT REMOVED A STOP WORK ORDER MAY BE ISSUED. SEE PHOTO. ________________________________________________________________________________________________________________________ 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23= IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. iNSPECTOR BE BACK 11/6/23. PICTURE ATTACHED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/21/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) CULVERT PIPE HAS TO MUCH PITCH NEED TO REVERIFY THAT THE PIPE IS CORRECT Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan.The culvert cannot sloped more than 0.10 feet in the direction of the drainage flow. 2) NEED TO HAVE AN ELEVATION IN THE MIDDLE AGAINST THE BACK OF HOUSE ELEVATIONS SHOW THE 10' OFF STRUCTURE IS HIGHER SO WATER WILL IMPACT THE STRUCTURE 3) NEED TO HAVE .10 OF FALL EVERY 20' Sec.300.01 (4,5,6) Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW - DRAINAGE | 11/06/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/06/23 PLEASE READ PREVIOUS INSPECTORS NOTES. YOU NEED TO MOVE THE PORTA POTTY OUT OF THE CITY STREE AND ONTO YOUR SITE. THIS IS A SAFETY HAZARD AND NEEDS TO BE CORRECTED IMMEDIATELY. INSPECTOR WILL BE BVACK FOR COMPLIANCE REINSPECTION TOMORROW 11/7/23. IF IT IS NOT REMOVED A STOP WORK ORDER MAY BE ISSUED. SEE PHOTO. ________________________________________________________________________________________________________________________ 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23= IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. iNSPECTOR BE BACK 11/6/23. PICTURE ATTACHED. | |||
| ROW - DRAINAGE | 11/01/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 11/1/23= IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. iNSPECTOR BE BACK 11/6/23. PICTURE ATTACHED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/01/2023 | APPROVED | GBERTOLA |
| Note: 11/1/23=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/26/2023 - PREVIOUS INSPECTION NOTES 9/26/23= FOOTERS HAVE WASHED IN AND NEED TO BE DUG OUT A MINIMUM OF TWO INCHES OF CONCRETE IS REQUIRED OVER THE EXPOSED EDGE OF THE MITERED END SECTION OF THE PIPE.300 E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/22/2023 - PREVIOUS INSPECTION NOTES 09/22/23 DUE TO INTERNET OUTAGE I WAS NOT ABLE TO COMPLETE THIS INSPECTION. NO FEE. I AM RESCHEDULING FOR MONDAY SEPTEMBER 25TH. IT DOES NOT APPEAR THAT ANYTHING WAS DONE AS FAR AS CORRECTION THAT THE PREVIOUS INSPECTOR NOTED. NOTE TO INSPECTOR THE CULVERT NEEDS TO BE CUT SO THE MITER END IS NOT SO LONG HOME OWNER TO THE RIGHT CALL CODE ABOUT THE MITER END IS OVER THE PROPERTY LINE RIGHT SIDE ONLY NEED TO BE 8" FROM THE DRIVEWAY TO THE MITER OF THE CULVERT. PER ROBERT ------------------------------------------------------------------------------------ 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09/13/23 need to have 5" minimum concrete coverage over culvert pipe. Need to turn down your band bolts out of the pour area. Dirt and silt has washed onto the culvert pipe, should only be 1/2 way covered. Culvert ends and mitered ends full of water. Need to have a 6" x 6" footer at the mitered end. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/26/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 9/26/23=at the time of the inspection culvert pipe is good FOOTERS HAVE WASHED IN AND NEED TO BE DUG OUT A MINIMUM OF TWO INCHES OF CONCRETE IS REQUIRED OVER THE EXPOSED EDGE OF THE MITERED END SECTION OF THE PIPE.300 E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/22/2023 - PREVIOUS INSPECTION NOTES 09/22/23 DUE TO INTERNET OUTAGE I WAS NOT ABLE TO COMPLETE THIS INSPECTION. NO FEE. I AM RESCHEDULING FOR MONDAY SEPTEMBER 25TH. IT DOES NOT APPEAR THAT ANYTHING WAS DONE AS FAR AS CORRECTION THAT THE PREVIOUS INSPECTOR NOTED. NOTE TO INSPECTOR THE CULVERT NEEDS TO BE CUT SO THE MITER END IS NOT SO LONG HOME OWNER TO THE RIGHT CALL CODE ABOUT THE MITER END IS OVER THE PROPERTY LINE RIGHT SIDE ONLY NEED TO BE 8" FROM THE DRIVEWAY TO THE MITER OF THE CULVERT. PER ROBERT ------------------------------------------------------------------------------------ 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09/13/23 need to have 5" minimum concrete coverage over culvert pipe. Need to turn down your band bolts out of the pour area. Dirt and silt has washed onto the culvert pipe, should only be 1/2 way covered. Culvert ends and mitered ends full of water. Need to have a 6" x 6" footer at the mitered end. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/22/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/22/23 DUE TO INTERNET OUTAGE I WAS NOT ABLE TO COMPLETE THIS INSPECTION. NO FEE. I AM RESCHEDULING FOR MONDAY SEPTEMBER 25TH. IT DOES NOT APPEAR THAT ANYTHING WAS DONE AS FAR AS CORRECTION THAT THE PREVIOUS INSPECTOR NOTED. NOTE TO INSPECTOR THE CULVERT NEEDS TO BE CUT SO THE MITER END IS NOT SO LONG HOME OWNER TO THE RIGHT CALL CODE ABOUT THE MITER END IS OVER THE PROPERTY LINE RIGHT SIDE ONLY NEED TO BE 8" FROM THE DRIVEWAY TO THE MITER OF THE CULVERT. PER ROBERT ------------------------------------------------------------------------------------ 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09/13/23 need to have 5" minimum concrete coverage over culvert pipe. Need to turn down your band bolts out of the pour area. Dirt and silt has washed onto the culvert pipe, should only be 1/2 way covered. Culvert ends and mitered ends full of water. Need to have a 6" x 6" footer at the mitered end. | |||
