I want to search for...
Permit #2022071109
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00150-0230 |
| CONDITIONED SPACE: 1720 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| GARAGE: 455 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00150 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 631-929-5500 |
| Location Address: 39 RYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/25/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICK PALM DEVELOPMENT LLC |
|
Address SUITE 110 GREENWOOD VILLAGE, CO 80111 |
|
Address 5460 S QUEBEC ST GREENWOOD VILLAGE, CO 80111 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤190,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/15/2023 | FINAL APPROVED | JWALKER |
| BLD - BUILDING FINAL | 06/12/2023 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 06/12/2023 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/09/2023 | APPROVED | GBERTOLA |
| Note: 6/9/23= At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 UPON WALKING PROPERTY FOR FIELD SURVEY. THERE ARE WASHOUTS IN SOD ON LEFT SIDE PROPERTY LINE THAT HAVE DEPOSITED DIRT/SILT ALONG REAR LEFT PROPERTY LINE. THIS AREA WILL NEED TO BE ADDRESSED TO ENSURE POSITIVE REAR TO FRONT DRAINAGE WHILE NOT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. PLEASE SEE PHOTO FOR REFERENCE ____________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE A FINAL SURVEY INSPECTION DONE BEFORE THIS INSPECTION | |||
| ROW - STORMWATER FINAL | 06/09/2023 | APPROVED | GBERTOLA |
| Note: 06/9/23=At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTED WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA | |||
| ROW - FINAL APRON (AFTER POUR) | 06/09/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/07/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/07/23 UPON WALKING PROPERTY FOR FIELD SURVEY. THERE ARE WASHOUTS IN SOD ON LEFT SIDE PROPERTY LINE THAT HAVE DEPOSITED DIRT/SILT ALONG REAR LEFT PROPERTY LINE. THIS AREA WILL NEED TO BE ADDRESSED TO ENSURE POSITIVE REAR TO FRONT DRAINAGE WHILE NOT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. PLEASE SEE PHOTO FOR REFERENCE ____________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE A FINAL SURVEY INSPECTION DONE BEFORE THIS INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/07/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 06/07/23 NUMBERS SHOW POSITIVE REAR TO FRONT NUMBERS. WILL COMPARE WHILE WALKING PROPERTY FOR FIELD SURVEY. _____________________________________________________________________________________________________________________ 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTED WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/06/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE A FINAL SURVEY INSPECTION DONE BEFORE THIS INSPECTION | |||
| U-CROSS CONNECTION | 05/26/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PROJECT STATUS | 05/25/2023 | APPROVED | GBERTOLA |
| Note: 05/25/23=BUILDER NEED TO ADD A SWALE OR A BERM TO HOLD THE WATER IMPACTING THE HOME OWNER ON THE LEFT SIDE 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTING WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA | |||
| ROW- PROJECT STATUS | 05/24/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTED WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA | |||
| ELECTRIC - EARLY POWER | 05/03/2023 | APPROVED | JSTEWART |
| GRAVITY SEWER TEST | 03/23/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 03/23/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 02/02/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 02/02/2023 | APPROVED | JWALKER |
| Note: 1/30/2023 - PREVIOUS INSPECTION NOTES 1/30/23 Below listed corrections from the all rough inspection have not been made. Inspector Notes from Inspection 2420 1. The 2" PVC plumbing vent is to be sloped downward towards the drain and supported 4' o.c. 2. Microwave duct, Seal completely. 3. The two HVAC flex duct sitting on the microwave duct need to be lifted and supported. Check above listed at insulation inspection. | |||
| INSULATION | 01/30/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1/30/23 Below listed corrections from the all rough inspection have not been made. Inspector Notes from Inspection 2420 1. The 2" PVC plumbing vent is to be sloped downward towards the drain and supported 4' o.c. 2. Microwave duct, Seal completely. 3. The two HVAC flex duct sitting on the microwave duct need to be lifted and supported. Check above listed at insulation inspection. | |||
| PEP TANK INSTALLATION REQUEST | 01/30/2023 | APPROVED | TSCHWEERS |
| ALL ROUGH | 01/18/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. The 2" PVC plumbing vent is to be sloped downward towards the drain and supported 4' o.c. 2. Microwave duct, Seal completely. 3. The two HVAC flex duct sitting on the microwave duct need to be lifted and supported. Check above listed at insulation inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/13/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Install missing HG10A anchors at front entry gabel cross bracing. Check at All Rough inspection. | |||
