I want to search for...
Permit #2022070696
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01420-0100 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 600 sqft |
| Total Square Footage: 3729 sqft |
| Block: 01420 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-627-0430 |
| Location Address: 78 EDITH POPE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/28/2022 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GORELIK GENNADIY |
|
Address 29 VULCAN ST STATEN ISLAND, NY 10305 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Build single family residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/13/2023 | FINAL APPROVED | JWALKER |
| Note: 6/9/2023 - PREVIOUS INSPECTION NOTES 6/9/23: 1). One of the kitchen outlets at the far right side of the counter is not GFCI protected. (1st outlet just before the laundry entrance). 2). Master bathroom right side vanity faucet has no hot water. 3). Hole in garage ceiling at seal tight for AHU needs to be sealed properly (with mastic, fire stop or joint compound) 4). Outside of hinged garage door - light fixture is not installed & there is a non weather rated cover over the box. (Install light fixture or replace cover with a weather rated one). 5). Switch is not installed for Garbage Disposal (waiting on an air switch per builder) | |||
| BLD - BUILDING FINAL | 06/09/2023 | Disapproved - NO FEE | RSIMS |
| Note: 6/9/23: 1). One of the kitchen outlets at the far right side of the counter is not GFCI protected. (1st outlet just before the laundry entrance). 2). Master bathroom right side vanity faucet has no hot water. 3). Hole in garage ceiling at seal tight for AHU needs to be sealed properly (with mastic, fire stop or joint compound) 4). Outside of hinged garage door - light fixture is not installed & there is a non weather rated cover over the box. (Install light fixture or replace cover with a weather rated one). 5). Switch is not installed for Garbage Disposal (waiting on an air switch per builder) | |||
| U-CROSS CONNECTION | 06/07/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/07/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 06/01/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/30/2023 | APPROVED | PFLANAGAN |
| Note: 5/25/2023 - PREVIOUS INSPECTION NOTES CAN NOT JUST PUT DIRT ON TO THE STRUCTURE AND THEN PUT SOD DOWN. NOW YOUR FINISH SOD GRADE DON'T GIVE YOU THE MINIMUM BELOW FFE OF THE HOUSE. NEED TO FIX AREA SO WATER WILL DRAIN AWAY FROM HOUSE WITH OUT PUTTING ANY DIRT AGINST THE HOME. -------------------------------------------------------------------------------------- 5/11/2023 - PREVIOUS INSPECTION NOTES 1) THE IS A LOW AREA IN THE ROAD SIDE SWALE ALL AREAS ARE PAINTED 2) THE RIGHT SIDE OF HOUSE LOOKS LIKE YOU NEED TO HAVE MORE FALL OFF THE HOUSE | |||
| ROW - FINAL APRON (AFTER POUR) | 05/30/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/25/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: CAN NOT JUST PUT DIRT ON TO THE STRUCTURE AND THEN PUT SOD DOWN. NOW YOUR FINISH SOD GRADE DON'T GIVE YOU THE MINIMUM BELOW FFE OF THE HOUSE. NEED TO FIX AREA SO WATER WILL DRAIN AWAY FROM HOUSE WITH OUT PUTTING ANY DIRT AGINST THE HOME. -------------------------------------------------------------------------------------- 5/11/2023 - PREVIOUS INSPECTION NOTES 1) THE IS A LOW AREA IN THE ROAD SIDE SWALE ALL AREAS ARE PAINTED 2) THE RIGHT SIDE OF HOUSE LOOKS LIKE YOU NEED TO HAVE MORE FALL OFF THE HOUSE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/11/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/11/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE IS A LOW AREA IN THE ROAD SIDE SWALE ALL AREAS ARE PAINTED 2) THE RIGHT SIDE OF HOUSE LOOKS LIKE YOU NEED TO HAVE MORE FALL OFF THE HOUSE | |||
| ELECTRIC - EARLY POWER | 04/21/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 1424. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 04/18/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 04/06/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/06/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/23/2023 | APPROVED | TSCHWEERS |
| INSULATION | 02/21/2023 | APPROVED | LMILLER |
| Note: 2-21-23 notes below resolved 2/16/2023 - PREVIOUS INSPECTION NOTES 2/16/2023- 1. many romex pass thru holes need to be firestopped (double check walls with insulation) check thru out. 2. fire stop top of double wall at ac plenum in garage. 3.wires tampered with at doorway for Laundry please fasten to stud. 4. exhaust duct in bathroom tampered with 3' section cut out. | |||
| INSULATION | 02/16/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 2/16/2023- 1. many romex pass thru holes need to be firestopped (double check walls with insulation) check thru out. 2. fire stop top of double wall at ac plenum in garage. 3.wires tampered with at doorway for Laundry please fasten to stud. 4. exhaust duct in bathroom tampered with 3' section cut out. | |||
| ALL ROUGH | 02/09/2023 | APPROVED | TSTAUFFACHER |
| Note: 2/7/2023 - PREVIOUS INSPECTION NOTES 2/7/23: Inspection stopped again! Contractors working on stucco have windows taped off. Unable to perform window installation inspection. * Also, laundry vent is pitched backwards and outside of the top plate. Will need to be boxed in for fireprotection application. 2/2/2023 - PREVIOUS INSPECTION NOTES 10/17/2022 - PREVIOUS INSPECTION NOTES 10-17-22 1. Over framing is not per detail throughout house. 10/20/22 ok to move forward to next inspection, however need an approved letter from engineer for the load bearing wall in garage where the 2x6 was installed at the floor detailing that is ok 02/02/2023-ISPECTION STOPPED_Please call back in when ready 1.Missing protection plates throughout 2.Missing staples to secure electric wires 3.Windows not installed per manufatures specifications-(gaps to jamb too large) 4.WH Pipe in bedroom outside plane of wall | |||
