Permit #2022070692

Permit Details

Status: FINAL

Parcel Id: 09-11-30-0000-01020-0021
Block: 01020
Subdivision: -
Job Phone: 305-799-4886
Location Address: 24 HARGROVE GRADE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 09/15/2022
NOC: Unknown
Applicant name: JOHN EDWARD JAMES
Owner: REAL ESTATE DEVELOPMENT OF FLORIDA LLC

Address

32 HARGROVE GRADE

PALM COAST, FL 32164

Lot: 0021
Job Description: SITE WORK; PHASE 1 OFFICE WAREHOUSE
Type: CN

Contractor

JAMES COMMERCIAL DEVELOPMENT INC
Status Location Address State License Number Phone
ACTIVE

9950 KIRCHHERR

WEST PALM BEACH, FL 33411

CGC1514256 (Exp: 08/31/2026) 305-799-4886

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 05/19/2025 APPROVED DRAMIREZ
LDSC- LANDSCAPE FINAL 05/16/2025 APPROVED - AS NOTED LFITZGERALD
Note: 5/12/2025 5:00:13 PM- PREVIOUS INSPECTION NOTES 5/12/2025 4:56:51 PM- PREVIOUS INSPECTION NOTES Magnolias omitted per city/shrubs-vibernum now screening both backflow units REPEAT COMMENTS NOT ADDRESSED Irrigation system must be modified to inclued: 1. 4 magnolia trees 2. screen plantings for lsrge blue pipe /backflow preventer. 3. Revise irrigation plan after thos plants have been installed
U - UTILITY COMMERCIAL FINAL 05/16/2025 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 05/16/2025 APPROVED LFITZGERALD
LDSC-IRRIGATION FINAL 05/12/2025 CANCELLED BY INSPECTOR RPICATAGI
Note: 5/9/2025 2:46:25 PM- PREVIOUS INSPECTION NOTES IRRIGATION SYSTEM IS INCOMPLETE BECUSE LANDSCAPE IS INCOMPLETE. 1. PER EMAIL 4/8/25 - (4) FOUR MAGNOLIAS, 3.5" CAL. ARE REQUIRED ALONG SIDEWAL NEAR WET POND AT ENTRANCE ROAD CONRTACTOR MUST PROVIDE THESE TREEW, THEN MODIFY IRRIATION TO WATER THESE TREES WITH BUBBLERS (2 PER TREE) 2. LARGE BLUE PIPE/BACKFLOW PREVENTER, MUST BE SCREENED WITH 30" HT SHRUBS PER ldc 11.03.01-H. IRRIGATION SYSTEM MUST BE MODIFIED TO ADDRESS THESE PLANTINGS
LDSC- LANDSCAPE FINAL 05/12/2025 Disapproved -FEE REQUIRED RPICATAGI
Note: Irrigation system must be modified to inclued: 1. 4 magnolia trees 2. screen plantings for lsrge blue pipe /backflow preventer. 3. Revise irrigation plan after thos plants have been installed
LDSC- LANDSCAPE FINAL 05/09/2025 Disapproved -FEE REQUIRED RPICATAGI
Note: 5/12/2025 4:56:51 PM- PREVIOUS INSPECTION NOTES REPEAT COMMENTS NOT ADDRESSED Irrigation system must be modified to inclued: 1. 4 magnolia trees 2. screen plantings for lsrge blue pipe /backflow preventer. 3. Revise irrigation plan after thos plants have been installed
LDSC-IRRIGATION FINAL 05/09/2025 APPROVED RPICATAGI
Note: IRRIGATION SYSTEM IS INCOMPLETE BECUSE LANDSCAPE IS INCOMPLETE. 1. PER EMAIL 4/8/25 - (4) FOUR MAGNOLIAS, 3.5" CAL. ARE REQUIRED ALONG SIDEWAL NEAR WET POND AT ENTRANCE ROAD CONRTACTOR MUST PROVIDE THESE TREEW, THEN MODIFY IRRIATION TO WATER THESE TREES WITH BUBBLERS (2 PER TREE) 2. LARGE BLUE PIPE/BACKFLOW PREVENTER, MUST BE SCREENED WITH 30" HT SHRUBS PER ldc 11.03.01-H. IRRIGATION SYSTEM MUST BE MODIFIED TO ADDRESS THESE PLANTINGS
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 05/09/2025 APPROVED DRAMIREZ
UC-FINAL SITE INSPECTION 05/09/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9114 waiti ng on valve brass ID tabs-told they were ordered all pipe now cleaned out 3/26/2024 - PREVIOUS INSPECTION NOTES all storm pipe now installed-ned to vac out several strctures/pipes associated with-exessive soil build up
UC-DRAINAGE PIPE PLACEMENT/LAMPING 05/08/2025 APPROVED - AS NOTED LFITZGERALD
Note: all pipe now cleaned out 3/26/2024 - PREVIOUS INSPECTION NOTES all storm pipe now installed-ned to vac out several strctures/pipes associated with-exessive soil build up
CLOSE OUT DOCUMENTS 05/07/2025 APPROVED DRAMIREZ
LDSC-PRE-PLANTING TREE QUALITY 01/14/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/14/2025 10:08:29 AM *** inspection never scheduled at time when required andrichard never took care of
LDSC-IRRIGATION FINAL 01/14/2025 Disapproved - NO FEE LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/14/2025 3:52:51 PM *** as builts not recieved by the city
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 01/14/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/14/2025 10:07:17 AM *** recieved
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 12/03/2024 APPROVED LFITZGERALD
