I want to search for...
Permit #2022071123
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7057-00090-0080 |
| Block: 00090 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 386-236-9610 |
| Location Address: 40 UTAH PL |
| Type: PO - POOL |
| Issue Date: 08/23/2022 |
| NOC: Unknown |
| Applicant name: SAMANTHA JESSICA ALEXANDER |
| Owner: RODRIGUEZ OMAR ANTONIO & WENDI HERBERT RODRIGUEZ H |
|
Address 40 UTAH PLACE PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤65,000.00 |
| Job Description: swimming pool & enclosure |
| Type: CN |
Contractor
AGUA POOLS AND SPA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3438 LONGLEAF ROAD , |
CPC1459907 (Exp: 08/31/2026) | 386-492-6910 |
Sub Contractors
DANIEL OSVALDO PRIOTTI
| Status | Location Address | State License Number | Phone |
| INACTIVE |
100B 8TH STREET HOLLY HILL, FL 32117 |
CGC1525324 (Exp: 08/31/2024) | 386-236-9610 |
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1410 RIDGEWOOD AVE HOLLY HILL, FL 32117 |
EC13011552 (Exp: 08/31/2026) | 386-236-9610 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 07/10/2023 | FINAL APPROVED | BTAYLOR |
| Note: 7/6/2023 - PREVIOUS INSPECTION NOTES 7-6-23 1. Alarms need to be in bodies of water. | |||
| POOL FINAL | 07/06/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 7-6-23 1. Alarms need to be in bodies of water. | |||
| ROW - FINAL INSPECTION | 07/05/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTIONS MADE AT THIS TIME At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------ 6/29/2023 - PREVIOUS INSPECTION NOTES SOD IN THE SWALE NEED TO DUG DOWN SO ALL SOD MATCH GRADE SO WATER DON'T GET HELD BACK -------------------------------------------------------------------------------------------------------------- 3/14/2023 - PREVIOUS INSPECTION NOTES ** 03/14/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/14/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION _____________________________________________________________________________________________________________________ 3/13/2023 - PREVIOUS INSPECTION NOTES ** 03/13/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/13/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION ______________________________________________________________________________________________________________________ 3/2/2023 - PREVIOUS INSPECTION NOTES ** 03/02/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/29/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 06/29/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: SOD IN THE SWALE NEED TO DUG DOWN SO ALL SOD MATCH GRADE SO WATER DON'T GET HELD BACK -------------------------------------------------------------------------------------------------------------- 3/14/2023 - PREVIOUS INSPECTION NOTES ** 03/14/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/14/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION _____________________________________________________________________________________________________________________ 3/13/2023 - PREVIOUS INSPECTION NOTES ** 03/13/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/13/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION ______________________________________________________________________________________________________________________ 3/2/2023 - PREVIOUS INSPECTION NOTES ** 03/02/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION | |||
| ROW - FINAL INSPECTION | 03/14/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/14/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/14/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION _____________________________________________________________________________________________________________________ 3/13/2023 - PREVIOUS INSPECTION NOTES ** 03/13/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/13/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION ______________________________________________________________________________________________________________________ 3/2/2023 - PREVIOUS INSPECTION NOTES ** 03/02/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION | |||
| ROW - FINAL INSPECTION | 03/13/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/13/23 BUILDER NEEDS TO READ NOTES AND CORRECT ACCORDINGLY. ** NO SEED AND STRAW IN ROW ** 03/13/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION ______________________________________________________________________________________________________________________ 3/2/2023 - PREVIOUS INSPECTION NOTES ** 03/02/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/02/2023 | APPROVED | EMADISON |
| Note: ** 03/02/23 THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION _________________________________________________________________________________________________________________________ 2/28/2023 - PREVIOUS INSPECTION NOTES ________________________________________________________________________________________________________________________ ** 02/28/23 INSPECTOR WILL NEED ACCESS TO THE REAR YARD THROUGH FENCE EITHER SOMEONE NEEDS TO BE HOME OR IF PERMISSION IS GRANTED BY HOMEOWNER BUILDER NEEDS TO LEAVE APPLICANT NOTE. | |||
| ROW - FINAL INSPECTION | 03/02/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/02/23 BEFORE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS MUST BE MADE ** THE ROW ON RIGHT SIDE OF PROPERTY WHERE ACCESS WITH EQUIPMENT TO PROJECT SITE NEEDS BAHIA SOD IS TO BE USED IN THE ROW AREA. TO BE REPAIRED TO MATCH EXISTING GRADE AND SODDED OUTLINED WITH PINK PAINT. ** ACCESS POINT ACROSS VACANT BEYOND ROW NEEDS TO BE **SEEDED AND STRAW PUT DOWN FOR EROSION CONTROL. ** RESIDENTS PROPERTY ALSO NEEDS REPAIR TO PREVENT EROSION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/28/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/28/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 02/28/23 INSPECTOR WILL NEED ACCESS TO THE REAR YARD THROUGH FENCE EITHER SOMEONE NEEDS TO BE HOME OR IF PERMISSION IS GRANTED BY HOMEOWNER BUILDER NEEDS TO LEAVE APPLICANT NOTE. | |||
| ELECTRIC AND ALARM | 12/08/2022 | APPROVED | KSANDOE |
| POOL DECK | 10/20/2022 | APPROVED | BTAYLOR |
| STEEL AND GROUND | 09/20/2022 | APPROVED | RSIMS |
| Note: 9/20/2022 - 7:15AM --- Cleaned out where washed in. Spoke to contractor on-site who informed me gunite was coming within 30 minutes. 9/19/2022 - PREVIOUS INSPECTION NOTES The weather has forced the wash in in mutilple areas. Workers on site trying to to get ahead of rain. We will schedule inspection for first thing AM. It will be done prior to 7:30. Hopefully weather will co-operate. | |||
| STEEL AND GROUND | 09/19/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: The weather has forced the wash in in mutilple areas. Workers on site trying to to get ahead of rain. We will schedule inspection for first thing AM. It will be done prior to 7:30. Hopefully weather will co-operate. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/04/2022 | 08/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/22/2022 | 07/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Please provide a completed City of Palm Coast Pool Safety Form. The Pool Safety Form can be download from our website at www.cityofpalmcoastgov.com. | |||
| ELEC | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/22/2022 | 07/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/23/2022 |
| SITE PLAN 30 | ¤30.00 | 08/23/2022 |
| ADJUSTMENT 50% | (¤127.50) | 08/23/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/23/2022 |
| INSPECTION- POOL | ¤160.00 | 08/23/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 08/23/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/23/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/23/2022 |
| SW ENG INSPECTION 40 | ¤40.00 | 08/23/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤301.50 |