Permit #2022071104
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00190-0040 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00190 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 631-929-5500 |
| Location Address: 14 ZIRCON CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/01/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: SEASMOKE PROPERTIES FLORIDA LLC |
|
Address 27 WILDWOOD ROAD SAG HARBOR, NY 11963 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/15/2023 | FINAL APPROVED | TSTAUFFACHER |
| Note: 6/13/2023 - PREVIOUS INSPECTION NOTES 6/13/23: 1). AHU breaker is too small. (Min. 47.9 / Max 50). 45 amp installed. 2). AC condenser pad does not have the 3" minimum clearance from grade as required by FBC 1305.1.4.1 3). Plumbing vent pipes missing roof flanges. 4). Bathroom & bedroom door handles were not completed (superintendent was installing upon arrival). 5). Garbage disposal had foreign debris so could not complete testing. | |||
| BLD - BUILDING FINAL | 06/13/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/13/23: 1). AHU breaker is too small. (Min. 47.9 / Max 50). 45 amp installed. 2). AC condenser pad does not have the 3" minimum clearance from grade as required by FBC 1305.1.4.1 3). Plumbing vent pipes missing roof flanges. 4). Bathroom & bedroom door handles were not completed (superintendent was installing upon arrival). 5). Garbage disposal had foreign debris so could not complete testing. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/09/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THERE A CHIP OUT OF THE DRIVEWAY ON LEFT SIDE PASSING AS NOTED IF MAKE THEM REPAIR MIGHT HURT THE STRANGTH OF CONCRETE AROUND IT. | |||
| ROW - STORMWATER FINAL | 06/09/2023 | FINAL APPROVED | PFLANAGAN |
| Note: LOOKS GOOD AT THE TIME OF INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/09/2023 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/08/2023 | APPROVED | PFLANAGAN |
| Note: 6/5/2023 - PREVIOUS INSPECTION NOTES NEED TO BRING UP THE BACK LEFT AREA. AREA IS PAINTED WITH PINK PAINT. ALSO NEED SOD AROUND THERE ALSO. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/05/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/05/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO BRING UP THE BACK LEFT AREA. AREA IS PAINTED WITH PINK PAINT. ALSO NEED SOD AROUND THERE ALSO. | |||
| ELECTRIC - EARLY POWER | 05/01/2023 | APPROVED | RSIMS |
| ROW- PRE-APRON (PRE-POUR) | 04/04/2023 | APPROVED | GBERTOLA |
| Note: 4/4/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/3/2023 - PREVIOUS INSPECTION NOTES 1) THE FORM BOARD AT EDGE OF PAVEMENT IS DOWN 2) NEED TO HAVE DIRT ON ALL FORMS SO THE CONCRETE STAYS IN POURING AREA 3) THERE ARE AREAS IN THE POURING AREA THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. --------------------------------------------------------------------------------------------------------- 3/30/2023 - PREVIOUS INSPECTION NOTES . ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 Not ready for inspection. Not formed, PICTURE ATTACHED _+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| ROW- PRE-APRON (PRE-POUR) | 04/03/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE FORM BOARD AT EDGE OF PAVEMENT IS DOWN 2) NEED TO HAVE DIRT ON ALL FORMS SO THE CONCRETE STAYS IN POURING AREA 3) THERE ARE AREAS IN THE POURING AREA THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. --------------------------------------------------------------------------------------------------------- 3/30/2023 - PREVIOUS INSPECTION NOTES . ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 Not ready for inspection. Not formed, PICTURE ATTACHED _+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| ROW- PRE-APRON (PRE-POUR) | 03/30/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: . ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 Not ready for inspection. Not formed, PICTURE ATTACHED _+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| U - SEWER TIE IN | 03/22/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/22/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/13/2023 | APPROVED | TSCHWEERS |
| INSULATION | 01/25/2023 | APPROVED | RSIMS |
| Note: 1/18/2023 - PREVIOUS INSPECTION NOTES 1/18/23: Still no address on building as previously noted! (Deficiences marked on studs & floor below area) 1). Missing firestop at Kitchen range hood exhaust at top plate penetration. 2). Back left bedroom at top plate - 2 areas. 3). Laundry room at top plate for 2" PVC vent pipe. 4). Bathroom at top plate for 2" PVC vent pipe. 5). Front right bedroom at top plate for switch wires. (on hall closet side hole is open) Inspector Notes from Inspection 2320 1/11/23: Per Contractor's letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23: 1). Missing lath / stop around back sliding door as required. | |||