Note: 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/3/2024 12:49:33 PM *** wire tone completed (Tony with Gemstone) Inspector Notes from Inspection 9111 Inspector Notes from Inspection 9020 M&S now paving parking lot-bldg.1/2 Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS) 4/10/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9113 Unable to hold pressure(Tomoka Cstr-on site performing testing)-2inch poly pond concete spread weir now installed 10/25/2023 - PREVIOUS INSPECTION NOTES westnside-MES TO STR 1 TO STR 2 HEADING NORTH-57 STONE PLACED UNDERNEATH STRUCTURES 2/23/2024 - PREVIOUS INSPECTION NOTES 2 wet taps now done-8infire(16x8 sleeve with gate valve and 2in saddle with gate valve for potable) and potable now tied in to the 2in BF/METER assembly NOTE -no meters at building to be released until certification by FDEP for water permit 1/6/2024 - PREVIOUS INSPECTION NOTES 3in water main now revised to 2in poly-John to provide documentation(Letter from ARCH.) approving this change-2in installed from Master Backflow Assembly at ROW to Bldg 1 tie in area and to Bldg 2 te in area
UROW - FINAL DRAINAGE 12/03/2024 APPROVED LFITZGERALD
UROW-RETENT/DETENT STABILI 11/22/2024 FINAL APPROVED LFITZGERALD
Note: 3/26/2024 - PREVIOUS INSPECTION NOTES all pond slopes sodded except where outfall pipe is installed
UROW -FINAL GRADE PRIOR SOD 11/22/2024 FINAL APPROVED LFITZGERALD
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 11/22/2024 APPROVED LFITZGERALD
Note: 9/20/2023 1:43:32 PM- PREVIOUS INSPECTION NOTES
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/22/2024 APPROVED LFITZGERALD
Note: 9/22/2023 - PREVIOUS INSPECTION NOTES North/South sidewalks poured 9/21/2023 - PREVIOUS INSPECTION NOTES NORTH/SOUTH THICKEN sidewalk per revised detail ready for concrete placement-2-5bars in thickened footing to be wet set/inspected during pour tomorrow
U-SEWER FORCE MAIN INSTALL/TESTING 11/22/2024 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9602 *** NOTES ADDED BY LFITZGERALD 5/6/2024 4:25:05 PM *** ADA mats(Truncated Domes) not yet installed at acsh entrance cross walk/landing-told they are ordered and will be installed ASAP- i will note this if not done before substantial walk, on the punch list, for site close-out 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/3/2024 12:50:12 PM *** wire tone completed(Tony Gemstone) Inspector Notes from Inspection 9111 Inspector Notes from Inspection 9020 M&S now paving parking lot-bldg.1/2 Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS) 3/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9050 FM sweep now installed so effluent flows directly-without splashing- into 10inch gravity main Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom Inspector Notes from Inspection 9050 Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 3/18/2024 - PREVIOUS INSPECTION NOTES jim w/CTL drilled into existing mahhole with 2in green poly(never told anyone), pictures were taken looks ok BUT still need to fit a 45 fittting on end so it lays on the concrete bench which will prevent splasing of effluent, then manhole required to be coated with spectra-shield 3/14/2024 - PREVIOUS INSPECTION NOTES still cant make site visit-tied up on another project 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 not able to make site -resch.tomorrow Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 1/6/2024 - PREVIOUS INSPECTION NOTES 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
U-WATER METER INSTALLATION/VERIFICATION 05/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/13/2024 9:49:47 AM *** utility rep noah verified all meters working and to correct units 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/3/2024 9:29:18 AM *** meters missing front curb stop valve and rear union that allows for meter maintanence and/or removal
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 05/09/2024 FINAL APPROVED FWILLIS
BLD- ADA PARKING 05/09/2024 FINAL APPROVED FWILLIS
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES 5/6/24 - INSTALLING TRUNCATED DOMES THIS AFTERNOON. Inspector Notes from Inspection 1510 direct buried poles
BLD- ADA SIGNAGECONTROL 05/06/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 1510 direct buried poles
