Permit #2022070942
Permit Details
Status: COED
| Parcel Id: 07-11-31-7006-00090-0140 |
| CONDITIONED SPACE: 2676 sqft |
| GARAGE: 689 sqft |
| OPENED PORCH (WITH ROOF) : 523 sqft |
| Total Square Footage: 3888 sqft |
| Block: 00090 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: 386-237-8427 |
| Location Address: 11 FLARESTONE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/15/2022 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address UNIT 1 PALM COAST, FL 32137 |
|
Address 4881 PALM COAST PARKWAY NW PALM COAST, FL 32137 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤376,270.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/16/2023 | FINAL APPROVED | AGAETANO |
| Note: 8/14/2023 - PREVIOUS INSPECTION NOTES 08-14-2023 1. Entry light at exterior not firmly installed. 2. Kitchen switches at right of refrigerator not working properly. 3. Disposal drain not tied to underside of sink. 4. No hot water. 5. Right side of AHU not sealed and unt is bent. 6. Weather proof cover not installed at AC area. 7. Holes on the exterior and interior of garage. Inspection stopped. | |||
| BLD - BUILDING FINAL | 08/14/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 08-14-2023 1. Entry light at exterior not firmly installed. 2. Kitchen switches at right of refrigerator not working properly. 3. Disposal drain not tied to underside of sink. 4. No hot water. 5. Right side of AHU not sealed and unt is bent. 6. Weather proof cover not installed at AC area. 7. Holes on the exterior and interior of garage. Inspection stopped. | |||
| ROW - STORMWATER FINAL | 08/07/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 08/01/2023 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/31/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/31/23 LEFT SIDE ALONG PROPERTY LINE FILL WASHOUT AND SOD ** CLEAN OUT CULVERT ** AS NOTED IN PREVIOUS FIELD SURVEY NEEDNTO REMOVE SEDIMENT THAT ERODED INTO CANAL DURING CONSTRUCTION OF SITE YOU WILL NEED TO GO FROM SEWALL OUT 5 FEET THE ENTIRE LENGTH _________________________________________________________________________________________________________________________ 7/26/2023 - PREVIOUS INSPECTION NOTES ** 07/26/23 BUILDER WILL NEED TO REMOVE SEDIMENT THAT HAS ERODED INTO THE CANAL DURING THE CONSTRUCTION OF THIS SITE YOU WILL NEED TO GO FROM SEAWALL OUT 5 FEET ** BUILDER NEEDS TO CUT GRASS SO INSPECTOR CAN SEE THE DRAINAGE FEATURES OF THIS LOTS | |||
| U-CROSS CONNECTION | 07/31/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 07/31/2023 | FINAL APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** 07/31/23 LEFT SIDE ALONG PROPERTY LINE FILL WASHOUT AND SOD ** CLEAN OUT CULVERT ** AS NOTED IN PREVIOUS FIELD SURVEY NEEDNTO REMOVE SEDIMENT THAT ERODED INTO CANAL DURING CONSTRUCTION OF SITE YOU WILL NEED TO GO FROM SEWALL OUT 5 FEET THE ENTIRE LENGTH _________________________________________________________________________________________________________________________ 7/26/2023 - PREVIOUS INSPECTION NOTES ** 07/26/23 BUILDER WILL NEED TO REMOVE SEDIMENT THAT HAS ERODED INTO THE CANAL DURING THE CONSTRUCTION OF THIS SITE YOU WILL NEED TO GO FROM SEAWALL OUT 5 FEET ** BUILDER NEEDS TO CUT GRASS SO INSPECTOR CAN SEE THE DRAINAGE FEATURES OF THIS LOTS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/26/2023 | APPROVED | EMADISON |
| Note: ** 07/26/23 INSPECTOR CHECKED CULVERT INVERT IT IS WITHIN TOLERANCE __________________________________________________________________________________________________________________________ 7/13/2023 - PREVIOUS INSPECTION NOTES CULVERT PIPE IS OUT OF TOLERANCE PLEASE CHECK SWALE PLAN DETAIL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/26/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/26/23 BUILDER WILL NEED TO REMOVE SEDIMENT THAT HAS ERODED INTO THE CANAL DURING THE CONSTRUCTION OF THIS SITE YOU WILL NEED TO GO FROM SEAWALL OUT 5 FEET ** BUILDER NEEDS TO CUT GRASS SO INSPECTOR CAN SEE THE DRAINAGE FEATURES OF THIS LOTS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/13/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: CULVERT PIPE IS OUT OF TOLERANCE PLEASE CHECK SWALE PLAN DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 05/18/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Culvert is tilted slightly more than a tenth in the right direction. CM on site cutting bnd bolts below the top surface of the pipe. After that READY TO POUR. | |||
| ELECTRIC - EARLY POWER | 04/26/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 04-26-2023 FPL notified at 1:46pm | |||
| TUB SET | 04/14/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 03/29/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 02/24/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 02-13-2023 Please expose UFER ground for next inspection. | |||
| ALL ROUGH | 02/13/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 02-13-2023 Please expose UFER ground for next inspection. | |||
| LATH/BRICK/ WATER BARRIER | 02/09/2023 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 02/02/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/25/2023 | APPROVED | AGAETANO |