| LATH/BRICK/ WATER BARRIER | 01/12/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/09/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Trusses A07 2 of 5 engineering has been cut out. Page S-2 of the plan set is missing. Note to contractor ensure HG10a anchors are installed at gable cross bracing. 1/9/23 1. Truss engineering is to be 2x4 or greater 1x6 used to correct the cut out engineering. 2. Gable end cross bracing HG10A anchors have not been installed. 3. Gable end over front entry cross bracing is to be 4' o.c. install missing cross bracing and truss blocking. | |||
| ROOF VALLEY & METAL | 01/09/2023 | APPROVED | JWALKER |
| Note: New inspection due to canceled inspection 1/4/2023 - PREVIOUS INSPECTION NOTES Roof valley metal cannot be passed untill roof sheating noted at roof bracing inspection is corrected. Sheating has been corrected. | |||
| ROOF VALLEY & METAL | 01/06/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 1/4/2023 - PREVIOUS INSPECTION NOTES Roof valley metal cannot be passed untill roof sheating noted at roof bracing inspection is corrected. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 1/4/2023 - PREVIOUS INSPECTION NOTES Truss A07 rear porch is missing a hold down anchor. Truss A04 front of building Strap is not nailed. Trusses A07 2 of 5 engineering has been cut out. Page S-2 of the plan set is missing. Note to contractor ensure HG10a anchors are installed at gable cross bracing. Roof sheating at gable over front entry not nailed. Circled drawing for locations. | |||
| ROOF VALLEY & METAL | 01/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: Roof valley metal cannot be passed untill roof sheating noted at roof bracing inspection is corrected. | |||
| WALL SHEATHING | 01/04/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: Truss A07 rear porch is missing a hold down anchor. Truss A04 front of building Strap is not nailed. Trusses A07 2 of 5 engineering has been cut out. Page S-2 of the plan set is missing. Note to contractor ensure HG10a anchors are installed at gable cross bracing. Roof sheating at gable over front entry not nailed. Circled drawing for locations. | |||
| ELECTRIC-TUG | 01/04/2023 | APPROVED | JMUNSON |
| FOUND SURVEY APPROVED (OFFICE) | 11/18/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/16/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 11/02/2022 | APPROVED | JWALKER |
| Note: 11/1/2022 - PREVIOUS INSPECTION NOTES 10/28/2022 - PREVIOUS INSPECTION NOTES Soil wash outs into the footings due to heavy rain. | |||
| MONOLITHIC SLAB | 11/01/2022 | CANCELLED BY APPLICANT | JWALKER |
| Note: 10/28/2022 - PREVIOUS INSPECTION NOTES Soil wash outs into the footings due to heavy rain. | |||
| MONOLITHIC SLAB | 10/28/2022 | Disapproved - NO FEE | JWALKER |
| Note: Soil wash outs into the footings due to heavy rain. | |||
| WATER METER INSTALLATION REQUEST | 10/27/2022 | APPROVED | CSTONE |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/26/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/20/2023 | 03/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/18/2022 | 11/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/18/2022 | 11/18/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/04/2022 | 08/04/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/28/2022 | 07/28/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Missing attachment | |||
| BLD | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/22/2022 | 07/25/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/22/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from correct mechanical subcontractor | |||
| SW1 | COMPLETE | 07/22/2022 | 07/28/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/22/2022 | 11/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/15/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/15/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/25/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/25/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/25/2022 |
| SEWER CREDIT | (¤1,466.00) | 10/25/2022 |
| SEWER INSPECTION | ¤25.00 | 10/25/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/25/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/25/2022 |
| SITE PLAN 30 | ¤30.00 | 10/25/2022 |
| WATER- TURN ON | ¤25.00 | 10/25/2022 |
| ADJUSTMENT 50% | (¤405.07) | 10/25/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/25/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 10/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 10/25/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/25/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 10/25/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/25/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/25/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/25/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/25/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/25/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/25/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/25/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/25/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 10/25/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 10/25/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/25/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/25/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,356.98 |