| INSULATION | 01/18/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/18/23: Still no address on building as previously noted! (Deficiences marked on studs & floor below area) 1). Missing firestop at Kitchen range hood exhaust at top plate penetration. 2). Back left bedroom at top plate - 2 areas. 3). Laundry room at top plate for 2" PVC vent pipe. 4). Bathroom at top plate for 2" PVC vent pipe. 5). Front right bedroom at top plate for switch wires. (on hall closet side hole is open) Inspector Notes from Inspection 2320 1/11/23: Per Contractor's letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23: 1). Missing lath / stop around back sliding door as required. | |||
| ELECTRIC-TUG | 01/11/2023 | APPROVED | RSIMS |
| Note: 1/11/23: FPL emailed at @ 10:00. 1/6/2023 - PREVIOUS INSPECTION NOTES 1/6/23: 1). No UFER ground - Only one ground bar for copper ground. Requires 2 6ft. apart. 2). TUG outlet box is not fastened to the wall. | |||
| LATH/BRICK/ WATER BARRIER | 01/11/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 1/11/23: Per Contractor's letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23: 1). Missing lath / stop around back sliding door as required. | |||
| ALL ROUGH | 01/11/2023 | APPROVED | RSIMS |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES 1/6/23: 1). Kitchen smoke detector is less than 20ft away from cooking appliance per R314.3.1(1). | |||
| LATH/BRICK/ WATER BARRIER | 01/09/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/9/23: 1). Missing lath / stop around back sliding door as required. | |||
| LATH/BRICK/ WATER BARRIER | 01/06/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 01/06/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/6/23: 1). No UFER ground - Only one ground bar for copper ground. Requires 2 6ft. apart. 2). TUG outlet box is not fastened to the wall. | |||
| ALL ROUGH | 01/06/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/6/23: 1). Kitchen smoke detector is less than 20ft away from cooking appliance per R314.3.1(1). | |||
| U-CROSS CONNECTION | 01/05/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROOF VALLEY & METAL | 12/15/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/13/2022 | APPROVED | RSIMS |
| Note: 12/12/2022 - PREVIOUS INSPECTION NOTES 12/7/22: Roof sheathing / Braces / Down Cell / Truss Engineering / Framing - Checked and approved. Tie-down - Disapproved. (Areas marked on wall below) 1). Truss A07 (x2) - straps are not fully nailed properly. 2). Girder Truss A01 - strap is not fully nailed properly. Inspector Notes from Inspection 2340 11/23/2022: NEED PILE OF TRASH AT JOB BOX CLEANED UP BEFORE NEXT INSPECTION! 11/22/2022 - PREVIOUS INSPECTION NOTES 11-22-22 1. Rebar dowel missing circled on plans. | |||
| WALL SHEATHING | 12/12/2022 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2340 11/23/2022: NEED PILE OF TRASH AT JOB BOX CLEANED UP BEFORE NEXT INSPECTION! 11/22/2022 - PREVIOUS INSPECTION NOTES 11-22-22 1. Rebar dowel missing circled on plans. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/12/2022 | Disapproved - NO FEE | RSIMS |
| Note: 12/12/22: Roof sheathing / Braces / Down Cell / Truss Engineering / Framing - Checked and approved. Tie-down - Disapproved. (Areas marked on wall below) 1). Truss A07 (x2) - straps are not fully nailed properly. 2). Girder Truss A01 - strap is not fully nailed properly. Inspector Notes from Inspection 2340 11/23/2022: NEED PILE OF TRASH AT JOB BOX CLEANED UP BEFORE NEXT INSPECTION! 11/22/2022 - PREVIOUS INSPECTION NOTES 11-22-22 1. Rebar dowel missing circled on plans. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/09/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/23/2022 | APPROVED - AS NOTED | RSIMS |
| Note: 11/23/2022: NEED PILE OF TRASH AT JOB BOX CLEANED UP BEFORE NEXT INSPECTION! 11/22/2022 - PREVIOUS INSPECTION NOTES 11-22-22 1. Rebar dowel missing circled on plans. | |||
| TIE BEAM / LINTEL | 11/22/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-22-22 1. Rebar dowel missing circled on plans. | |||
| MONOLITHIC SLAB | 11/08/2022 | APPROVED | RSIMS |
