I want to search for...

Permit #2022071106

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00070-0220
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00070
Subdivision: -
Job Phone: 631-929-5500
Location Address: 49 SENTINEL TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/28/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: SEASMOKE PROPERTIES FLORIDA LLC

Address

STE 210

WEST PALM BEACH, FL 33401

Address

515 N FLAGLER DR

WEST PALM BEACH, FL 33401

Lot: 0220
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/08/2023 FINAL APPROVED BTAYLOR
U -UTILITY RESIDENTIAL FINAL 06/06/2023 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 06/01/2023 APPROVED GBERTOLA
Note: 6/1/23=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/26/2023 - PREVIOUS INSPECTION NOTES THE ROAD SIDE SWALE NEEDS TO MTCH THE EXISTING GRADE ON THE VACANT
ROW - STORMWATER FINAL 06/01/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 06/01/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/26/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 05/26/2023 Disapproved - NO FEE PFLANAGAN
Note: THE ROAD SIDE SWALE NEEDS TO MTCH THE EXISTING GRADE ON THE VACANT
ELECTRIC - EARLY POWER 05/02/2023 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 1:45 PM
ROW- PRE-APRON (PRE-POUR) 04/25/2023 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY. ---------------------------------------------------------------------------------------------------------- 4/20/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT DIRT UP ON FORMS SO CONCRETE WILL STAY IN POURING AREA 2) THERE IS TO MUCH CHIPED ASPHALT IN THE POURING NEED TO REMOVE ALL
ROW- PRE-APRON (PRE-POUR) 04/20/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO PUT DIRT UP ON FORMS SO CONCRETE WILL STAY IN POURING AREA 2) THERE IS TO MUCH CHIPED ASPHALT IN THE POURING NEED TO REMOVE ALL
U - SEWER TIE IN 03/31/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 03/31/2023 APPROVED MGIBSON
INSULATION 01/23/2023 APPROVED BTAYLOR
Note: 1/20/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1-17-23 1. Hole in top of electrical panel needs to be sealed. 2. Need fire blocking at microwave vent.
INSULATION 01/20/2023 CANCELLED BY APPLICANT BTAYLOR
Note: Inspector Notes from Inspection 2420 1-17-23 1. Hole in top of electrical panel needs to be sealed. 2. Need fire blocking at microwave vent.
PEP TANK INSTALLATION REQUEST 01/20/2023 APPROVED - AS NOTED TSCHWEERS
Note: 1/20/2023 Gravity Sewer
U-CROSS CONNECTION 01/17/2023 APPROVED DHANEY
ALL ROUGH 01/17/2023 APPROVED - AS NOTED BTAYLOR
Note: 1-17-23 1. Hole in top of electrical panel needs to be sealed. 2. Need fire blocking at microwave vent.
LATH/BRICK/ WATER BARRIER 01/12/2023 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/15/2022 APPROVED BTAYLOR
ELECTRIC-TUG 12/15/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/14/2022 APPROVED BTAYLOR
Note: 12/12/2022 - PREVIOUS INSPECTION NOTES 12-12-22 1. Over framing not nailed off. 2. MGT not nailed off.
WALL SHEATHING 12/12/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/12/2022 Disapproved - NO FEE BTAYLOR
Note: 12-12-22 1. Over framing not nailed off. 2. MGT not nailed off.
FOUND SURVEY APPROVED (OFFICE) 11/29/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/17/2022 APPROVED BTAYLOR
MONOLITHIC SLAB 11/07/2022 Disapproved - NO FEE KSANDOE
Note: Missing termite cert. Clear cave-in on left side.
MONOLITHIC SLAB 11/07/2022 APPROVED KSANDOE
Note: 11/7/2022 - PREVIOUS INSPECTION NOTES Missing termite cert. Clear cave-in on left side.
PLUMBING 1ST ROUGH UNDERGROUND 11/03/2022 APPROVED BTAYLOR
Note: 11/2/2022 - PREVIOUS INSPECTION NOTES 5 ' HEAD TEST NOT HOLDING
PLUMBING 1ST ROUGH UNDERGROUND 11/02/2022 Disapproved -FEE REQUIRED MGIBSON
Note: 5 ' HEAD TEST NOT HOLDING
WATER METER INSTALLATION REQUEST 11/02/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/06/2023 06/06/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/29/2022 11/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/29/2022 11/29/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 11/22/2022 11/22/2022
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Foundation Survey incorrect address
ZON COMPLETE 08/11/2022 08/11/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/11/2022 08/11/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/11/2022 08/17/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
MECH COMPLETE 07/29/2022 07/29/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 07/29/2022 07/29/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment Incorrect map panel number please correct should be 0245E
SW1 COMPLETE 07/29/2022 08/05/2022
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/29/2022 07/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/22/2022 07/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/22/2022 07/25/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/22/2022 07/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/22/2022 07/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/22/2022 07/27/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 07/22/2022 07/22/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from correct mechanical subcontractor
SW1 HOLD 07/22/2022 07/28/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN IS REJECTED NEED TO SUBMIT A NEW SITE PLAN
ZON HOLD 07/22/2022 07/27/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Incorrect map panel number please correct should be 0245E
SWALE COMPLETE 07/22/2022 11/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/08/2023
REINSPECTION RESIDENTIAL ¤40.00 06/08/2023
SW ENG REINSPECTION 30 ¤30.00 06/08/2023
SW ENG - REVIEW 20 ¤20.00 10/28/2022
SW ENG RES REVIEW 200 ¤200.00 10/28/2022
SEWER CREDIT (¤1,466.00) 10/28/2022
SEWER INSPECTION ¤25.00 10/28/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/28/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/28/2022
SITE PLAN 30 ¤30.00 10/28/2022
CONNECTION FEES ¤1,077.88 10/28/2022
CONTRACTOR CHANGE ¤40.00 10/28/2022
CONTRACTOR CHANGE ¤20.00 10/28/2022
IMPACT FEE FIRE ¤388.65 10/28/2022
IMPACT FEE PARKS ¤1,455.13 10/28/2022
IMPACT FEE SCHOOL ¤3,600.00 10/28/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/28/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/28/2022
SURCHARGE FS 533.721 ¤2.69 10/28/2022
SURCHARGE - FS 468.631 ¤4.04 10/28/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/28/2022
SW ENG INSPECTION 80 ¤80.00 10/28/2022
SW ENG PRE APRON ¤30.00 10/28/2022
WATER- TURN ON ¤25.00 10/28/2022
ADJUSTMENT 50% (¤405.07) 10/28/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/28/2022
INSPECTION - RESIDENTIAL ¤607.75 10/28/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 10/28/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,415.21