| ROW - DRAINAGE | 09/19/2023 | APPROVED | PFLANAGAN |
| Note: THE FLAIR ON THE MITER ENDS NEED TO BE CUT SO THERE IS ONLY 8" FROM CUT OF THE MITER AND DRIVEWAY --------------------------------------------------------------------------- rjg. Caller and code enforcement said the neighbor is reporting that the new construction builder is "pouring driveway 3 feet over the property line. I see the Pre pour failed for other reasons, please check that the flare does not cross the property line. Code officer is Dan. His City Cell is 986-286-2013. | |||
| U-CROSS CONNECTION | 09/14/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connectin | |||
| ROW- PRE-APRON (PRE-POUR) | 09/14/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 9/13/2023 - PREVIOUS INSPECTION NOTES 09/13/23 need to have 5" minimum concrete coverage over culvert pipe. Need to turn down your band bolts out of the pour area. Dirt and silt has washed onto the culvert pipe, should only be 1/2 way covered. Culvert ends and mitered ends full of water. Need to have a 6" x 6" footer at the mitered end. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/13/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 09/13/23 need to have 5" minimum concrete coverage over culvert pipe. Need to turn down your band bolts out of the pour area. Dirt and silt has washed onto the culvert pipe, should only be 1/2 way covered. Culvert ends and mitered ends full of water. Need to have a 6" x 6" footer at the mitered end. See photos for reference. | |||
| ELECTRIC - EARLY POWER | 06/14/2023 | APPROVED | JWALKER |
| U - SEWER TIE IN | 06/08/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 05/17/2023 | APPROVED | FWILLIS |
| Note: 5/16/2023 - PREVIOUS INSPECTION NOTES 5-15-23 1. Fire foam needs to be in every hole through the top plate. | |||
| INSULATION | 05/16/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-15-23 1. Fire foam needs to be in every hole through the top plate. | |||
| PEP TANK INSTALLATION REQUEST | 05/16/2023 | APPROVED | CSTONE |
| ALL ROUGH | 05/10/2023 | APPROVED | JWALKER |
| Note: 4/26/2023 - PREVIOUS INSPECTION NOTES 4/26/23 Below listed correction has not been made. 4/10/2023 - PREVIOUS INSPECTION NOTES 4-10-23 still missing nail plates as described below. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 3/22/2023 - PREVIOUS INSPECTION NOTES 3/22/23 1. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 2. Item 4 listed below. The plumbing inspector Mark Gibson state the P-trap was installed at plumbing 1st rough.. 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23 Below listed violations have not been corrected. 3/8/2023 - PREVIOUS INSPECTION NOTES 1. Ground wire to the Ufer is to be protected running down the exterior wall. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| ALL ROUGH | 04/26/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 4/26/23 Below listed correction has not been made. 4/10/2023 - PREVIOUS INSPECTION NOTES 4-10-23 still missing nail plates as described below. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 3/22/2023 - PREVIOUS INSPECTION NOTES 3/22/23 1. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 2. Item 4 listed below. The plumbing inspector Mark Gibson state the P-trap was installed at plumbing 1st rough.. 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23 Below listed violations have not been corrected. 3/8/2023 - PREVIOUS INSPECTION NOTES 1. Ground wire to the Ufer is to be protected running down the exterior wall. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| ALL ROUGH | 04/10/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 4-10-23 still missing nail as described below. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 3/22/2023 - PREVIOUS INSPECTION NOTES 3/22/23 1. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 2. Item 4 listed below. The plumbing inspector Mark Gibson state the P-trap was installed at plumbing 1st rough.. 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23 Below listed violations have not been corrected. 3/8/2023 - PREVIOUS INSPECTION NOTES 1. Ground wire to the Ufer is to be protected running down the exterior wall. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| ALL ROUGH | 03/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: 3/22/23 1. Nail plates at the exterior walls need to be installed before the inspection can pass. The insulation will concealed the areas needed to be nail plated. 