I want to search for...
Permit #2022070582
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00450-0100 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00450 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 475-276-4384 |
| Location Address: 87 FREEPORT LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/02/2023 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤240,639.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/12/2024 | FINAL APPROVED | JSTEWART |
| Note: 8/8/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/8/2024 10:49:42 AM *** 1. Please raise ODU pad for 3" clearence. FBCR M1305.1.4.1 2. Please install PVC piping and secure to wall at hot water preassure release dicharge, between 6" and 24" off grade. | |||
| BLD - BUILDING FINAL | 08/08/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/8/2024 10:49:42 AM *** 1. Please raise ODU pad for 3" clearence. FBCR M1305.1.4.1 2. Please install PVC piping and secure to wall at hot water preassure release dicharge, between 6" and 24" off grade. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/31/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 07/31/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 07/31/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/31/2024 2:41:40 PM *** lower sewer clean out so not chopped by mower-flush to grade | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/30/2024 | APPROVED | EMADISON |
| Note: 7/26/2024 - PREVIOUS INSPECTION NOTES ** 07/26/24 RIGHT REAR ALONG PROPERTY BUILDER NEEDS TO RE-ESTABLISH THE INSIDE SWALE KEEP IN MIND The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe OF THE SLOPE ** NOTE WHITE PAINT WHERE CORRECTIONS ARE REQUIRED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/26/2024 | APPROVED | EMADISON |
| Note: ** 07/26/24 REVIEWED FINAL SURVEY WITH CITY SURVEYORS DUE TO CHANGE IN SLAB ELEVATION WHO HAS DETERMINED THAT SURVEY SHOWS DRSINAGE WILL WORK AND ELEVATION OF STRUCTURE WILL NOT HAVE ANY NEGATIVE IMPACT ON ADJACENT PROPERTIES. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/26/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/26/24 RIGHT REAR ALONG PROPERTY BUILDER NEEDS TO RE-ESTABLISH THE INSIDE SWALE KEEP IN MIND The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe OF THE SLOPE ** NOTE WHITE PAINT WHERE CORRECTIONS ARE REQUIRED | |||
| U-CROSS CONNECTION | 07/22/2024 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 07/18/2024 | APPROVED | JWALKER |
| Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 Devices and outlets not installed, no drywall, electrical panel not complete. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/23/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 05/03/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL COQUINA ROCK BEFORE BACKFILLING PLUMBING TRENCHES, AND HAVE PORTABLE RESTROOM BEFORE NEXT INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 05/03/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL COQUINA ROCK BEFORE BACKFILLING PLUMBING TRENCHES, AND HAVE PORTABLE RESTROOM BEFORE NEXT INSPECTION THIS WAS A VIRTRUAL INSPECTION | |||
| INSULATION | 04/03/2024 | APPROVED | BTAYLOR |
| Note: 4/2/2024 - PREVIOUS INSPECTION NOTES 4/2/24 Multiple water supply pipes and plumbing vent, and drian pipes missing fire blocking at the top plates and floor penetrations. Check all. 3/22/2024 - PREVIOUS INSPECTION NOTES 3/22/24- Walked building with superintedent, has a list of items that need to be addressed before moving forward. (Firestop, fastening of romex, register boots corners mastic, and seal for drywall, etc). Please on reinspect check mechanicals (all rough) and Insulation. 2/22/2024 - PREVIOUS INSPECTION NOTES 2/21/2024 - PREVIOUS INSPECTION NOTES 2/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. 02-08-2024 1. 1-24-2024 Issue not resolved. Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. Inspection stopped. 02-21-2024 Above issues not resolved. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. 02-22-2024 Above issues not resolved. 2,3,4 1. Insulation missing garage wall. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. | |||
| INSULATION | 04/02/2024 | Disapproved - NO FEE | JWALKER |
| Note: 4/2/24 Multiple water supply pipes and plumbing vent, and drian pipes missing fire blocking at the top plates and floor penetrations. Check all. 3/22/2024 - PREVIOUS INSPECTION NOTES 3/22/24- Walked building with superintedent, has a list of items that need to be addressed before moving forward. (Firestop, fastening of romex, register boots corners mastic, and seal for drywall, etc). Please on reinspect check mechanicals (all rough) and Insulation. 2/22/2024 - PREVIOUS INSPECTION NOTES 2/21/2024 - PREVIOUS INSPECTION NOTES 2/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. 02-08-2024 1. 1-24-2024 Issue not resolved. Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. Inspection stopped. 02-21-2024 Above issues not resolved. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. 02-22-2024 Above issues not resolved. 2,3,4 1. Insulation missing garage wall. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. | |||
