I want to search for...
Permit #2022071098
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00380-0070 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 631-929-5500 |
| Location Address: 157 UNDERWOOD TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/03/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICK PALM DEVELOPMENT LLC |
|
Address SUITE 110 GREENWOOD VILLAGE, CO 80111 |
|
Address 5460 S QUEBEC ST GREENWOOD VILLAGE, CO 80111 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/18/2023 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL APRON (AFTER POUR) | 05/15/2023 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 05/15/2023 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 05/15/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/02/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THE FINAL SURVEY SHOWS THE SWALE ON THE INSIDE OF PROPERTY LINE BUT IN THE FIELD LOOK LIKE A COMMON SWALE SO PASSING | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/02/2023 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9463 THE FINAL SURVEY SHOWS THE SWALE ON THE INSIDE OF PROPERTY LINE BUT IN THE FIELD LOOK LIKE A COMMON SWALE SO PASSING | |||
| ELECTRIC - EARLY POWER | 04/26/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-26-23 1. Emailed FPL at 2:42. | |||
| INSULATION | 01/20/2023 | APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 01/17/2023 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 01/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 01/11/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/11/2023 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 01/05/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 12/13/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 12/09/2022 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 12/09/2022 | APPROVED | BTAYLOR |
| WALL SHEATHING | 12/05/2022 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11-2-22 1. Mud beds can't exceed 1/2" maximum. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/05/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11-2-22 1. Mud beds can't exceed 1/2" maximum. 12-5-22 1. Gable not strapped. 2. Engineering not complete. | |||
| ROOF VALLEY & METAL | 12/05/2022 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11-2-22 1. Mud beds can't exceed 1/2" maximum. | |||
| TIE BEAM / LINTEL | 11/02/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: 11-2-22 1. Mud beds can't exceed 1/2" maximum. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/19/2022 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/11/2022 | APPROVED | BTAYLOR |
| Note: 10/10/2022 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED, DITCHES ARE COVERED UP | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/10/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO PLANS OR PERMIT POSTED, DITCHES ARE COVERED UP | |||
| WATER METER INSTALLATION REQUEST | 10/04/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/06/2023 | 03/06/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/15/2022 | 12/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/15/2022 | 08/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/15/2022 | 08/22/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/15/2022 | 08/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/15/2022 | 08/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/26/2022 | 07/26/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/22/2022 | 11/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/22/2022 | 07/22/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM plans different address 39 Ryan lien law 39 Ryan | |||
| BLD | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/22/2022 | 07/25/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/22/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from correct mechanical subcontractor | |||
| SW1 | HOLD | 07/22/2022 | 07/27/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE BOTH PROPERTY LINES A COMMON SWALE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/01/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/01/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/01/2023 |
| CONNECTION FEES | ¤1,077.88 | 10/03/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 10/03/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/03/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/03/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/03/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/03/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/03/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/03/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/03/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/03/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 10/03/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 10/03/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/03/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/03/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/03/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/03/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/03/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/03/2022 |
| SEWER CREDIT | (¤850.00) | 10/03/2022 |
| SEWER INSPECTION | ¤25.00 | 10/03/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/03/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/03/2022 |
| SITE PLAN 30 | ¤30.00 | 10/03/2022 |
| WATER- TURN ON | ¤25.00 | 10/03/2022 |
| ADJUSTMENT 50% | (¤405.07) | 10/03/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/03/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 10/03/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 10/03/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,925.48 |