| Note: 12/19/2022 - PREVIOUS INSPECTION NOTES 12-19-2022 1. Shiners at right front window area. Check all. 2. Sheet A1 Covered Porch. Typical LVL is indicated. 2- 2 X 12 and OSB installed. Please revise and submit to the building department along with the nailing pattern for 2 x 12. Side header nailing not visible. 3. A 20 and A30 missing members. 4. B06 and B07 missing members. 5. Please revise truss plan. B09 and B10 indicated purlins at top chord. 6. Sheet A6, Typical frame to non bearing to CMU not installed as per plans. Inspection stopped. | |||
| WALL SHEATHING | 12/19/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/19/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 12-19-2022 1. Shiners at right front window area. Check all. 2. Sheet A1 Covered Porch. Typical LVL is indicated. 2- 2 X 12 and OSB installed. Please revise and submit to the building department along with the nailing pattern for 2 x 12. Side header nailing not visible. 3. A 20 and A30 missing members. 4. B06 and B07 missing members. 5. Please revise truss plan. B09 and B10 indicated purlins at top chord. 6. Sheet A6, Typical frame to non bearing to CMU not installed as per plans. Inspection stopped. | |||
| TIE BEAM / LINTEL | 11/18/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 10/26/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/07/2022 | APPROVED | AGAETANO |
| Note: 10/6/2022 - PREVIOUS INSPECTION NOTES 10-6-2022 A2 note 10 missed. 2 36 x 36 pads 4 #5 rebar. | |||
| FOOTER | 10/06/2022 | CANCELLED BY INSPECTOR | AGAETANO |
| Note: Contractor needs a mono slab not a footer inspection. | |||
| MONOLITHIC SLAB | 10/06/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 10-6-2022 A2 note 10 missed. 2 36 x 36 pads 4 #5 rebar or provide engineering to the building department to state otherwise. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/20/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/20/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/25/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/18/2023 | 01/18/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/26/2022 | 10/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/26/2022 | 10/26/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/05/2022 | 08/05/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New survey submitted the file is blank. Need a right of way agreement signed by owner and notarized for paver driveway. Once electronic copy is approved original must be turned into us for recording | |||
| ENGIN1 | COMPLETE | 08/05/2022 | 08/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 07/25/2022 | 07/26/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 7/20/22, the structure will not fall within the SFHA. No elevation certificates will be required. | |||
| PLENV | COMPLETE | 07/25/2022 | 08/04/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 8/4/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. | |||
| SWALE | COMPLETE | 07/21/2022 | 10/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/20/2022 | 07/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/20/2022 | 07/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/20/2022 | 07/27/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/20/2022 | 07/25/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need a right of way agreement signed by owner and notarized for paver driveway. Once electronic copy is approved original must be turned into us for recording One additional tree required for this lot size Please list gallon sizes of shrubs on landscape plan Must have four shrubs along each side |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/16/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/16/2023 |
| CONNECTION FEES | ¤1,077.88 | 08/15/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/15/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/15/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/15/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/15/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/15/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/15/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/15/2022 |
| SURCHARGE FS 533.721 | ¤4.27 | 08/15/2022 |
| SURCHARGE - FS 468.631 | ¤6.41 | 08/15/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/15/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/15/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/15/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/15/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/15/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/15/2022 |
| SEWER INSPECTION | ¤25.00 | 08/15/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/15/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/15/2022 |
| SITE PLAN 30 | ¤30.00 | 08/15/2022 |
| 08/15/2022 | ||
| WATER- TURN ON | ¤25.00 | 08/15/2022 |
| ADJUSTMENT 50% | (¤680.41) | 08/15/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/15/2022 |
| INSPECTION - RESIDENTIAL | ¤1,036.75 | 08/15/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤294.06 | 08/15/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,954.77 |