| INSULATION | 03/22/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 3/22/24- Walked building with superintedent, has a list of items that need to be addressed before moving forward. (Firestop, fastening of romex, register boots corners mastic, and seal for drywall, etc). Please on reinspect check mechanicals (all rough) and Insulation. 2/22/2024 - PREVIOUS INSPECTION NOTES 2/21/2024 - PREVIOUS INSPECTION NOTES 2/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. 02-08-2024 1. 1-24-2024 Issue not resolved. Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. Inspection stopped. 02-21-2024 Above issues not resolved. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. 02-22-2024 Above issues not resolved. 2,3,4 1. Insulation missing garage wall. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. | |||
| INSULATION | 02/22/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 2/21/2024 - PREVIOUS INSPECTION NOTES 2/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. 02-08-2024 1. 1-24-2024 Issue not resolved. Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. Inspection stopped. 02-21-2024 Above issues not resolved. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. 02-22-2024 Above issues not resolved. 2,3,4 1. Insulation missing garage wall. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. 5. Please remove trash prior to next inspection. Empty dumpster on site. | |||
| INSULATION | 02/21/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 2/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. 02-08-2024 1. 1-24-2024 Issue not resolved. Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. Inspection stopped. 02-21-2024 Above issues not resolved. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. | |||
| INSULATION | 02/08/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. 02-08-2024 1. 1-24-2024 Issue not resolved. Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. 2. Foil removed from first floor bath CMU wall. 3. Fire foam missed on first and second floor walls. Check all. 4. 2nd floor bedroom window jambs not insulated. Inspection stopped. | |||
| ALL ROUGH | 01/24/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/24/24- Please obtain a revision of energy calcs for ducts on 2nd floor installed, sizes dont match. and above door wall returns calls for 24x4=area of 96 square inches, installed is 6x10=area of 60 square inches. WILL CHECK AT INSULATION 1/17/2024 - PREVIOUS INSPECTION NOTES 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. | |||
| ALL ROUGH | 01/17/2024 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 11/30/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. | |||
| ALL ROUGH | 11/30/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 11/17/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. 11-30-2023 1. 11-27 -23 Energy calcs rejected. 2. Approved energy calcs and mechanical layout not on site. Inspection stopped. Inspection stopped. | |||
| ALL ROUGH | 11/17/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 11/13/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. 11-17-2023 1.Energy calcs have been rejected on 11-13-2023 2. Drawings are wet and not readable 3. Approved energy calcs not on site. Inspection stopped. | |||
| ALL ROUGH | 11/13/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. | |||
| ALL ROUGH | 11/13/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. 11-13-2023 1. Second floor subflooring not nailed as noted on earlier inspections. 2. Job box is a mess. Please organize. 3. Please submit energy calcs. UFactor and SHGC do not match or need to be a better rating. 4. Shield plates on first floor bath plumbing line need to be installed to the bottom of the floor joists. Inspection stopped. | |||
| ALL ROUGH | 11/01/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/1/23: Inspection stopped! Must resolve all deficiencies before scheduling re-inspection. Example: 5ft. head pressure still failed. 10/25/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. | |||
| ALL ROUGH | 10/25/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. Inspection stopped. 10-25-2023 1. Updated 9-6-2023 electrical plans not on site. 2. Job box and drawings are a mess. Please organize. 3. Head test failed. 4. Second floor underlayment not nailed. Check all See note 4 from 8-31-2023 5. Hole in second floor underlayment closet. | |||
| LATH/BRICK/ WATER BARRIER | 09/06/2023 | APPROVED | AGAETANO |
| Note: 8/4/2023 - PREVIOUS INSPECTION NOTES 8-4-23 1. Not ready. | |||
| ALL ROUGH | 08/31/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 8/29/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 08-31-2023 1. 3" Plumbing line on first floor not installed as per code. 2319.5 Notching and boring. Please install properly and repair and submit engineering for repaired girder to the building department and have on site for inspection. 2. Energy calcs not approved packet on site. 3. Head test failed. 4. Second floor underlayment not nailed completely. Check all areas. 5. Please remove high grass and weeds at job box for access. Inspection stopped. | |||
| ALL ROUGH | 08/29/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspectiom stopped. | |||
| ELECTRIC - EARLY POWER | 08/11/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 08-11-2023 Devices and outlets not installed, no drywall, electrical panel not complete. | |||
| LATH/BRICK/ WATER BARRIER | 08/04/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-4-23 1. Not ready. | |||
| ALL ROUGH | 07/18/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 07-18-2023 1. Second floor window not installed properly. 2. Head test failed. 3. D-4 FB12 & D5 WS04 no moisture barrier installed. 4. Mechanical layout and energy calcs not on site. 5. Wires not phased out. 6. Job site is a mess. Please remove trash prior to next inspection. Inspectiom stopped. | |||
| ROOF VALLEY & METAL | 07/14/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2023 | APPROVED | FWILLIS |
