I want to search for...
Permit #2022070515
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00080-0060 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00080 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 407-432-2344 |
| Location Address: 14 FOREST GROVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/26/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤240,639.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/24/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 04-24-2023 No hot water. | |||
| BLD - BUILDING FINAL | 04/24/2023 | FINAL APPROVED | AGAETANO |
| Note: 4/24/2023 - PREVIOUS INSPECTION NOTES 04-24-2023 No hot water. 04-24-2023 Inspector was able to go back to the site. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/24/2023 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/21/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 04/21/2023 | FINAL APPROVED | EMADISON |
| Note: | |||
| ROW - FINAL APRON (AFTER POUR) | 04/21/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/21/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/03/2023 | APPROVED | EMADISON |
| Note: ** 04/03/23 NEED TO FINISH SOD IN SWALE ON RIGHT SIDE ** NEED TO REMOVE SOD AND DIRT DROPPED IN SWALE IN FRONT OF VACANT ON THE LEFT SIDE. ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND ALONG VACANT ON LEFT. ** HOT PATCH ROAD REPAIR | |||
| ROW- PRE-APRON (PRE-POUR) | 03/27/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ----------------------------------------------------------------------------------------------------------------------- 3/24/2023 - PREVIOUS INSPECTION NOTES ** 03/24/23 CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE DIAGRAM. NEED TO HAVE A MINIMUM 6" X 6" FOR CULVERT MITERED END FOOTERS. ________________________________________________________________________________________________________________ 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/22/23 NOTHING HAS CHANGED SINCE LAST INSPECTION. _________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 STILL NOT READY FOR INSPECTION SEE ATTACHED PHOTO FOR INSPECTION REPORT _______________________________________________________________________________________________________________________ 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 NOT READY FOR INSPECTION. PLEASE SEE ATTACHED PHOTO FOR INSPECTION REPORT. | |||
| U-CROSS CONNECTION | 03/27/2023 | APPROVED - AS NOTED | DHANEY |
| Note: Yard not installed yet - no cross cn. . | |||
| ELECTRIC - EARLY POWER | 03/27/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 03-27-2023 FPL notified at 11:21 am Note to superintendent. Homeowners and realtor on site. Sewer tie in line is broken. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/24/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: ** 03/24/23 CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE DIAGRAM. NEED TO HAVE A MINIMUM 6" X 6" FOR CULVERT MITERED END FOOTERS. ________________________________________________________________________________________________________________ 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/22/23 NOTHING HAS CHANGED SINCE LAST INSPECTION. _________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 STILL NOT READY FOR INSPECTION SEE ATTACHED PHOTO FOR INSPECTION REPORT _______________________________________________________________________________________________________________________ 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 NOT READY FOR INSPECTION. PLEASE SEE ATTACHED PHOTO FOR INSPECTION REPORT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: ** 03/22/23 NOTHING HAS CHANGED SINCE LAST INSPECTION. _________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 STILL NOT READY FOR INSPECTION SEE ATTACHED PHOTO FOR INSPECTION REPORT _______________________________________________________________________________________________________________________ 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 NOT READY FOR INSPECTION. PLEASE SEE ATTACHED PHOTO FOR INSPECTION REPORT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: ** 03/20/23 STILL NOT READY FOR INSPECTION SEE ATTACHED PHOTO FOR INSPECTION REPORT _______________________________________________________________________________________________________________________ 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 NOT READY FOR INSPECTION. PLEASE SEE ATTACHED PHOTO FOR INSPECTION REPORT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/17/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: ** 03/17/23 NOT READY FOR INSPECTION. PLEASE SEE ATTACHED PHOTO FOR INSPECTION REPORT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/16/2023 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 02/14/2023 | APPROVED | RMARTIN |
| Note: 2/8/2023 - PREVIOUS INSPECTION NOTES 2/8/23 NEED TO HAVE THE CITY APPROVED ENERGY CALCS. ON SITE THAT MATCH THE INSTALLED WINDOWS. NEED TO HAVE ALL HOLDS AT BUILDING DEPT. OFF REVISIONS/PLANS FOR ENERGY CALCS. AND HEAT LOAD BEFORE RE-SCHEDULING INSPECTIONS 2/7/2023 - PREVIOUS INSPECTION NOTES 2/6/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/2/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. 02-02-2023 1. Energy calcs not on site. 2. Second floor window installed incorrectly and needs to be insulated at jambs. 02-06-2023 1. Energy calcs do not match window U Factor. 2. Second floor window installed incorrectly and needs to be insulated at jambs 02-07-2023 Need revised energy calcs on site. | |||
| U - SEWER TIE IN | 02/09/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUYAL INSPECTION | |||
