I want to search for...
Permit #2022070575
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00240-0300 |
| CONDITIONED SPACE: 2031 sqft |
| GARAGE: 748 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 268 sqft |
| OPENED PORCH (WITH ROOF) : 140 sqft |
| Total Square Footage: 3187 sqft |
| Block: 00240 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 386-283-7499 |
| Location Address: 7 WHITTLESEY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/05/2022 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JMR III LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤273,387.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
RBI ENTERPRISES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
10 WHITTINGTON DR PALM COAST, FL 32164 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
WILLIAM ROBERT BARRICK
| Status | Location Address | State License Number | Phone |
| CANCEL |
21 CEDARWOOD CT PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2023) | 229-375-9123 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/27/2023 | FINAL APPROVED | RSIMS |
| Note: 7/26/2023 - PREVIOUS INSPECTION NOTES 1. Light @ back garage door is not working 2. Extra construction materials and doc boxes need to be removed before final 3. AHU breaker is undersized 4. No hot water at kitchen island sink 5. Spare guest bathroom door leading to lani requires a switched light 6. Microwave hood vent not connected to duct | |||
| U -UTILITY RESIDENTIAL FINAL | 07/27/2023 | FINAL APPROVED | JHARDING |
| Note: 7/26/2023 - PREVIOUS INSPECTION NOTES 1-repair or replace water meter box,2-pep circuit breaker required to be 20 amp stand alone-no Test 7/25/2023 - PREVIOUS INSPECTION NOTES need access to Epanel for pep circuit breaker inspect/replair/replace damaged water meter box-contact utiity rsyndor@palmcoastgov.com(Rich) | |||
| U -UTILITY RESIDENTIAL FINAL | 07/26/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: 1-repair or replace water meter box,2-pep circuit breaker required to be 20 amp stand alone-no Test 7/25/2023 - PREVIOUS INSPECTION NOTES need access to Epanel for pep circuit breaker inspect/replair/replace damaged water meter box-contact utiity rsyndor@palmcoastgov.com(Rich) | |||
| BLD - BUILDING FINAL | 07/26/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Light @ back garage door is not working 2. Extra construction materials and doc boxes need to be removed before final 3. AHU breaker is undersized 4. No hot water at kitchen island sink 5. Spare guest bathroom door leading to lani requires a switched light 6. Microwave hood vent not connected to duct | |||
| U -UTILITY RESIDENTIAL FINAL | 07/25/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: need access to Epanel for pep circuit breaker inspect/replair/replace damaged water meter box-contact utiity rsyndor@palmcoastgov.com(Rich) | |||
| U-CROSS CONNECTION | 07/25/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 07/24/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 07/24/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/24/2023 | APPROVED | GBERTOLA |
| Note: 7/24/23= CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/24/2023 | APPROVED | GBERTOLA |
| Note: 7/24/23= CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 06/28/23= I SPOKE TO THE CM AND THE OWNER OF THE COMPANY AND THEY WILL RE GRADE THE BACK YARD AND BOTH SIDES OF THE HOUSE CREATING A W SWALE TO THE FRONT AND A BERM ON THE RIGHT SIDE ALSO TO HOLD A STORMWATER ON YOUR SITE . IN THE BACK YARD WATER IS COMING INSIDE THE COVER LANAI, NEED TO LOWER 10 FT 6 INCH Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D)?Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) PER GBERTOLA +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 06/21/23= DRAINAGE CONVAYANCE IS NOT CONSISTENT IMPACTING THE NEIGHBORING LOTS. NOTE TO THE INSPECTOR: WHEN FINAL SURVEY IS REVISE MAKE SURE IS NOT WATER RUNNING TO THE NEGHBORING LOTS . ALSO BUILDER NEED TO CHANGE THE DIRECTION OF THE DOWNSPOUT FROM THE GUTTER IS IMPCTING THE HOME ON THE SIDE WITH THE STORMWATER | |||
| ROW- PROJECT STATUS | 07/18/2023 | APPROVED | GBERTOLA |
| Note: 7/18/23= MEETING WITH THE CM FOR THE GRADING ON THE SIDE AND BACK OF PROPERTY. STILL NEED TO WAIT FOR FINAL SURVEY | |||
| ROW - DRAINAGE | 06/28/2023 | APPROVED | GBERTOLA |
| Note: 6/28/23=correction were made 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= BUILDER NEED TO CHANGE THE DIRECTION OF THE DOWNSPOUT FROM THE GUTTER IS IMPACTING THE HOME ON THE SIDE WITH THE STORMWATER INSPECTOR BE BACK 6/28/23= . House #9 says builder put on Super Gutters and directed them to her home and it is now flooding. Could RBI possibly re-direct water discharge to the front? | |||
| ROW - DRAINAGE | 06/21/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 06/21/23= BUILDER NEED TO CHANGE THE DIRECTION OF THE DOWNSPOUT FROM THE GUTTER IS IMPACTING THE HOME ON THE SIDE WITH THE STORMWATER INSPECTOR BE BACK 6/28/23= . House #9 says builder put on Super Gutters and directed them to her home and it is now flooding. Could RBI possibly re-direct water discharge to the front? | |||
| ROW- PRE-APRON (PRE-POUR) | 06/05/2023 | APPROVED | FSLADISH |
| Note: 06/05/23 PIPES ARE GOOD. LOOKED GOOD AT TIME OF INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 04/26/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:15 PM | |||
| GRAVITY SEWER TEST | 04/10/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 04/10/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 03/06/2023 | APPROVED | TSCHWEERS |
| Note: 3/3/2023 11:35:29 AM- PREVIOUS INSPECTION NOTES 3/2/2023 Dumpster in the way of tank. | |||
| PEP TANK INSTALLATION REQUEST | 03/02/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 3/2/2023 Dumpster in the way of tank. | |||
| LATH/BRICK/ WATER BARRIER | 02/16/2023 | APPROVED | MKRASKI |
| INSULATION | 02/16/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 02/10/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 2/10/2023- previous notes have been rectified EXCEPT #3 (specs show more screws not center brackets), and #2 need manufacturer specs on screws (2 or 3 in jamb) WILL CHECK AT INSULATION. 2/8/2023 - PREVIOUS INSPECTION NOTES 1. Romex around SGD's not strapped properly 2. Large slider missing anchors 3. Double window missing mullbar bracket and anchors 4. Transome window missing in back bathroom 5. Exhaust fan duct needs to be supported every 4' Stopped inspection @ kitchen, make sure all windows are anchored properly | |||
