Permit #2022070687
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00580-0290 |
| GARAGE: 400 sqft |
| CONDITIONED SPACE: 1906 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00580 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 407-432-2344 |
| Location Address: 17 RIVERSIDE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/01/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORP |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤239,639.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/25/2023 | FINAL APPROVED | JWALKER |
| Note: 8/24/2023 - PREVIOUS INSPECTION NOTES Line set in the garage needs to have a protective cover installed over it. The anti tilt device for the oven not working. | |||
| ROW - STORMWATER FINAL | 08/24/2023 | FINAL APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------- 8/22/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL DIRT OUT OF THE CULVERT ----------------------------------------------------------------------------- NOTE TO INSPECTOR 1) THE RIGHT SIDE OF DRIVEWAY THERE ARE HIGH AND LOW SPOTS IN THE ROAD SIDE SWALE NEED TO FIX SO WATER WILL FLOW. 2) NEED TO FIX THE RIGHT SIDE DRAINAGE ALONG THE PROPERTY LINE NEED TO TAKE THE HUMP OUT AREAS PAINTED | |||
| U -UTILITY RESIDENTIAL FINAL | 08/24/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 8/22/2023 - PREVIOUS INSPECTION NOTES need to ID pep breaker-needs to be stand alone20amp-no test-arc/gfi | |||
| BLD - BUILDING FINAL | 08/24/2023 | Disapproved - NO FEE | JWALKER |
| Note: Line set in the garage needs to have a protective cover installed over it. The anti tilt device for the oven not working. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/22/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: need to ID pep breaker-needs to be stand alone20amp-no test-arc/gfi | |||
| ROW - STORMWATER FINAL | 08/22/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO CLEAN ALL DIRT OUT OF THE CULVERT ----------------------------------------------------------------------------- NOTE TO INSPECTOR 1) THE RIGHT SIDE OF DRIVEWAY THERE ARE HIGH AND LOW SPOTS IN THE ROAD SIDE SWALE NEED TO FIX SO WATER WILL FLOW. 2) NEED TO FIX THE RIGHT SIDE DRAINAGE ALONG THE PROPERTY LINE NEED TO TAKE THE HUMP OUT AREAS PAINTED | |||
| U-CROSS CONNECTION | 08/22/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigatin-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 08/22/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/21/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/21/2023 | APPROVED | PFLANAGAN |
| Note: 1) THE RIGHT SIDE OF DRIVEWAY THERE ARE HIGH AND LOW SPOTS IN THE ROAD SIDE SWALE NEED TO FIX SO WATER WILL FLOW. 2) NEED TO FIX THE RIGHT SIDE DRAINAGE ALONG THE PROPERTY LINE NEED TO TAKE THE HUMP OUT AREAS PAINTED | |||
| ELECTRIC - EARLY POWER | 06/13/2023 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 06/08/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/08/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/01/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 06/01/23 CORRECTIONS MADE. PIPE IS GOOD. EVERYTHING LOOKED GOOD AT TIME OF INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________________________ 5/30/2023 - PREVIOUS INSPECTION NOTES 05/30/23 BOTH DRIVEWAY APRON WINGS DO NO MEET THE REQUIRED MINIMUM OF 36". PLEASE RESET APRON WINGS TO MINIMUM OF 36" PLEASE SEE PHOTOS FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/30/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 05/30/23 BOTH DRIVEWAY APRON WINGS DO NO MEET THE REQUIRED MINIMUM OF 36". PLEASE RESET APRON WINGS TO MINIMUM OF 36" PLEASE SEE PHOTOS FOR REFERENCE. | |||
| PEP TANK INSTALLATION REQUEST | 04/26/2023 | APPROVED | CSTONE |
| Note: 4/18/2023 2:44:57 PM- PREVIOUS INSPECTION NOTES 4/18/2023 Drywall materials must be on site. | |||
| PEP TANK INSTALLATION REQUEST | 04/18/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 4/18/2023 Drywall materials must be on site. | |||
| INSULATION | 04/18/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 3/20/23 Item 2 and 3 will need to be corrected at Insultion to avoid further fees. 3/17/2023 - PREVIOUS INSPECTION NOTES 1. 3" drain above kitchen needs to slope downward a minimum of 1/8" per foot. 2. Install nail plates at the bottom area of the first floor rear window and front window bottom of the furring strips where the 14-2 wire runs through. 3. Please have the approved duct layout drawing onsite. NOTE : Second floor window not installed to allow sheet rock to be installed on the first floor. | |||