| INSULATION | 02/08/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 2/8/23 NEED TO HAVE THE CITY APPROVED ENERGY CALCS. ON SITE THAT MATCH THE INSTALLED WINDOWS. NEED TO HAVE ALL HOLDS AT BUILDING DEPT. OFF REVISIONS/PLANS FOR ENERGY CALCS. AND HEAT LOAD BEFORE RE-SCHEDULING INSPECTIONS 2/7/2023 - PREVIOUS INSPECTION NOTES 2/6/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/2/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. 02-02-2023 1. Energy calcs not on site. 2. Second floor window installed incorrectly and needs to be insulated at jambs. 02-06-2023 1. Energy calcs do not match window U Factor. 2. Second floor window installed incorrectly and needs to be insulated at jambs 02-07-2023 Need revised energy calcs on site. | |||
| INSULATION | 02/07/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 2/6/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/2/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. 02-02-2023 1. Energy calcs not on site. 2. Second floor window installed incorrectly and needs to be insulated at jambs. 02-06-2023 1. Energy calcs do not match window U Factor. 2. Second floor window installed incorrectly and needs to be insulated at jambs 02-07-2023 Need revised energy calcs on site. | |||
| INSULATION | 02/06/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection 2/2/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. 02-02-2023 1. Energy calcs not on site. 2. Second floor window installed incorrectly and needs to be insulated at jambs. 02-06-2023 1. Energy calcs do not match window SHGC for SGD or windows. 2. Second floor window installed incorrectly and needs to be insulated at jambs 3. Approved Energy Calcs not on site. | |||
| INSULATION | 02/03/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 2/2/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. 02-02-2023 1. Energy calcs not on site. 2. Second floor window installed incorrectly and needs to be insulated at jambs. | |||
| INSULATION | 02/02/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. 02-02-2023 1. Energy calcs not on site. 2. Second floor window installed incorrectly and needs to be insulated at jambs. | |||
| ALL ROUGH | 01/30/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 01-30-2023 Energy calcs not on site for window U Factor and SHGC inspection. Check at next inspection. | |||
| LATH/BRICK/ WATER BARRIER | 01/27/2023 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 01/17/2023 | APPROVED | JMUNSON |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/13/2023 | APPROVED | AGAETANO |
| Note: 1/12/2023 - PREVIOUS INSPECTION NOTES 1/5/2023 - PREVIOUS INSPECTION NOTES 1/4/2023 - PREVIOUS INSPECTION NOTES 01-04-2023 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 1/5/23 - CAN NOT READ THE DETAILS ON PAGES MARKED S3 WITH THE MINI SET OF PLANS ON SITE. NEED A FULL SET OF PLANS. 01-12-2023 S3.0 Bearing wall detail not installed as per plans. Highlighted on drawings. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/12/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/5/2023 - PREVIOUS INSPECTION NOTES 1/4/2023 - PREVIOUS INSPECTION NOTES 01-04-2023 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 1/5/23 - CAN NOT READ THE DETAILS ON PAGES MARKED S3 WITH THE MINI SET OF PLANS ON SITE. NEED A FULL SET OF PLANS. 01-12-2023 S3.0 Bearing wall detail not installed as per plans. Highlighted on drawings. | |||
| ROOF VALLEY & METAL | 01/10/2023 | APPROVED | AGAETANO |
| Note: 01-10-2023 Please remove trash prior to next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/05/2023 | Disapproved - NO FEE | FWILLIS |
| Note: 1/4/2023 - PREVIOUS INSPECTION NOTES 01-04-2023 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 1/5/23 - CAN NOT READ THE DETAILS ON PAGES MARKED S3 WITH THE MINI SET OF PLANS ON SITE. NEED A FULL SET OF PLANS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 01-04-2023 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. | |||
| WALL SHEATHING | 12/29/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 12/28/2022 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 12/09/2022 | APPROVED | RMARTIN |
| MONOLITHIC SLAB | 12/02/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/30/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/30/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/06/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| ENGIN1 | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/28/2022 | 12/28/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/21/2022 | 12/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/21/2022 | 12/21/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM home shfled slightly to the right | |||
| BLD | COMPLETE | 07/13/2022 | 07/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/13/2022 | 07/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/13/2022 | 07/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/13/2022 | 07/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/13/2022 | 07/19/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/13/2022 | 10/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 04/13/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/13/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| IMPACT FEE FIRE | ¤420.52 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/04/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/04/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/04/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/26/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/26/2022 |
| WATER- TURN ON | ¤25.00 | 07/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/26/2022 |
| INSPECTION - RESIDENTIAL | ¤662.75 | 07/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤187.98 | 07/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/26/2022 |
| SEWER INSPECTION | ¤25.00 | 07/26/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/26/2022 |
| SITE PLAN 30 | ¤30.00 | 07/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/26/2022 |
| SURCHARGE FS 533.721 | ¤7.41 | 07/26/2022 |
| SURCHARGE - FS 468.631 | ¤11.12 | 07/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/26/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/26/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤27,922.12 |