| Note: 7/5/2023 - PREVIOUS INSPECTION NOTES 7-5-23 Same notres as prior inspection 1. Multiple details not followed in plans. 2. Need second story structural page. circled on plans. (please check and correct all deatils prior to next inspection) engineering has not been checked. 6/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 6/5/2023 - PREVIOUS INSPECTION NOTES 6/2/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-05-2023 Please see 06-02-2023 Notes. 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-06-2023 Back left lintel is damaged. Please provide engineering concerning the back left lintel is structually sound or install new lintel. Remove soil from right side cell. 6-27-23 1. Multiple details not followed in plans. 2. Need second story structural page. circled on plans. engineering has not been checked. | |||
| ROOF SHEATHING | 07/07/2023 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 07/05/2023 | APPROVED | LMILLER |
| Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 06-29-2023 Wires need to be protected from ground. NEC 230.50 | |||
| ELECTRIC - EARLY POWER | 07/05/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/05/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 7-5-23 Same notres as prior inspection 1. Multiple details not followed in plans. 2. Need second story structural page. circled on plans. (please check and correct all deatils prior to next inspection) engineering has not been checked. 6/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 6/5/2023 - PREVIOUS INSPECTION NOTES 6/2/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-05-2023 Please see 06-02-2023 Notes. 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-06-2023 Back left lintel is damaged. Please provide engineering concerning the back left lintel is structually sound or install new lintel. Remove soil from right side cell. 6-27-23 1. Multiple details not followed in plans. 2. Need second story structural page. circled on plans. engineering has not been checked. | |||
| ELECTRIC-TUG | 06/29/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 06-29-2023 Wires need to be protected from ground. NEC 230.50. NEC 300.5 Underground Installations. | |||
| ELECTRIC - EARLY POWER | 06/29/2023 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 06/27/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 6/5/2023 - PREVIOUS INSPECTION NOTES 6/2/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-05-2023 Please see 06-02-2023 Notes. 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-06-2023 Back left lintel is damaged. Please provide engineering concerning the back left lintel is structually sound or install new lintel. Remove soil from right side cell. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/27/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 6/5/2023 - PREVIOUS INSPECTION NOTES 6/2/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-05-2023 Please see 06-02-2023 Notes. 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-06-2023 Back left lintel is damaged. Please provide engineering concerning the back left lintel is structually sound or install new lintel. Remove soil from right side cell. 6-27-23 1. Multiple details not followed in plans. 2. Need second story structural page. circled on plans. engineering has not been checked. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/26/2023 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 06/06/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 6/5/2023 - PREVIOUS INSPECTION NOTES 6/2/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-05-2023 Please see 06-02-2023 Notes. 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-06-2023 Back left lintel is damaged. Please provide engineering concerning the back left lintel is structually sound or install new lintel. Remove soil from right side cell. | |||
| TIE BEAM / LINTEL | 06/05/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 6/2/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. 06-05-2023 Please see 06-02-2023 Notes. 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. | |||
| TIE BEAM / LINTEL | 06/02/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 06-02-2023 8 1/2" X 11 drawings are too small to read. Please have a full set of approved readable drawings on site for all inspections. | |||
| TIE BEAM / LINTEL | 05/30/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 05-30-2023 1. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. [F] 501.2 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. | |||
| MONOLITHIC SLAB | 05/16/2023 | APPROVED | AGAETANO |
| Note: 5/12/2023 - PREVIOUS INSPECTION NOTES 5/11/2023 - PREVIOUS INSPECTION NOTES 05-12-2023 1. Termite bond not on site. 2. Water line through footing not protected. SLEEVES… PIPES PASSING THROUGH FOUNDATION WALLS P2603.4 SLEEVES… (SLEEVES MUST BE 2 PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE WALL 3. Rebar minimum clearance. (minimum 3" clearance is required FBC R404.1.3.3.7.4 Check all Inspection stopped. Check head test next inspection. | |||
| MONOLITHIC SLAB | 05/12/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 5/11/2023 - PREVIOUS INSPECTION NOTES 05-12-2023 1. Termite bond not on site. 2. Water line through footing not protected. SLEEVES… PIPES PASSING THROUGH FOUNDATION WALLS P2603.4 SLEEVES… (SLEEVES MUST BE 2 PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE WALL 3. Rebar minimum clearance. (minimum 3" clearance is required FBC R404.1.3.3.7.4 Check all Inspection stopped. Check head test next inspection. | |||
