I want to search for...

Permit #2022070632

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00030-0530
CONDITIONED SPACE: 1906 sqft
GARAGE: 400 sqft
OPENED PORCH (WITH ROOF) : 20 sqft
Total Square Footage: 2326 sqft
Block: 00030
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 470-817-1259
Location Address: 64 FOXHALL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/11/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL N

NAPLES, FL 34103

Lot: 0530
Contracted Stated Job Value: ¤240,639.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/14/2023 FINAL APPROVED BTAYLOR
Note: 12/12/2023 - PREVIOUS INSPECTION NOTES 1. No hot water. 2. No power to the outlets on the top of stairs knee wall 3. Seal the AHU closet wall and ceiling penetrations at the flex duct and the water heater conduit. 4. 2nd floor rear left side bed. Light is not working. Must be a switched controlled light or outlet. 5. The oulet at the right side of the garage to house door is not GFI protected. 6. The energy calucations are missing pages. Please have the full set onsite. Appliance types. 7. Termite cert has not been posted.
BLD - BUILDING FINAL 12/12/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. No hot water. 2. No power to the outlets on the top of stairs knee wall 3. Seal the AHU closet wall and ceiling penetrations at the flex duct and the water heater conduit. 4. 2nd floor rear left side bed. Light is not working. Must be a switched controlled light or outlet. 5. The oulet at the right side of the garage to house door is not GFI protected. 6. The energy calucations are missing pages. Please have the full set onsite. Appliance types. 7. Termite cert has not been posted.
ELECTRIC TEMP POLE 12/08/2023 APPROVED RSIMS
Note: 12/8/23: Temp Pole is not required as this project has already completed an approved Early Power Inspection. Inspector Notes from Inspection 2190 07/06/2023- release to FPL at 11:00AM 7/5/2023 - PREVIOUS INSPECTION NOTES painters werfe inside spraying paint, (need reschedule when inspection can be performed)
U-CROSS CONNECTION 12/08/2023 APPROVED DHANEY
U - SEWER TIE IN 12/08/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WASA VIRTUAL INSPECTION
ROW - FINAL APRON (AFTER POUR) 12/07/2023 APPROVED EMADISON
Note: ** 12/07/23 REPAIRS MADE TO MITERED CONCRETE ON RIGHT SIDE ___________________________________________________________________________________________________________________ 11/27/2023 - PREVIOUS INSPECTION NOTES ** 11/27/23 RIGHT5 SIDE MITERED CONCRETE END IS CRACKED 1/4 " WIDE ALL THE WAY THROUGH ** SEE ATTACHED PHOTO OF THIS INSPECTION ** 11/21/23 BEFORE STORMWATER ROW FINAL IS APPROVED ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** NEED TO MATCH EXITING GRADE WITH VACANT ON LEFT IN ROW ** SEED AND STRAW REQUIRED ON ALL BARE EARTH ALONG PROPERTY LINE AND VACANT ON LEFT SIDE AND REAR ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT AND EASEMENT IN REAR ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION _____________________________________________________________________________________________________________________ 11/15/2023 9:03:11 AM- PREVIOUS INSPECTION NOTES ** 11/14/23 ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** ROAD SIDE SWALE ON RIGHT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** BOTH SIDES NEED TO MATCH EXISTING GRADE ** NEED TO REPAIR SWALE IN FRONT OF VACANT AND SOD ALL BARE AREAS TO MATCH EXISTING GRADE ** NEED TO SEED AND STRAW ABOVE ROW AT VACANT WHERE DISTURBED AS WELL AS ALONG THE PROPERTY LINE ON LEFT SIDE
ROW - STORMWATER FINAL 12/07/2023 APPROVED EMADISON
Note:
U -UTILITY RESIDENTIAL FINAL 11/27/2023 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 11/27/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/27/23 BEFORE STORMWATER ROW FINAL ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW NEEDS TO MATCH EXISTING GRADE OF VACANT ON LEFT **( NEED TO RE[PAIR SOD IN FRONT OF VACANT ** HOT PATCH ROAD REPAIR REQUIRED ** REMOVE ALL TRASH AND CONSTRUCRTION DEBRIS FROM VACANT AND EASENENT IN REAR ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION Inspector Notes from Inspection 9465 ** 11/21/23 BEFORE STORMWATER ROW FINAL ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** 11/21/23 BEFORE STORMWATER ROW FINAL IS APPROVED ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** NEED TO MATCH EXITING GRADE WITH VACANT ON LEFT IN ROW ** SEED AND STRAW REQUIRED ON ALL BARE EARTH ALONG PROPERTY LINE AND VACANT ON LEFT SIDE AND REAR ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT AND EASEMENT IN REAR ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION _____________________________________________________________________________________________________________________ 11/15/2023 9:03:11 AM- PREVIOUS INSPECTION NOTES ** 11/14/23 ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** ROAD SIDE SWALE ON RIGHT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** BOTH SIDES NEED TO MATCH EXISTING GRADE ** NEED TO REPAIR SWALE IN FRONT OF VACANT AND SOD ALL BARE AREAS TO MATCH EXISTING GRADE ** NEED TO SEED AND STRAW ABOVE ROW AT VACANT WHERE DISTURBED AS WELL AS ALONG THE PROPERTY LINE ON LEFT SIDE
