I want to search for...
Permit #2022070941
Permit Details
Status: COED
| Parcel Id: 07-11-31-7017-00010-0870 |
| CONDITIONED SPACE: 1236 sqft |
| GARAGE: 472 sqft |
| OPENED PORCH (WITH ROOF) : 65 sqft |
| Total Square Footage: 1773 sqft |
| Block: 00010 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: 386-931-2131 |
| Location Address: 203 BOULDER ROCK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/15/2022 |
| NOC: RECORDED |
| Applicant name: FLAGLER HABITAT |
| Owner: FLAGLER HABITAT FOR HUMANITY INC |
|
Address PO BOX 187 BUNNELL, FL 32110 |
| Lot: 0870 |
| Contracted Stated Job Value: ¤85,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
FLAGLER HABITAT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2 WEST MOODY BLVD BUNNELL, FL 32110 |
HABITAT | 386-931-2131 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
MICHAEL A PENAGOS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3321 GLENSHANE WAY ORMOND BEACH, FL 32174 |
CCC1330460 (Exp: 08/31/2026) | 386-569-9133 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 09/07/2023 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: 9/1/2023 - PREVIOUS INSPECTION NOTES 9/1/23= NO READY FOR INSPECTION. To the right of the AC unit, you should add some sod. | |||
| ROW - STORMWATER FINAL | 09/06/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/06/23 SOD ADDED BY AC UNIT. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ 9/6/2023 - PREVIOUS INSPECTION NOTES 9/1/2023 - PREVIOUS INSPECTION NOTES 9/1/23= NO READY FOR INSPECTION. To the right of the AC unit, you should add some sod. | |||
| U-CROSS CONNECTION | 09/06/2023 | APPROVED | DHANEY |
| U-CROSS CONNECTION | 09/01/2023 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 09/01/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 9/1/23= NO READY FOR INSPECTION. To the right of the AC unit, you should add some sod. | |||
| BLD - BUILDING FINAL | 08/28/2023 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 08/24/2023 | FINAL APPROVED | DHANEY |
| ROW- PROJECT STATUS | 08/23/2023 | APPROVED | GBERTOLA |
| Note: CHECK THE GRADE AT THIS CONSTRUCTION SITE | |||
| ROW - FINAL APRON (AFTER POUR) | 08/23/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2023 | APPROVED | GBERTOLA |
| Note: ------8/23/23= The inspector didn't read my notes. I added comments during the inspection and the grade matches them.CORRECTION WERE MADE At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ /27/23= BUILDER CALL ME ASK ME TO RIVISE THE DRAINAGE SITE PLAN, THE HOUSE ON THE RIGHT SIDE IS MOVING THE WATER TO THE BACK. CONCLUSION: THE NEW DRAINAGE WILL BE SPLIT FROM THE BACK AND TO THE FRONT THE HIGHT POINT START AT THE BACK CORNERS OF THE HOUSE TO THE PROPERTY LINE AND THE BACK YARD GOING TO THE BACK PER GBERTOLA | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/23/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/22/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE LEFT SIDE CAN NOT DRAIN INTO CITY DITCH Section 300.01 (A)(1)(C)(6). Unless specifically stated a portion can not drain adjacent City drainage feature. (B) 2) Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. --------------------------------------------------------------------------------- 7/27/23= BUILDER CALL ME ASK ME TO RIVISE THE DRAINAGE SITE PLAN, THE HOUSE ON THE RIGHT SIDE IS MOVING THE WATER TO THE BACK. CONCLUSION: THE NEW DRAINAGE WILL BE SPLIT FROM THE BACK AND TO THE FRONT THE HIGHT POINT START AT THE BACK CORNERS OF THE HOUSE TO THE PROPERTY LINE AND THE BACK YARD GOING TO THE BACK PER GBERTOLA | |||
| ROW- PRE-APRON (PRE-POUR) | 07/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 06/16/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10 AM | |||
| GRAVITY SEWER TEST | 06/05/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/05/2023 | APPROVED | MGIBSON |
| INSULATION | 04/24/2023 | CANCELLED BY APPLICANT | JSTEWART |
| INSULATION | 04/24/2023 | APPROVED | JSTEWART |
| Note: 4/24/2023 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 04/18/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 4/16/2023--Please connect and seal Exhaust fan duct work, and leave open for inspection at next inspection. disreguard.....wrong address. | |||
| ALL ROUGH | 04/18/2023 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 4/16/2023--Please connect and seal Exhaust fan duct work, and leave open for inspection at next inspection. disreguard.....wrong address. | |||