BLD- ADA PARKING 05/06/2024 CANCELLED BY APPLICANT FWILLIS
Note: 5/6/24 - INSTALLING TRUNCATED DOMES THIS AFTERNOON. Inspector Notes from Inspection 1510 direct buried poles
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 05/06/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/6/2024 4:25:05 PM *** ADA mats(Truncated Domes) not yet installed at acsh entrance cross walk/landing-told they are ordered and will be installed ASAP- i will note this if not done before substantial walk, on the punch list, for site close-out
U-WATER METER INSTALLATION/VERIFICATION 05/03/2024 Disapproved - NO FEE LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/3/2024 9:29:18 AM *** meters missing front curb stop valve and rear union that allows for meter maintanence and/or removal
U-SEWER FORCE MAIN INSTALL/TESTING 05/03/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/3/2024 12:50:12 PM *** wire tone completed(Tony Gemstone) Inspector Notes from Inspection 9111 Inspector Notes from Inspection 9020 M&S now paving parking lot-bldg.1/2 Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS) 3/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9050 FM sweep now installed so effluent flows directly-without splashing- into 10inch gravity main Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom Inspector Notes from Inspection 9050 Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 3/18/2024 - PREVIOUS INSPECTION NOTES jim w/CTL drilled into existing mahhole with 2in green poly(never told anyone), pictures were taken looks ok BUT still need to fit a 45 fittting on end so it lays on the concrete bench which will prevent splasing of effluent, then manhole required to be coated with spectra-shield 3/14/2024 - PREVIOUS INSPECTION NOTES still cant make site visit-tied up on another project 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 not able to make site -resch.tomorrow Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 1/6/2024 - PREVIOUS INSPECTION NOTES 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 05/03/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/3/2024 12:49:33 PM *** wire tone completed (Tony with Gemstone) Inspector Notes from Inspection 9111 Inspector Notes from Inspection 9020 M&S now paving parking lot-bldg.1/2 Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS) 4/10/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9113 Unable to hold pressure(Tomoka Cstr-on site performing testing)-2inch poly pond concete spread weir now installed 10/25/2023 - PREVIOUS INSPECTION NOTES westnside-MES TO STR 1 TO STR 2 HEADING NORTH-57 STONE PLACED UNDERNEATH STRUCTURES 2/23/2024 - PREVIOUS INSPECTION NOTES 2 wet taps now done-8infire(16x8 sleeve with gate valve and 2in saddle with gate valve for potable) and potable now tied in to the 2in BF/METER assembly NOTE -no meters at building to be released until certification by FDEP for water permit 1/6/2024 - PREVIOUS INSPECTION NOTES 3in water main now revised to 2in poly-John to provide documentation(Letter from ARCH.) approving this change-2in installed from Master Backflow Assembly at ROW to Bldg 1 tie in area and to Bldg 2 te in area
UC-ASPHALT PRE PLACEMENT 04/30/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9020 M&S now paving parking lot-bldg.1/2 Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS)
U-WATER SERVICE INSTALLATION 04/29/2024 APPROVED - AS NOTED LFITZGERALD
Note: all 9 meters now connected and functional
U-GRAVITY SEWER INSTALL/TESTING 04/29/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS)
UROW- CURBING & GUTTER 04/29/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9020 all curbing now installed Inspector Notes from Inspection 9015 all 9 meters now connected and functional Letter of approval recieved from Arch regarding 4in sewer pipe from building 1 to LS 12/1/2023 - PREVIOUS INSPECTION NOTES 4in. sch 40 now installed from front front bldg connection(bldg 1)-(plans call for 6in -John to provide letter from ARCH to allow/approve this change. ) to Y connection at proposed LS/6in now installed vfrom bldg 2(rear)to Y CONNECTION WITH 4IN AT lIFT StATION(LS) 3/25/2024 - PREVIOUS INSPECTION NOTES now starting Fcurb install in parking lot
FIRE ACCESS ROAD 04/24/2024 APPROVED LMILLER
BLD - UNDERGROUND SITE LIGHTING CONDUITS 04/24/2024 APPROVED RMARTIN