ROW - FINAL APRON (AFTER POUR) 11/27/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/27/23 RIGHT5 SIDE MITERED CONCRETE END IS CRACKED 1/4 " WIDE ALL THE WAY THROUGH ** SEE ATTACHED PHOTO OF THIS INSPECTION ** 11/21/23 BEFORE STORMWATER ROW FINAL IS APPROVED ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** NEED TO MATCH EXITING GRADE WITH VACANT ON LEFT IN ROW ** SEED AND STRAW REQUIRED ON ALL BARE EARTH ALONG PROPERTY LINE AND VACANT ON LEFT SIDE AND REAR ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT AND EASEMENT IN REAR ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION _____________________________________________________________________________________________________________________ 11/15/2023 9:03:11 AM- PREVIOUS INSPECTION NOTES ** 11/14/23 ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** ROAD SIDE SWALE ON RIGHT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** BOTH SIDES NEED TO MATCH EXISTING GRADE ** NEED TO REPAIR SWALE IN FRONT OF VACANT AND SOD ALL BARE AREAS TO MATCH EXISTING GRADE ** NEED TO SEED AND STRAW ABOVE ROW AT VACANT WHERE DISTURBED AS WELL AS ALONG THE PROPERTY LINE ON LEFT SIDE
ROW FIELD SURVEY /GRADING CERTIFICATION 11/21/2023 APPROVED - AS NOTED EMADISON
Note: ** 11/21/23 BEFORE STORMWATER ROW FINAL ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** 11/21/23 BEFORE STORMWATER ROW FINAL IS APPROVED ** ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** NEED TO MATCH EXITING GRADE WITH VACANT ON LEFT IN ROW ** SEED AND STRAW REQUIRED ON ALL BARE EARTH ALONG PROPERTY LINE AND VACANT ON LEFT SIDE AND REAR ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT AND EASEMENT IN REAR ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION _____________________________________________________________________________________________________________________ 11/15/2023 9:03:11 AM- PREVIOUS INSPECTION NOTES ** 11/14/23 ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** ROAD SIDE SWALE ON RIGHT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ** BOTH SIDES NEED TO MATCH EXISTING GRADE ** NEED TO REPAIR SWALE IN FRONT OF VACANT AND SOD ALL BARE AREAS TO MATCH EXISTING GRADE ** NEED TO SEED AND STRAW ABOVE ROW AT VACANT WHERE DISTURBED AS WELL AS ALONG THE PROPERTY LINE ON LEFT SIDE
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/21/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 11/15/2023 Disapproved - NO FEE EMADISON
Note: ** 11/14/23 ROAD SIDE SWALE ON LEFT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW (NOTE WHITE PAINT) ** ROAD SIDE SWALE ON RIGHT SIDE NEEDS TO BE RE-ESTABLISHED CENTER OF SWALE NEEDS TO BE 8 FT FROM EDGE OF ROAD FLOW IS INCONSISTANT HIGH AND LOW ( NOTE WHITE PAINT) ** BOTH SIDES NEED TO MATCH EXISTING GRADE ** NEED TO REPAIR SWALE IN FRONT OF VACANT AND SOD ALL BARE AREAS TO MATCH EXISTING GRADE ** NEED TO SEED AND STRAW ABOVE ROW AT VACANT WHERE DISTURBED AS WELL AS ALONG THE PROPERTY LINE ON LEFT SIDE
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/15/2023 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 07/07/2023 APPROVED - AS NOTED EMADISON
Note: ** 07/07/23 READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________________________ 7/5/2023 - PREVIOUS INSPECTION NOTES ** 07/05/23 SITE NOT READFY FOR INSPECTION NO FORMS ** SEE ATTACHED PHOTOS
ELECTRIC - EARLY POWER 07/06/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: 07/06/2023- release to FPL at 11:00AM 7/5/2023 - PREVIOUS INSPECTION NOTES painters werfe inside spraying paint, (need reschedule when inspection can be performed)
ELECTRIC - EARLY POWER 07/05/2023 Disapproved - NO FEE LMILLER
Note: painters werfe inside spraying paint, (need reschedule when inspection can be performed)
ROW- PRE-APRON (PRE-POUR) 07/05/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/05/23 SITE NOT READFY FOR INSPECTION NO FORMS ** SEE ATTACHED PHOTOS
INSULATION 06/08/2023 APPROVED AGAETANO
Note: 6/5/2023 - PREVIOUS INSPECTION NOTES
INSULATION 06/05/2023 CANCELLED BY APPLICANT AGAETANO
ALL ROUGH 05/23/2023 APPROVED TSTAUFFACHER
Note: 5/18/2023 - PREVIOUS INSPECTION NOTES 05/18/2023- Met with super and reigional rep along with talking to framer to find resolution. Opportunuty to look at a spray that acts as a presevative to spray between the raw non treated wood and concrete block bond beam. Suggested they discuss with an engineer for options. TS 5/16/2023 - PREVIOUS INSPECTION NOTES 5/12/2023 - PREVIOUS INSPECTION NOTES 5/4/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all. 05-04-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-12-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-16-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU.