| ROOF VALLEY & METAL | 03/30/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/23/2023 | APPROVED | JSTEWART |
| WINDOW NAILING | 03/16/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 03/09/2023 | APPROVED | FWILLIS |
| ELECTRIC TEMP POLE | 12/05/2022 | APPROVED | JMUNSON |
| FOUND SURVEY APPROVED (OFFICE) | 11/17/2022 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 09/20/2022 | APPROVED | FWILLIS |
| Note: 9/16/2022 - PREVIOUS INSPECTION NOTES SUPER NEVER CALLED FOR A DUO INSPECTION AS I SUGGESTED. | |||
| MONOLITHIC SLAB | 09/16/2022 | Disapproved - NO FEE | FWILLIS |
| Note: SUPER NEVER CALLED FOR A DUO INSPECTION AS I SUGGESTED. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/13/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/25/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/11/2023 | 09/11/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - (386)986-3780 - TBELGROVE@PALMCOASTGOV.COM Please name the file according to the naming convention listed on our website. The file should be named for what it is. ex NOC should be NOC | |||
| BADMIN | INFORMATION | 09/01/2023 | 09/01/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - - TBELGROVE@PALMCOASTGOV.COM PLEASE NAME ACCORDING TO THE REQUIREMENTS LISTED ON OUR WEBSITE | |||
| ENGIN1 | COMPLETE | 11/16/2022 | 11/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/16/2022 | 11/17/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/11/2022 | 10/11/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/11/2022 | 10/18/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/11/2022 | 10/11/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/10/2022 | 10/10/2022 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM The benchmark on the site plan (24.32) does not match the benchmark on the foundation survey (24.82). Please revise accordingly. | |||
| ZON | COMPLETE | 10/10/2022 | 10/10/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/01/2022 | 08/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/29/2022 | 07/29/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/29/2022 | 08/01/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/29/2022 | 08/01/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a swatch of the color teal. If it is a blue it must meet an LRV of 80 or greater | |||
| SWALE | COMPLETE | 07/21/2022 | 10/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/20/2022 | 07/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 07/20/2022 | 07/21/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in bed 3. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/20/2022 | 07/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/20/2022 | 07/21/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder | |||
| SW1 | COMPLETE | 07/20/2022 | 07/27/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/20/2022 | 07/25/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need one additional tree for this lot size Please provide a swatch of the color teal. If it is a blue it must meet an LRV of 80 or greater |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/31/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/15/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/15/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/15/2022 |
| SEWER CREDIT | (¤1,147.00) | 08/15/2022 |
| SEWER INSPECTION | ¤25.00 | 08/15/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/15/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/15/2022 |
| SITE PLAN 30 | ¤30.00 | 08/15/2022 |
| WATER- TURN ON | ¤25.00 | 08/15/2022 |
| ADJUSTMENT 50% | (¤295.64) | 08/15/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/15/2022 |
| INSPECTION - RESIDENTIAL | ¤437.25 | 08/15/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤124.02 | 08/15/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/15/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/15/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/15/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/15/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/15/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/15/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/15/2022 |
| SURCHARGE FS 533.721 | ¤2.07 | 08/15/2022 |
| SURCHARGE - FS 468.631 | ¤3.10 | 08/15/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/15/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/15/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/15/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,772.49 |