| ALL ROUGH | 03/20/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 3/20/23 Item 2 and 3 will need to be corrected at Insultion to avoid further fees. 3/17/2023 - PREVIOUS INSPECTION NOTES 1. 3" drain above kitchen needs to slope downward a minimum of 1/8" per foot. 2. Install nail plates at the bottom area of the first floor rear window and front window bottom of the furring strips where the 14-2 wire runs through. 3. Please have the approved duct layout drawing onsite. NOTE : Second floor window not installed to allow sheet rock to be installed on the first floor. | |||
| ALL ROUGH | 03/17/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. 3" drain above kitchen needs to slope downward a minimum of 1/8" per foot. 2. Install nail plates at the bottom area of the first floor rear window and front window bottom of the furring strips where the 14-2 wire runs through. 3. Please have the approved duct layout drawing onsite. NOTE : Second floor window not installed to allow sheet rock to be installed on the first floor. | |||
| LATH/BRICK/ WATER BARRIER | 03/16/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/16/2023 | APPROVED | JWALKER |
| Note: 2/13/2023 - PREVIOUS INSPECTION NOTES 1. Missing C-2 details at second floor exterior walls. Calls for DTTZ at four locations. 2. Missing 1. MSTA36, and 1 LSTA 18 at each outside corner. 3. Install moisture barries under floor trusses F11, F8 and F3. 4. Install angle bracing for the parrel running floor trusses Detail FB12. 5. Detail SHO1 at the window framing calls for (2) MSTCM40 if the HTT and LTT are not used. 6. Install SP4 at each 2 floor window header 2' o.c. 7. Each window jamb requires a minimum of 3 2x studs at each end. | |||
| ROOF VALLEY & METAL | 02/14/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/13/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Missing C-2 details at second floor exterior walls. Calls for DTTZ at four locations. 2. Missing 1. MSTA36, and 1 LSTA 18 at each outside corner. 3. Install moisture barries under floor trusses F11, F8 and F3. 4. Install angle bracing for the parrel running floor trusses Detail FB12. 5. Detail SHO1 at the window framing calls for (2) MSTCM40 if the HTT and LTT are not used. 6. Install SP4 at each 2 floor window header 2' o.c. 7. Each window jamb requires a minimum of 3 2x studs at each end. | |||
| ROOF SHEATHING | 02/08/2023 | APPROVED | JWALKER |
| WALL SHEATHING | 02/08/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 01/25/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/23/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 01/09/2023 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/03/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/07/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/23/2023 | 06/23/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC is missing recording stamp on top of document | |||
| BADMIN | INFORMATION | 06/22/2023 | 06/22/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - - TBELGROVE@PALMCOASTGOV.COM TOP OF NOTICE CUT OFF UNABLE TO READ RECORDED DATE | |||
| BADMIN | INFORMATION | 06/16/2023 | 06/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC MISSING NOTARY AT BOTTOM | |||
| BLD | COMPLETE | 02/21/2023 | 02/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| ENGIN1 | COMPLETE | 01/31/2023 | 01/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/31/2023 | 01/31/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/25/2023 | 01/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/25/2023 | 01/25/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/18/2022 | 10/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/15/2022 | 07/19/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/15/2022 | 07/19/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/15/2022 | 07/20/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/15/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/25/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/07/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/04/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/04/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/01/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/01/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/01/2022 |
| SURCHARGE FS 533.721 | ¤7.38 | 08/01/2022 |
| SURCHARGE - FS 468.631 | ¤11.08 | 08/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/01/2022 |
| WATER- TURN ON | ¤25.00 | 08/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/01/2022 |
| INSPECTION - RESIDENTIAL | ¤660.00 | 08/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤187.20 | 08/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/01/2022 |
| SEWER CREDIT | (¤1,342.00) | 08/01/2022 |
| SEWER INSPECTION | ¤25.00 | 08/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/01/2022 |
| SITE PLAN 30 | ¤30.00 | 08/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,967.35 |