| MONOLITHIC SLAB | 05/11/2023 | CANCELLED BY APPLICANT | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/02/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ALL COQUINA ROCK BEFORE BACKFILLING PLUMBING TRENCHES, AND HAVE PORTABLE RESTROOM BEFORE NEXT INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 04/13/2023 | APPROVED | CSTONE |
| Note: 3/20/2023 9:54:19 AM- PREVIOUS INSPECTION NOTES not cleared | |||
| WATER METER INSTALLATION REQUEST | 03/16/2023 | Disapproved - NO FEE | CSTONE |
| Note: not cleared | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 01/09/2023 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 07/22/2024 | 07/22/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because there is a prior inspection needed. Inspection 7910 needed before final survey. Once 7910 is resulted pass then please reupload your final survey. | |||
| MECH | COMPLETE | 02/13/2024 | 02/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/18/2024 | 01/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/27/2023 | 11/28/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide entire Energy calc with heatload and duct layout signed by the AC contractor (Second Request) | |||
| MECH | HOLD | 11/14/2023 | 11/14/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide entire Energy calc with heatload and duct layout signed by the AC contractor 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| BLD | COMPLETE | 11/09/2023 | 11/09/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/06/2023 | 07/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/16/2023 | 06/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC MISSING NOTARY AT BOTTOM | |||
| MECH | COMPLETE | 02/15/2023 | 02/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 02/14/2023 | 02/14/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your files correctly | |||
| PLENV | COMPLETE | 01/09/2023 | 01/09/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Approved After Action Report has been accepted. | |||
| SW1 | COMPLETE | 01/09/2023 | 01/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/09/2023 | 01/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/09/2023 | 01/10/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes made for engineering and stormwater only | |||
| ENGIN1 | HOLD | 10/24/2022 | 10/24/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation is off from center of road elevation by .75'+/-. | |||
| MECH | COMPLETE | 09/06/2022 | 09/06/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/06/2022 | 09/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/06/2022 | 09/13/2022 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM LEFT SIDE STILL SHOWS YOUR SDRAINAGE WILL HAVE A NEGATIVE IMPACT ON THE ADJACENT PROPERTY. NEED TO RESUBMITT A SITE PLAN SHOWING POSITIVE FLOW TO THE FRONT WITHOUT IMPACTING ADJACENT PROPERTIES | |||
| PLENV | HOLD | 09/06/2022 | 09/08/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Comments not addressed. Staff conducted a site visit on 7/21/22 and found Potentially Occupied Gopher Tortoise Burrows. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| PLENV | HOLD | 07/20/2022 | 07/21/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 7/21/22 and found Potentially Occupied Gopher Tortoise Burrows. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| BLD | COMPLETE | 07/14/2022 | 07/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 07/14/2022 | 07/18/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric first floor plan | |||
| ENGIN1 | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/14/2022 | 07/14/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | HOLD | 07/14/2022 | 07/20/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE DRAINAGE PATTERN IS DRAINING TO THE AJACENT LOT TO THE LEFT NEED TO KEEP ALL DRAINAGE ON YOUR LOT | |||
| ZON | COMPLETE | 07/14/2022 | 07/20/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/14/2022 | 01/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/25/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/17/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/17/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/02/2023 |
| IMPACT FEE FIRE | ¤388.65 | 02/02/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/02/2023 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/02/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 02/02/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/02/2023 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/02/2023 |
| SURCHARGE FS 533.721 | ¤2.90 | 02/02/2023 |
| SURCHARGE - FS 468.631 | ¤4.35 | 02/02/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/02/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/02/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/02/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/02/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/02/2023 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 02/02/2023 |
| SEWER INSPECTION | ¤25.00 | 02/02/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/02/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/02/2023 |
| SITE PLAN 30 | ¤30.00 | 02/02/2023 |
| WATER- TURN ON | ¤25.00 | 02/02/2023 |
| ADJUSTMENT 50% | (¤440.37) | 02/02/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/02/2023 |
| INSPECTION - RESIDENTIAL | ¤662.75 | 02/02/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤187.98 | 02/02/2023 |
| CONNECTION FEES | ¤1,166.26 | 02/02/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,074.62 |