I want to search for...

Permit #2022070647

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00030-0380
CONDITIONED SPACE: 1906 sqft
GARAGE: 400 sqft
OPENED PORCH (WITH ROOF) : 20 sqft
Total Square Footage: 2326 sqft
Block: 00030
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 407-432-2344
Location Address: 2 PHILMONT LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/15/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL

NAPLES, FL 34103

Lot: 0380
Contracted Stated Job Value: ¤240,639.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 07/31/2023 FINAL APPROVED DHANEY
U-CROSS CONNECTION 07/28/2023 APPROVED - AS NOTED JHARDING
Note: N irrigation, no cross connections.
BLD - BUILDING FINAL 07/24/2023 FINAL APPROVED KSANDOE
ROW - FINAL APRON (AFTER POUR) 07/21/2023 APPROVED RGROSS
Note: Inspector Notes from Inspection 9465 Some adjustments were made along the fence line and between the adjoining pep tanks near the right rear swale. Sod was lowered at the fence line. Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. On site with rear neighbor who pointed out that the 1 1/2 pvc pipe between pep tanks is just under sod but not buried. Apparently this was to accomidate the digging of a small drainage conveyance to and between the pep tanks. 7/20/2023 - PREVIOUS INSPECTION NOTES 7/19/2023 - PREVIOUS INSPECTION NOTES See note on Final Survey. There are some corrections needed along the rear fence line. On site with CM who understood the corrections needed. Corrections needed are: 1)move dirt and sod along the fence line so that the finished sod elevation is below the bottom of the fence. Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 2) From the end of the fence line near the swale the grade needs lowered to allow water to continue to drain to the swale and prevent ponding between the fence line and the pep tank. Sec 300.04 b7 The Lot Grading Plan must identify how any low spots on the property (including property lines) are drained.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/21/2023 APPROVED - AS NOTED RGROSS
Note: Some adjustments were made along the fence line and between the adjoining pep tanks near the right rear swale. Sod was lowered at the fence line. Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. On site with rear neighbor who pointed out that the 1 1/2 pvc pipe between pep tanks is just under sod but not buried. Apparently this was to accomidate the digging of a small drainage conveyance to and between the pep tanks. 7/20/2023 - PREVIOUS INSPECTION NOTES 7/19/2023 - PREVIOUS INSPECTION NOTES See note on Final Survey. There are some corrections needed along the rear fence line. On site with CM who understood the corrections needed. Corrections needed are: 1)move dirt and sod along the fence line so that the finished sod elevation is below the bottom of the fence. Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 2) From the end of the fence line near the swale the grade needs lowered to allow water to continue to drain to the swale and prevent ponding between the fence line and the pep tank. Sec 300.04 b7 The Lot Grading Plan must identify how any low spots on the property (including property lines) are drained.
ROW - STORMWATER FINAL 07/21/2023 APPROVED - AS NOTED RGROSS
Note: See notes on Field Survey.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/20/2023 CANCELLED BY APPLICANT RGROSS
Note: 7/19/2023 - PREVIOUS INSPECTION NOTES See note on Final Survey. There are some corrections needed along the rear fence line. On site with CM who understood the corrections needed. Corrections needed are: 1) Remove dirt and sod along the fence line so that the finished sod elevation is below the bottom of the fence. Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 2) From the end of the fence line near the swale the grade needs lowered to allow water to continue to drain to the swale and prevent ponding between the fence line and the pep tank. Sec 300.04 b7 The Lot Grading Plan must identify how any low spots on the property (including property lines) are drained.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/19/2023 APPROVED - AS NOTED RGROSS
Note: Final Survey does reflect the actual conditions on site. Builder could not grade to site plan along the back easement along the fence because the proposed elevations would cause water to flow backwards from the swale. There are a few corrections that will be addressed on Field Survey and Final Stormwater to allow for maximum storm water flow along the fence line in the rear.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/19/2023 Disapproved - NO FEE RGROSS
Note: See note on Final Survey. There are some corrections needed along the rear fence line. On site with CM who understood the corrections needed. Corrections needed are: 1) Remove dirt and sod along the fence line so that the finished sod elevation is below the bottom of the fence. Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 2) From the end of the fence line near the swale the grade needs lowered to allow water to continue to drain to the swale and prevent ponding between the fence line and the pep tank. Sec 300.04 b7 The Lot Grading Plan must identify how any low spots on the property (including property lines) are drained.
GRAVITY SEWER TEST 06/26/2023 APPROVED MGIBSON
Note: 12/21/2022 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET TO ABOUT WHERE PEP TANK IS TO BE PLACED
U - SEWER TIE IN 06/23/2023 APPROVED - AS NOTED MGIBSON
Note: C/M TO SCHEDULE GRAVITY SEWER FOR 6/26/23
ELECTRIC - EARLY POWER 06/13/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1148. Release Power 6/12/2023 - PREVIOUS INSPECTION NOTES 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23: 1). Ground wire must be fully protected in pipe from the ground into the meter panel per NEC 250-92. 2). For Early Power Inspection with overhead power source (weather head) - the service feeds must be installed (landed) at the Meter Panel. 3). Feed for water heater is not safed off properly.
ELECTRIC - EARLY POWER 06/12/2023 CANCELLED BY APPLICANT KSANDOE
Note: 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23: 1). Ground wire must be fully protected in pipe from the ground into the meter panel per NEC 250-92. 2). For Early Power Inspection with overhead power source (weather head) - the service feeds must be installed (landed) at the Meter Panel. 3). Feed for water heater is not safed off properly.
ELECTRIC - EARLY POWER 06/06/2023 Disapproved -FEE REQUIRED RSIMS
Note: 6/6/23: 1). Ground wire must be fully protected in pipe from the ground into the meter panel per NEC 250-92. 2). For Early Power Inspection with overhead power source (weather head) - the service feeds must be installed (landed) at the Meter Panel. 3). Feed for water heater is not safed off properly.
ROW- PRE-APRON (PRE-POUR) 05/22/2023 APPROVED FSLADISH
Note: 05/22/23 PIPE IS GOOD. LOOKED GOOD AT TIME OF INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ELECTRIC TEMP POLE 04/28/2023 CANCELLED BY APPLICANT KSANDOE
PEP TANK INSTALLATION REQUEST 04/14/2023 APPROVED TSCHWEERS
INSULATION 03/22/2023 APPROVED KSANDOE
LATH/BRICK/ WATER BARRIER 03/10/2023 APPROVED KSANDOE
ALL ROUGH 02/21/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/30/2023 APPROVED KSANDOE
Note: 1/27/2023 - PREVIOUS INSPECTION NOTES Missing nailing on abu anchors at front columns Need truss packet on site for inspection.
ROOF VALLEY & METAL 01/30/2023 APPROVED - AS NOTED KSANDOE
Note: Submit revised roofing worksheet to include multiple underlayments
WALL SHEATHING 01/27/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/27/2023 Disapproved - NO FEE KSANDOE
Note: Missing nailing on abu anchors at front columns Need truss packet on site for inspection.
TIE BEAM / LINTEL 01/17/2023 APPROVED KSANDOE
MONOLITHIC SLAB 01/03/2023 APPROVED RMARTIN
FOUND SURVEY APPROVED (OFFICE) 12/29/2022 APPROVED TBAKER
PLUMBING 1ST ROUGH UNDERGROUND 12/21/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 12/21/2022 Disapproved - NO FEE MGIBSON
Note: SEWER NOT RAN YET TO ABOUT WHERE PEP TANK IS TO BE PLACED
WATER METER INSTALLATION REQUEST 11/04/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/16/2023 06/16/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC MISSING BOTTOM NOTARY
MECH COMPLETE 02/15/2023 02/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 02/14/2023 02/14/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your files correctly
ZON COMPLETE 12/28/2022 12/28/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/28/2022 12/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 12/21/2022 12/21/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab dimensions on foundation survey differ from those on site plan by 20'+/- Please revise appropriate drawing and resubmit.
ZON HOLD 12/21/2022 12/21/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation survey not for this address
ZON COMPLETE 08/04/2022 08/04/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 07/28/2022 07/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 07/28/2022 07/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front & left elevation page missing
SWALE COMPLETE 07/18/2022 10/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/14/2022 07/18/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/14/2022 07/15/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 07/14/2022 07/18/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to submit first floor electric plan
ENGIN1 COMPLETE 07/14/2022 07/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/14/2022 07/19/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/14/2022 07/18/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/14/2022 07/20/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 07/14/2022 07/20/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Cannot have a windowless wall facing a right of way (right side faces a street) Front & left elevation page missing