| Note: 11/7/2022 - PREVIOUS INSPECTION NOTES 11/7/2022: INSPECTION STOPPED * Item 5 listed below is still not resolved. Clear araea & remove root that is within the the footer form boards. 11/4/2022 - PREVIOUS INSPECTION NOTES 11/4/2022: INSPECTION STOPPED! Areas highlighted on plan. PLEASE REMOVE DEBRIS/TRASH AT PERMIT BOX TO PROVIDE CLEAR ACCESS TO BOX/PLANS. 1). Clean out footer by back right hose bibb to provide 3" minimum clearance to rebar. 2). Left column footer at back patio: is not located per plan (2'-4" off corner) & rebar is not in the footer as required on plan. 3). Rebar at back left column footer does not have enough clearance from side of footer. 4). Clean out cave in at back left corner to provikde 3" minimum clearance to rebar 5). Clean out area by water main / meter feed to provide 3" minimum clearance to rebar and remove root at edge. | |||
| MONOLITHIC SLAB | 11/07/2022 | Disapproved - NO FEE | RSIMS |
| Note: 11/7/2022: INSPECTION STOPPED * Item 5 listed below is still not resolved. Clear araea & remove root that is within the the footer form boards. 11/4/2022 - PREVIOUS INSPECTION NOTES 11/4/2022: INSPECTION STOPPED! Areas highlighted on plan. PLEASE REMOVE DEBRIS/TRASH AT PERMIT BOX TO PROVIDE CLEAR ACCESS TO BOX/PLANS. 1). Clean out footer by back right hose bibb to provide 3" minimum clearance to rebar. 2). Left column footer at back patio: is not located per plan (2'-4" off corner) & rebar is not in the footer as required on plan. 3). Rebar at back left column footer does not have enough clearance from side of footer. 4). Clean out cave in at back left corner to provikde 3" minimum clearance to rebar 5). Clean out area by water main / meter feed to provide 3" minimum clearance to rebar and remove root at edge. | |||
| MONOLITHIC SLAB | 11/04/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/4/2022: INSPECTION STOPPED! Areas highlighted on plan. PLEASE REMOVE DEBRIS/TRASH AT PERMIT BOX TO PROVIDE CLEAR ACCESS TO BOX/PLANS. 1). Clean out footer by back right hose bibb to provide 3" minimum clearance to rebar. 2). Left column footer at back patio: is not located per plan (2'-4" off corner) & rebar is not in the footer as required on plan. 3). Rebar at back left column footer does not have enough clearance from side of footer. 4). Clean out cave in at back left corner to provikde 3" minimum clearance to rebar 5). Clean out area by water main / meter feed to provide 3" minimum clearance to rebar and remove root at edge. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/02/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/02/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/10/2023 | 03/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/15/2022 | 12/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/08/2022 | 12/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2022 | 12/08/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/02/2022 | 11/02/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM SOMEONE SCHEDULE A FOUNDATION INSPECTION ONLINE THE FOUNDATION HAS TO BE UPLOADED AND REVIEW BEFORE ITS RESULTED. | |||
| MECH | COMPLETE | 08/24/2022 | 08/24/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/24/2022 | 08/31/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/24/2022 | 08/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/22/2022 | 07/25/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/22/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from correct mechanical subcontractor | |||
| SW1 | HOLD | 07/22/2022 | 07/28/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE BOTH RIGHT AND LEFT POPERTY LINES A COMMON SWALE | |||
| ZON | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/22/2022 | 11/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/05/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/05/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/05/2023 |
| WATER- TURN ON | ¤25.00 | 11/01/2022 |
| ADJUSTMENT 50% | (¤405.07) | 11/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/01/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 11/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 11/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 11/01/2022 |
| SEWER CREDIT | (¤3,066.58) | 11/01/2022 |
| SEWER INSPECTION | ¤25.00 | 11/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 11/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 11/01/2022 |
| SITE PLAN 30 | ¤30.00 | 11/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 11/01/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 11/01/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 11/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/01/2022 |
| IMPACT FEE FIRE | ¤388.65 | 11/01/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 11/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/01/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 11/01/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 11/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,856.40 |