2. Item 4 listed below. The plumbing inspector Mark Gibson state the P-trap was installed at plumbing 1st rough.. 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23 Below listed violations have not been corrected. 3/8/2023 - PREVIOUS INSPECTION NOTES 1. Ground wire to the Ufer is to be protected running down the exterior wall. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| ALL ROUGH | 03/16/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23 Below listed violations have not been corrected. 3/8/2023 - PREVIOUS INSPECTION NOTES 1. Ground wire to the Ufer is to be protected running down the exterior wall. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| LATH/BRICK/ WATER BARRIER | 03/16/2023 | APPROVED | JWALKER |
| ALL ROUGH | 03/10/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 3/10/23 Below listed violations have not been corrected. 3/8/2023 - PREVIOUS INSPECTION NOTES 1. Ground wire to the Ufer is to be protected running down the exterior wall. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| ALL ROUGH | 03/08/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Ground wire to the Ufer is to be protected running down. 2. Nm wire is to be secured with in 12" minmum of entering the electrcial panel and 12" min where it enters the top plate. 3. Wire not phased out in the electrical panel. 4. Unable to see the washing machine p-trap. 5. No returns installed at the front bedrooms. 6. Install nail plates at the bottom of the furring strips at the exterior walls where the wiring passes through or under 7. Water distribution lines are to be under pressure test. | |||
| ROOF VALLEY & METAL | 02/21/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 Install missing blocking and bracing at gable end. Detail GE01 page D2. Blocking and cross bracing are to be 48" o.c. | |||
| WALL SHEATHING | 02/13/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/13/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Install missing blocking and bracing at gable end. Detail GE01 page D2. Blocking and cross bracing are to be 48" o.c. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/09/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/06/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 01/25/2023 | APPROVED | JWALKER |
| Note: 1/24/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped. The rebar back side of garage area needs to be lifted to allow for 3" ground clearance. Remove collapsed soil into footing garage opening. Reseal the poly, center of slab area. | |||
| MONOLITHIC SLAB | 01/24/2023 | Disapproved - NO FEE | JWALKER |
| Note: Slab needs to be tamped. The rebar back side of garage area needs to be lifted to allow for 3" ground clearance. Remove collapsed soil into footing garage opening. Reseal the poly, center of slab area. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/17/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/17/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/28/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 02/09/2023 | 02/09/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Rename your file correctly. | |||
| ENGIN1 | COMPLETE | 02/07/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2023 | 02/07/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/03/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| MECH | COMPLETE | 02/02/2023 | 02/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/25/2022 | 07/25/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/13/2022 | 10/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/12/2022 | 07/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/12/2022 | 07/14/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/12/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/12/2022 | 07/13/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 07/12/2022 | 07/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/12/2022 | 07/19/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/13/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/04/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/04/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/01/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/01/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/01/2022 |
| WATER- TURN ON | ¤25.00 | 08/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/01/2022 |
| INSPECTION - RESIDENTIAL | ¤577.50 | 08/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤163.80 | 08/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/01/2022 |
| SEWER CREDIT | (¤1,342.00) | 08/01/2022 |
| SEWER INSPECTION | ¤25.00 | 08/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/01/2022 |
| SITE PLAN 30 | ¤30.00 | 08/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/01/2022 |
| SURCHARGE FS 533.721 | ¤6.54 | 08/01/2022 |
| SURCHARGE - FS 468.631 | ¤9.81 | 08/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,096.84 |