ALL ROUGH 05/18/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 05/18/2023- Met with super and reigional rep along with talking to framer to find resolution. Opportunuty to look at a spray that acts as a presevative to spray between the raw non treated wood and concrete block bond beam. Suggested they discuss with an engineer for options. TS 5/16/2023 - PREVIOUS INSPECTION NOTES 5/12/2023 - PREVIOUS INSPECTION NOTES 5/4/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all. 05-04-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-12-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-16-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU.
LATH/BRICK/ WATER BARRIER 05/17/2023 APPROVED AGAETANO
Note: 5/8/2023 - PREVIOUS INSPECTION NOTES 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. No window or door stops installed. 2. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 3. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 4. Job site is a mess. Please remove trash prior to next inspection. 05-08-2023 Cancelled by applicant.
ALL ROUGH 05/16/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 5/12/2023 - PREVIOUS INSPECTION NOTES 5/4/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all. 05-04-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-12-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-16-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU.
ALL ROUGH 05/12/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 5/4/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all. 05-04-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-12-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU.
LATH/BRICK/ WATER BARRIER 05/08/2023 CANCELLED BY APPLICANT AGAETANO
Note: 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. No window or door stops installed. 2. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 3. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 4. Job site is a mess. Please remove trash prior to next inspection. 05-08-2023 Cancelled by applicant.
ALL ROUGH 05/04/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 5/3/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all. 05-04-2023 Above issue has not been resolved. Check all. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU.
ALL ROUGH 05/03/2023 CANCELLED BY APPLICANT AGAETANO
Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all.
ALL ROUGH 05/01/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 4/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 05-01-2023 Above issue has not been resolved. Check all.
ELECTRIC TEMP POLE 04/28/2023 CANCELLED BY APPLICANT AGAETANO
ALL ROUGH 04/17/2023 Disapproved -FEE REQUIRED AGAETANO
Note: Inspector Notes from Inspection 2467 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection. 04-17-2023 Above issue has not been addressed. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU.
TUB SET 04/10/2023 CANCELLED BY INSPECTOR MGIBSON
Note: NEED TO SCHEDULE ALL ROUGH INSPECTION WHEN READY
HVAC ROUGH 04/10/2023 CANCELLED BY INSPECTOR RMARTIN
Note: NEED TO SCHEDULE THE ALL ROUGH INSPECTION, WHICH INCLUDES ELECTRICAL, PLUMBING, AND A/C
ELECTRIC 1ST ROUGH UNDERGROUND 04/10/2023 CANCELLED BY INSPECTOR RMARTIN
Note: NEED TO SCHEDULE ALL ROUGH INSPECTION, WHICH INCLUDES ELECTRICAL, PLUMBING AND A/C
ROOF VALLEY & METAL 04/10/2023 APPROVED - AS NOTED JSTEWART
Note: 3/16/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection.
ROOF VALLEY & METAL 03/16/2023 Disapproved -FEE REQUIRED AGAETANO
Note: Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 3. Job site is a mess. Please remove trash prior to next inspection.
LATH/BRICK/ WATER BARRIER 03/16/2023 Disapproved -FEE REQUIRED AGAETANO
Note: Inspector Notes from Inspection 2460 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk. 03-16-2023 1. No window or door stops installed. 2. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 3. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. 4. Job site is a mess. Please remove trash prior to next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/14/2023 APPROVED - AS NOTED AGAETANO
Note: 2/13/2023 - PREVIOUS INSPECTION NOTES 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 02-14-2023 1. D4 FB12, SG02 and SH01 indicates moisture barrier to be installed. Highlighted on drawings. All sides of floor trusses to CMU. 2. Entry header beam wall sheathing needs to be exposed for inspection. Inspector cannot verify the nailng pattern. The outside triple header nails are not completely fastened. Contractor needs to provide details where wall is not required to have hardware. Check at next inspection. Contractor can proceed at own risk.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/13/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 2/10/2023 - PREVIOUS INSPECTION NOTES 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans. 02-13-2023 1. D4 SG02 and SH01 indicates moisture barrier to be installed. All sides of floor trusses to CMU. 2. Covered entry header not exposed for inspection. Outside of triple header not nailed at the three sides.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/10/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 02-10-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened. 3. WFO9 d3 not installed as per plans.
