I want to search for...

Permit #2022071109

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00150-0230
CONDITIONED SPACE: 1720 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
GARAGE: 455 sqft
Total Square Footage: 2459 sqft
Block: 00150
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 631-929-5500
Location Address: 39 RYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/25/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: WICK PALM DEVELOPMENT LLC

Address

SUITE 110

GREENWOOD VILLAGE, CO 80111

Address

5460 S QUEBEC ST

GREENWOOD VILLAGE, CO 80111

Lot: 0230
Contracted Stated Job Value: ¤190,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/15/2023 FINAL APPROVED JWALKER
BLD - BUILDING FINAL 06/12/2023 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 06/12/2023 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 06/09/2023 APPROVED GBERTOLA
Note: 6/9/23= At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 UPON WALKING PROPERTY FOR FIELD SURVEY. THERE ARE WASHOUTS IN SOD ON LEFT SIDE PROPERTY LINE THAT HAVE DEPOSITED DIRT/SILT ALONG REAR LEFT PROPERTY LINE. THIS AREA WILL NEED TO BE ADDRESSED TO ENSURE POSITIVE REAR TO FRONT DRAINAGE WHILE NOT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. PLEASE SEE PHOTO FOR REFERENCE ____________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE A FINAL SURVEY INSPECTION DONE BEFORE THIS INSPECTION
ROW - STORMWATER FINAL 06/09/2023 APPROVED GBERTOLA
Note: 06/9/23=At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTED WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA
ROW - FINAL APRON (AFTER POUR) 06/09/2023 APPROVED GBERTOLA
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/07/2023 Disapproved - NO FEE FSLADISH
Note: 06/07/23 UPON WALKING PROPERTY FOR FIELD SURVEY. THERE ARE WASHOUTS IN SOD ON LEFT SIDE PROPERTY LINE THAT HAVE DEPOSITED DIRT/SILT ALONG REAR LEFT PROPERTY LINE. THIS AREA WILL NEED TO BE ADDRESSED TO ENSURE POSITIVE REAR TO FRONT DRAINAGE WHILE NOT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. PLEASE SEE PHOTO FOR REFERENCE ____________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE A FINAL SURVEY INSPECTION DONE BEFORE THIS INSPECTION
FINAL SURVEY (OFFICE USE ONLY) 06/07/2023 APPROVED - AS NOTED FSLADISH
Note: 06/07/23 NUMBERS SHOW POSITIVE REAR TO FRONT NUMBERS. WILL COMPARE WHILE WALKING PROPERTY FOR FIELD SURVEY. _____________________________________________________________________________________________________________________ 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTED WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 06/06/2023 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE A FINAL SURVEY INSPECTION DONE BEFORE THIS INSPECTION
U-CROSS CONNECTION 05/26/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PROJECT STATUS 05/25/2023 APPROVED GBERTOLA
Note: 05/25/23=BUILDER NEED TO ADD A SWALE OR A BERM TO HOLD THE WATER IMPACTING THE HOME OWNER ON THE LEFT SIDE 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTING WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA
ROW- PROJECT STATUS 05/24/2023 APPROVED - AS NOTED GBERTOLA
Note: 5/24/23=NOTE TO THE INSPECTOR= PLEASE MAKE SURE WHEN YOU CHECK FINAL SURVEY THE HOME OWNER ON THE LEFT SIDE IS NOT GETTING IMPACTED WITH THE STORM WATER. I THINK HE IS GETTING IMPACTED WITH THE STORMWATER, IN THE BACK YARD AND ON THE LEFT SIDE Bare earth area along the PROPERTY line in the back needs sod. PER GBERTOLA
ELECTRIC - EARLY POWER 05/03/2023 APPROVED JSTEWART
GRAVITY SEWER TEST 03/23/2023 APPROVED MGIBSON
U - SEWER TIE IN 03/23/2023 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 02/02/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
INSULATION 02/02/2023 APPROVED JWALKER
Note: 1/30/2023 - PREVIOUS INSPECTION NOTES 1/30/23 Below listed corrections from the all rough inspection have not been made. Inspector Notes from Inspection 2420 1. The 2" PVC plumbing vent is to be sloped downward towards the drain and supported 4' o.c. 2. Microwave duct, Seal completely. 3. The two HVAC flex duct sitting on the microwave duct need to be lifted and supported. Check above listed at insulation inspection.
INSULATION 01/30/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1/30/23 Below listed corrections from the all rough inspection have not been made. Inspector Notes from Inspection 2420 1. The 2" PVC plumbing vent is to be sloped downward towards the drain and supported 4' o.c. 2. Microwave duct, Seal completely. 3. The two HVAC flex duct sitting on the microwave duct need to be lifted and supported. Check above listed at insulation inspection.
PEP TANK INSTALLATION REQUEST 01/30/2023 APPROVED TSCHWEERS
ALL ROUGH 01/18/2023 APPROVED - AS NOTED JWALKER
Note: 1. The 2" PVC plumbing vent is to be sloped downward towards the drain and supported 4' o.c. 2. Microwave duct, Seal completely. 3. The two HVAC flex duct sitting on the microwave duct need to be lifted and supported. Check above listed at insulation inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/13/2023 APPROVED - AS NOTED JWALKER
Note: Install missing HG10A anchors at front entry gabel cross bracing. Check at All Rough inspection.
LATH/BRICK/ WATER BARRIER 01/12/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/09/2023 Disapproved -FEE REQUIRED JWALKER