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 07/24/2023
CONTRACTOR CHANGE ¤20.00 12/22/2022
CONTRACTOR CHANGE ¤20.00 12/22/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 08/15/2022
IMPACT FEE FIRE ¤388.65 08/15/2022
IMPACT FEE PARKS ¤1,455.13 08/15/2022
IMPACT FEE SCHOOL ¤3,600.00 08/15/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 08/15/2022
WATER -IRRIGATION INSPECTION ¤25.00 08/15/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 08/15/2022
SURCHARGE FS 533.721 ¤2.90 08/15/2022
SURCHARGE - FS 468.631 ¤4.35 08/15/2022
SW ENG - FOUNDATION SURVEY ¤20.00 08/15/2022
SW ENG INSPECTION 80 ¤80.00 08/15/2022
SW ENG PRE APRON ¤30.00 08/15/2022
SW ENG - REVIEW 20 ¤20.00 08/15/2022
SW ENG RES REVIEW 200 ¤200.00 08/15/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 08/15/2022
SEWER CREDIT (¤650.00) 08/15/2022
SEWER INSPECTION ¤25.00 08/15/2022
SEWER CAPITAL FACILITY ¤4,939.76 08/15/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 08/15/2022
SITE PLAN 30 ¤30.00 08/15/2022
CONNECTION FEES ¤1,077.88 08/15/2022
WATER- TURN ON ¤25.00 08/15/2022
ADJUSTMENT 50% (¤440.37) 08/15/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/15/2022
INSPECTION - RESIDENTIAL ¤662.75 08/15/2022
PLAN REVIEW - RESIDENTIAL ¤187.98 08/15/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,076.30