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 04/24/2024 APPROVED - AS NOTED RMARTIN
Note: direct buried poles
BLD - SITE LIGHTING-POLE SET/FIXTURE 04/24/2024 APPROVED RMARTIN
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/10/2024 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9113 Unable to hold pressure(Tomoka Cstr-on site performing testing)-2inch poly pond concete spread weir now installed 10/25/2023 - PREVIOUS INSPECTION NOTES westnside-MES TO STR 1 TO STR 2 HEADING NORTH-57 STONE PLACED UNDERNEATH STRUCTURES 2/23/2024 - PREVIOUS INSPECTION NOTES 2 wet taps now done-8infire(16x8 sleeve with gate valve and 2in saddle with gate valve for potable) and potable now tied in to the 2in BF/METER assembly NOTE -no meters at building to be released until certification by FDEP for water permit 1/6/2024 - PREVIOUS INSPECTION NOTES 3in water main now revised to 2in poly-John to provide documentation(Letter from ARCH.) approving this change-2in installed from Master Backflow Assembly at ROW to Bldg 1 tie in area and to Bldg 2 te in area
UC-DRAINAGE STRUCT PLACMNT 04/08/2024 APPROVED - AS NOTED LFITZGERALD
Note: pond concete spread weir now installed 10/25/2023 - PREVIOUS INSPECTION NOTES westnside-MES TO STR 1 TO STR 2 HEADING NORTH-57 STONE PLACED UNDERNEATH STRUCTURES
U-SEWER FORCE MAIN INSTALL/TESTING 03/28/2024 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9050 FM sweep now installed so effluent flows directly-without splashing- into 10inch gravity main Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom Inspector Notes from Inspection 9050 Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 3/18/2024 - PREVIOUS INSPECTION NOTES jim w/CTL drilled into existing mahhole with 2in green poly(never told anyone), pictures were taken looks ok BUT still need to fit a 45 fittting on end so it lays on the concrete bench which will prevent splasing of effluent, then manhole required to be coated with spectra-shield 3/14/2024 - PREVIOUS INSPECTION NOTES still cant make site visit-tied up on another project 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 not able to make site -resch.tomorrow Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 1/6/2024 - PREVIOUS INSPECTION NOTES 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
BLD - SEWER TIE IN 03/27/2024 APPROVED MGIBSON
Note: this inspection was done with same inspection type on building permit-just needs signing off
UC-DRAINAGE PIPE PLACEMENT/LAMPING 03/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: all storm pipe now installed-ned to vac out several strctures/pipes associated with-exessive soil build up
UC-CONSTRUCTION ENTRANCE 03/26/2024 APPROVED - AS NOTED LFITZGERALD
Note: 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed
U-WATER MAIN DISINFECTION SAMPLING 03/26/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9105 2 day samples all passed 9/20/2023 1:40:12 PM- PREVIOUS INSPECTION NOTES now base installed 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom
UROW-RETENT/DETENT STABILI 03/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: all pond slopes sodded except where outfall pipe is installed
UROW- CURBING & GUTTER 03/25/2024 PARTIALLY APPROVED LFITZGERALD
Note: now starting Fcurb install in parking lot
U-SEWER FORCE MAIN INSTALL/TESTING 03/18/2024 PARTIALLY APPROVED LFITZGERALD
Note: jim w/CTL drilled into existing mahhole with 2in green poly(never told anyone), pictures were taken looks ok BUT still need to fit a 45 fittting on end so it lays on the concrete bench which will prevent splasing of effluent, then manhole required to be coated with spectra-shield 3/14/2024 - PREVIOUS INSPECTION NOTES still cant make site visit-tied up on another project 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 not able to make site -resch.tomorrow Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 1/6/2024 - PREVIOUS INSPECTION NOTES 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
U-SEWER FORCE MAIN INSTALL/TESTING 03/14/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: still cant make site visit-tied up on another project 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 not able to make site -resch.tomorrow Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 1/6/2024 - PREVIOUS INSPECTION NOTES 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