WALL SHEATHING 01/23/2023 APPROVED - AS NOTED AGAETANO
Note: 01-23-2023 Left side of garage, second floor, second sheet is missing nails.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/23/2023 Disapproved - NO FEE AGAETANO
Note: 01-23-2023 1. Sheet 2.1 Wall Types Legend indicates 2 x interior bearig wall. D1 FM10 interior bearing wall. First floor interior bearing walls not as per plans. Please provide details or install as per plans. 2. Interior garage wall brackets not fastened.
FOUND SURVEY APPROVED (OFFICE) 12/29/2022 APPROVED TBAKER
TIE BEAM / LINTEL 12/28/2022 APPROVED AGAETANO
MONOLITHIC SLAB 12/21/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 12/19/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 12/19/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/25/2022 APPROVED CSTONE
WILDLIFE CHECK - ENVIRONMENTAL 07/21/2022 APPROVED JMYERS

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/16/2023 06/16/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO NOC.PDF
BADMIN INFORMATION 06/16/2023 06/16/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC MISSING NOTARY AT BOTTOM
MECH COMPLETE 02/15/2023 02/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 02/14/2023 02/14/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your files correctly
ENGIN1 COMPLETE 12/28/2022 12/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/28/2022 12/28/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 10/03/2022 10/03/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/03/2022 10/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/03/2022 10/07/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/22/2022 09/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/22/2022 09/22/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM You are submitting an approved siteplan from back in August 08, 2022. If anything has changed that you need to write that down on the revision sheet and also submit a site plan showing any changes
SW1 COMPLETE 09/22/2022 09/30/2022
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
PLENV CANCEL 09/07/2022 09/08/2022
ENGIN1 HOLD 09/07/2022 09/07/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Wrong site plan submitted with revisions
SW1 COMPLETE 09/07/2022 09/13/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON HOLD 09/07/2022 09/08/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM You submitted a site plan for 4 Senator Court to this permit. If you need to submit a new site plan for this address, please put information on the correction/revision sheet as to what has changed since the site plan was approved in August.
MECH COMPLETE 08/08/2022 08/09/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/08/2022 08/15/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/08/2022 08/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/08/2022 08/08/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
PLENV COMPLETE 07/20/2022 07/21/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 7/21/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot.
SWALE COMPLETE 07/18/2022 10/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH HOLD 07/15/2022 07/15/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM This is correct review. Previous hold comment is incorrect. Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
BLD COMPLETE 07/14/2022 07/18/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/14/2022 07/15/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/14/2022 07/18/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/14/2022 07/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/14/2022 07/18/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 07/14/2022 07/15/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated.
SW1 HOLD 07/14/2022 07/20/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM LOT IS DRAINING TO THE LOT TO THE RIGHT NEED TO KEEP ALL STORMWATER ON YOUR LOT
ZON COMPLETE 07/14/2022 07/20/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/13/2023
SW ENG REINSPECTION 20 ¤20.00 12/13/2023
SW ENG REINSPECTION 20 ¤20.00 12/13/2023
SW ENG REINSPECTION 30 ¤30.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
WATER- TURN ON ¤25.00 10/11/2022
ADJUSTMENT 50% (¤440.37) 10/11/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/11/2022
INSPECTION - RESIDENTIAL ¤662.75 10/11/2022
PLAN REVIEW - RESIDENTIAL ¤187.98 10/11/2022
SW ENG - REVIEW 20 ¤20.00 10/11/2022
SW ENG RES REVIEW 200 ¤200.00 10/11/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/11/2022
SEWER CREDIT (¤1.59) 10/11/2022
SEWER INSPECTION ¤25.00 10/11/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/11/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/11/2022
SITE PLAN 30 ¤30.00 10/11/2022
CONNECTION FEES ¤1,077.88 10/11/2022
CONTRACTOR CHANGE ¤20.00 10/11/2022
CONTRACTOR CHANGE ¤20.00 10/11/2022
CONTRACTOR CHANGE ¤20.00 10/11/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/11/2022
IMPACT FEE FIRE ¤388.65 10/11/2022
IMPACT FEE PARKS ¤1,455.13 10/11/2022
IMPACT FEE SCHOOL ¤3,600.00 10/11/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/11/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/11/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/11/2022
SURCHARGE FS 533.721 ¤2.90 10/11/2022
SURCHARGE - FS 468.631 ¤4.35 10/11/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/11/2022
SW ENG INSPECTION 80 ¤80.00 10/11/2022
SW ENG PRE APRON ¤30.00 10/11/2022
Fees Total Due: ¤0.00 Total Paid: ¤18,207.21