| ALL ROUGH | 02/08/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Romex around SGD's not strapped properly 2. Large slider missing anchors 3. Double window missing mullbar bracket and anchors 4. Transome window missing in back bathroom 5. Exhaust fan duct needs to be supported every 4' Stopped inspection @ kitchen, make sure all windows are anchored properly | |||
| ROOF VALLEY & METAL | 12/08/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/07/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/06/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 12/2/2022 - PREVIOUS INSPECTION NOTES 1. Truss T30 needs engineered letter and repair 2. Truss T21 needs engineered letter and repair 3. Anchor missing over back door to the garage (leading outside) Stopped inspection 12-6-22 First 2 items checked from the list above wee not resolved, no letter on site for repairs. inspection stopped, make all corrections listed above prior to re-calling the inspection | |||
| WALL SHEATHING | 12/02/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Truss T30 needs engineered letter and repair 2. Truss T21 needs engineered letter and repair 3. Anchor missing over back door to the garage (leading outside) Stopped inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/02/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 10/21/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 10/20/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Back deep footing pads require per plans 4 #5s tied each way | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/17/2022 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 10/06/2022 | APPROVED | RGROSS |
| Note: Builder has complied. 9/30/2022 - PREVIOUS INSPECTION NOTES 09/30/22 NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots | |||
| ROW - DRAINAGE | 09/30/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 09/30/22 NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots inspector be back on 10/6/22 | |||
| WATER METER INSTALLATION REQUEST | 08/17/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/21/2023 | 07/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/26/2023 | 06/26/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey. NOC is expired. Please submit current NOC and resubmit final survey. | |||
| BLD | COMPLETE | 02/09/2023 | 02/14/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/02/2023 | 02/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/02/2023 | 02/07/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/02/2023 | 02/03/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/02/2022 | 12/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/01/2022 | 12/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/01/2022 | 12/01/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/04/2022 | 08/04/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/27/2022 | 07/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/27/2022 | 07/28/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front setback should be from the closet point to property line. Should be from the right side of garage to property line. | |||
| ENGIN1 | COMPLETE | 07/27/2022 | 07/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/27/2022 | 08/03/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/26/2022 | 07/27/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. OK 2. Provide 20 min door between the living area and the garage R302.5.1 | |||
| ZON | HOLD | 07/26/2022 | 07/27/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Issue not addressed Site Plan; Missing the rear setback of home | |||
| SWALE | COMPLETE | 07/14/2022 | 10/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/13/2022 | 07/18/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide a legible Product Approval Sheet. Per F.S. 471.025 and F.A.C. 61 G15-23.005. 2. Provide 20 min door between the living area and the garage R302.5.1 | |||
| CUSVC | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/13/2022 | 07/15/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/13/2022 | 07/19/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/13/2022 | 07/19/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Sitte Plan; Missing the rear setback of home |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/28/2023 |
| REINSPECTION FEE | ¤40.00 | 07/28/2023 |
| REINSPECTION FEE | ¤40.00 | 07/28/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/28/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/28/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/28/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/28/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/28/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/05/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/05/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/05/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/05/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/05/2022 |
| SEWER CREDIT | (¤1,147.00) | 08/05/2022 |
| SEWER INSPECTION | ¤25.00 | 08/05/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/05/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/05/2022 |
| SITE PLAN 30 | ¤30.00 | 08/05/2022 |
| SURCHARGE FS 533.721 | ¤3.29 | 08/05/2022 |
| SURCHARGE - FS 468.631 | ¤4.94 | 08/05/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/05/2022 |
| WATER-METER | ¤467.09 | 08/05/2022 |
| WATER- TURN ON | ¤25.00 | 08/05/2022 |
| WATER- TURN ON | ¤25.00 | 08/05/2022 |
| ADJUSTMENT 50% | (¤509.20) | 08/05/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/05/2022 |
| INSPECTION - RESIDENTIAL | ¤770.00 | 08/05/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤218.40 | 08/05/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/05/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/05/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/05/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/05/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/05/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/05/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/05/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/05/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/05/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,411.21 |