| ALL ROUGH | 02/07/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/7/23: Inspection stopped again! Contractors working on stucco have windows taped off. Unable to perform window installation inspection. * Also, laundry vent is pitched backwards and outside of the top plate. Will need to be boxed in for fireprotection application. 2/2/2023 - PREVIOUS INSPECTION NOTES 10/17/2022 - PREVIOUS INSPECTION NOTES 10-17-22 1. Over framing is not per detail throughout house. 10/20/22 ok to move forward to next inspection, however need an approved letter from engineer for the load bearing wall in garage where the 2x6 was installed at the floor detailing that is ok 02/02/2023-ISPECTION STOPPED_Please call back in when ready 1.Missing protection plates throughout 2.Missing staples to secure electric wires 3.Windows not installed per manufatures specifications-(gaps to jamb too large) 4.WH Pipe in bedroom outside plane of wall | |||
| LATH/BRICK/ WATER BARRIER | 02/06/2023 | APPROVED | RSIMS |
| ALL ROUGH | 02/02/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 10/17/2022 - PREVIOUS INSPECTION NOTES 10-17-22 1. Over framing is not per detail throughout house. 10/20/22 ok to move forward to next inspection, however need an approved letter from engineer for the load bearing wall in garage where the 2x6 was installed at the floor detailing that is ok 02/02/2023-ISPECTION STOPPED_Please call back in when ready 1.Missing protection plates throughout 2.Missing staples to secure electric wires 3.Windows not installed per manufatures specifications-(gaps to jamb too large) 4.WH Pipe in bedroom outside plane of wall | |||
| ELECTRIC-TUG | 11/28/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1424. Release Power | |||
| ROOF VALLEY & METAL | 10/27/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 10/17/2022 - PREVIOUS INSPECTION NOTES 10-17-22 1. Over framing is not per detail throughout house. 10/20/22 ok to move forward to next inspection, however need an approved letter from engineer for the load bearing wall in garage where the 2x6 was installed at the floor detailing that is ok | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/20/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: 10/17/2022 - PREVIOUS INSPECTION NOTES 10-17-22 1. Over framing is not per detail throughout house. 10/20/22 ok to move forward to next inspection, however need an approved letter from engineer for the load bearing wall in garage where the 2x6 was installed at the floor detailing that is ok | |||
| WALL SHEATHING | 10/17/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/17/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 10-17-22 1. Over framing is not per detail throughout house. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/15/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/12/2022 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 08/23/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Rear footing left side of building remove the large stump from the footing. Rear of building inside footing of Lania. 2 Water distribution pipes and (1) 2" plumbing drain pipe need to be sleeved or install a relieving arch. Marked the drawings for locations. | |||
| MONOLITHIC SLAB | 08/22/2022 | Disapproved - NO FEE | JWALKER |
| Note: Rear footing left side of building remove the large stump from the footing. Rear of building inside footing of Lania. 2 Water distribution pipes and (1) 2" plumbing drain pipe need to be sleeved or install a relieving arch. Marked the drawings for locations. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/19/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/05/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/31/2023 | 06/01/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/18/2022 | 10/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/15/2022 | 07/19/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/15/2022 | 07/19/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/15/2022 | 07/22/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/15/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/09/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/09/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/28/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/28/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/28/2022 |
| SEWER CREDIT | (¤850.00) | 07/28/2022 |
| SEWER INSPECTION | ¤25.00 | 07/28/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/28/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/28/2022 |
| SITE PLAN 30 | ¤30.00 | 07/28/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/28/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/28/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/28/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/28/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/28/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/28/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/28/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/28/2022 |
| SURCHARGE FS 533.721 | ¤11.90 | 07/28/2022 |
| SURCHARGE - FS 468.631 | ¤17.85 | 07/28/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/28/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/28/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/28/2022 |
| WATER- TURN ON | ¤25.00 | 07/28/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/28/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 07/28/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 07/28/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,912.94 |