Note: Trusses A07 2 of 5 engineering has been cut out. Page S-2 of the plan set is missing. Note to contractor ensure HG10a anchors are installed at gable cross bracing. 1/9/23 1. Truss engineering is to be 2x4 or greater 1x6 used to correct the cut out engineering. 2. Gable end cross bracing HG10A anchors have not been installed. 3. Gable end over front entry cross bracing is to be 4' o.c. install missing cross bracing and truss blocking.
ROOF VALLEY & METAL 01/09/2023 APPROVED JWALKER
Note: New inspection due to canceled inspection 1/4/2023 - PREVIOUS INSPECTION NOTES Roof valley metal cannot be passed untill roof sheating noted at roof bracing inspection is corrected. Sheating has been corrected.
ROOF VALLEY & METAL 01/06/2023 CANCELLED BY APPLICANT WEB
Note: 1/4/2023 - PREVIOUS INSPECTION NOTES Roof valley metal cannot be passed untill roof sheating noted at roof bracing inspection is corrected.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/06/2023 CANCELLED BY APPLICANT WEB
Note: 1/4/2023 - PREVIOUS INSPECTION NOTES Truss A07 rear porch is missing a hold down anchor. Truss A04 front of building Strap is not nailed. Trusses A07 2 of 5 engineering has been cut out. Page S-2 of the plan set is missing. Note to contractor ensure HG10a anchors are installed at gable cross bracing. Roof sheating at gable over front entry not nailed. Circled drawing for locations.
ROOF VALLEY & METAL 01/04/2023 Disapproved - NO FEE JWALKER
Note: Roof valley metal cannot be passed untill roof sheating noted at roof bracing inspection is corrected.
WALL SHEATHING 01/04/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/04/2023 Disapproved - NO FEE JWALKER
Note: Truss A07 rear porch is missing a hold down anchor. Truss A04 front of building Strap is not nailed. Trusses A07 2 of 5 engineering has been cut out. Page S-2 of the plan set is missing. Note to contractor ensure HG10a anchors are installed at gable cross bracing. Roof sheating at gable over front entry not nailed. Circled drawing for locations.
ELECTRIC-TUG 01/04/2023 APPROVED JMUNSON
FOUND SURVEY APPROVED (OFFICE) 11/18/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/16/2022 APPROVED LMILLER
MONOLITHIC SLAB 11/02/2022 APPROVED JWALKER
Note: 11/1/2022 - PREVIOUS INSPECTION NOTES 10/28/2022 - PREVIOUS INSPECTION NOTES Soil wash outs into the footings due to heavy rain.
MONOLITHIC SLAB 11/01/2022 CANCELLED BY APPLICANT JWALKER
Note: 10/28/2022 - PREVIOUS INSPECTION NOTES Soil wash outs into the footings due to heavy rain.
MONOLITHIC SLAB 10/28/2022 Disapproved - NO FEE JWALKER
Note: Soil wash outs into the footings due to heavy rain.
WATER METER INSTALLATION REQUEST 10/27/2022 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2022 APPROVED MGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 03/20/2023 03/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/18/2022 11/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/18/2022 11/18/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 08/04/2022 08/04/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/28/2022 07/28/2022
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Missing attachment
BLD COMPLETE 07/22/2022 07/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/22/2022 07/25/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/22/2022 07/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/22/2022 07/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/22/2022 07/27/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 07/22/2022 07/22/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from correct mechanical subcontractor
SW1 COMPLETE 07/22/2022 07/28/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 07/22/2022 07/27/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 07/22/2022 11/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/15/2023
REINSPECTION RESIDENTIAL ¤40.00 06/15/2023
REINSPECTION RESIDENTIAL ¤40.00 06/15/2023
SW ENG REINSPECTION 20 ¤20.00 06/15/2023
SW ENG REINSPECTION 20 ¤20.00 06/15/2023
SW ENG - REVIEW 20 ¤20.00 10/25/2022
SW ENG RES REVIEW 200 ¤200.00 10/25/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/25/2022
SEWER CREDIT (¤1,466.00) 10/25/2022
SEWER INSPECTION ¤25.00 10/25/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/25/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/25/2022
SITE PLAN 30 ¤30.00 10/25/2022
WATER- TURN ON ¤25.00 10/25/2022
ADJUSTMENT 50% (¤405.07) 10/25/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/25/2022
INSPECTION - RESIDENTIAL ¤607.75 10/25/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 10/25/2022
CONNECTION FEES ¤1,077.88 10/25/2022
CONTRACTOR CHANGE ¤40.00 10/25/2022
CONTRACTOR CHANGE ¤20.00 10/25/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/25/2022
IMPACT FEE FIRE ¤388.65 10/25/2022
IMPACT FEE PARKS ¤1,455.13 10/25/2022
IMPACT FEE SCHOOL ¤3,600.00 10/25/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/25/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/25/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/25/2022
SURCHARGE FS 533.721 ¤2.69 10/25/2022
SURCHARGE - FS 468.631 ¤4.04 10/25/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/25/2022
SW ENG INSPECTION 80 ¤80.00 10/25/2022
SW ENG PRE APRON ¤30.00 10/25/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,356.98