U-SEWER FORCE MAIN INSTALL/TESTING 03/13/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: Inspector Notes from Inspection 9070 not able to make site -resch.tomorrow Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom 1/6/2024 - PREVIOUS INSPECTION NOTES 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
U-WATER MAIN DISINFECTION 03/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom
U-WATER MAIN DISINFECTION SAMPLING 03/13/2024 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9040 DAY 1 and Day 2 samples taken sunday night/monday afternoon by owner-Artie-waiting on results Inspector Notes from Inspection 9070 2in. poly-flush only since pipe comes wrapped and pretty much clean and install is usually a clean job Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom
U-PUMP STATION PRE-INSTALLATION 03/06/2024 APPROVED - AS NOTED LFITZGERALD
Note: LS set on rock and cocrete poured around bottom
U-PUMP STATION START-UP 03/06/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9060 LS start up rep performed all required checks-LS good to go-copy of report to Utility-Rebecca LS set on rock and cocrete poured around bottom
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 02/23/2024 PARTIALLY APPROVED LFITZGERALD
Note: 2 wet taps now done-8infire(16x8 sleeve with gate valve and 2in saddle with gate valve for potable) and potable now tied in to the 2in BF/METER assembly NOTE -no meters at building to be released until certification by FDEP for water permit 1/6/2024 - PREVIOUS INSPECTION NOTES 3in water main now revised to 2in poly-John to provide documentation(Letter from ARCH.) approving this change-2in installed from Master Backflow Assembly at ROW to Bldg 1 tie in area and to Bldg 2 te in area
MONOLITHIC SLAB 02/14/2024 APPROVED FWILLIS
Note: Dumpster Pad
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 01/06/2024 PARTIALLY APPROVED LFITZGERALD
Note: 3in water main now revised to 2in poly-John to provide documentation approving this change-2in installed from Master Backflow Assembly at ROW to Bldg 1 tie in area and to Bldg 2 tie in area
U-SEWER FORCE MAIN INSTALL/TESTING 01/06/2024 PARTIALLY APPROVED LFITZGERALD
Note: 2in poly instaled from LS to MH tie in area in ROW -next is to core MH and install remaining pipe
U-GRAVITY SEWER INSTALL/TESTING 12/01/2023 PARTIALLY APPROVED LFITZGERALD
Note: 4in. sch 40 now installed for front bldg. from bldg.connection to Y connection at proposed LS
UC-DRAINAGE STRUCT PLACMNT 10/25/2023 PARTIALLY APPROVED LFITZGERALD
Note: westnside-MES TO STR 1 TO STR 2 HEADING NORTH-57 STONE PLACED UNDERNEATH STRUCTURES
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 09/22/2023 PARTIALLY APPROVED LFITZGERALD
Note: North/South sidewalks poured 9/21/2023 - PREVIOUS INSPECTION NOTES NORTH/SOUTH THICKEN sidewalk per revised detail ready for concrete placement-2-5bars in thickened footing to be wet set/inspected during pour tomorrow
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 09/21/2023 PARTIALLY APPROVED LFITZGERALD
Note: NORTH/SOUTH THICKEN sidewalk per revised detail ready for concrete placement(also 4-6 inches paver base-3/8 rock installed in sidewalk pad)-2-5bars in thickened footing to be wet set/inspected during pour tomorrow
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 09/21/2023 PARTIALLY APPROVED LFITZGERALD
UC-CONSTRUCTION ENTRANCE 09/21/2023 PARTIALLY APPROVED LFITZGERALD
PRE-CON 09/21/2023 APPROVED LFITZGERALD
PLAN - PRE-CON 386-986-3750 10/10/2022 APPROVED DHANEY

Review History

Department Status Date In Date Out
BLD COMPLETE 07/15/2022 07/18/2022
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 07/15/2022 07/18/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 07/15/2022 07/15/2022
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 07/15/2022 07/15/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 07/15/2022 07/18/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION- SITE INSPECTOR ¤40.00 05/12/2025
REINSPECTION- SITE INSPECTOR ¤40.00 05/12/2025
SITE PLAN 30 ¤30.00 09/15/2022
ADMINISTRATIVE- SITE DEVELOP ¤125.00 09/15/2022
SITE INSPECTION ¤1,080.00 09/15/2022
Fees Total Due: ¤0.00 Total Paid: ¤1,315.00