Permit #2022071152

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1290
CONDITIONED SPACE: 2756 sqft
GARAGE: 513 sqft
OPENED PORCH (WITH ROOF) : 506 sqft
OPENED PORCH (WITH ROOF) : 80 sqft
Total Square Footage: 3855 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 255 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/01/2022
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: HESS SCOTT M & ALISON H&W

Address

43413 BLANTYRE CT

ASHBURN, VA 20147

Lot: 1290
Contracted Stated Job Value: ¤663,900.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
LEONARD E GASPARY
Status Location Address Phone Fax
INACTIVE

400 NORTH US HWY #1

ORMOND BEACH, FL 32174

(386)672-8494 (386)673-7856
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/28/2023 FINAL APPROVED AGAETANO
ROW - FINAL APRON (AFTER POUR) 11/16/2023 APPROVED EMADISON
Note:
ROW - STORMWATER FINAL 11/16/2023 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 11/15/2023 FINAL APPROVED DHANEY
U-CROSS CONNECTION 11/15/2023 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/13/2023 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 11/13/2023 APPROVED - AS NOTED EMADISON
Note: ** 11/13/23 BARK MULCH AND SCHRUBBERY WILL NEED TO BE REMOVED FROM THE DRAINAGE CONVEYANCES ON BOTH THE LEFT AND RIGHT REAR ALONG PROPERTY LINES AND REPLACED WITH SOD
ROW- PRE-APRON (PRE-POUR) 09/15/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/15/23 READY TO SET PAVERS _______________________________________________________________________________________________________________________ 9/7/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9271 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD ND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________________________ 9/1/2023 - PREVIOUS INSPECTION NOTES ** 09/01/23 BUILDER NEEDS TO PROVIDE THE REQUIRED RESIDENTIAL PAVER RESTRIANT DRIVEWAY DETAIL PLAN SO INSPECTOR KNOWS WHAT THEY ARE PROPOSING.
ROW- PRE-APRON (PRE-POUR) 09/07/2023 PARTIALLY APPROVED EMADISON
Note: Inspector Notes from Inspection 9271 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD ND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________________________ 9/1/2023 - PREVIOUS INSPECTION NOTES ** 09/01/23 BUILDER NEEDS TO PROVIDE THE REQUIRED RESIDENTIAL PAVER RESTRIANT DRIVEWAY DETAIL PLAN SO INSPECTOR KNOWS WHAT THEY ARE PROPOSING.
ROW- PAVER RESTRAINTS 09/07/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ___________________________________________________________________________________________________________________ 9/1/2023 - PREVIOUS INSPECTION NOTES ** 09/01/23 BUILDER NEEDS TO PROVIDE THE REQUIRED RESIDENTIAL PAVER RESTRIANT DRIVEWAY DETAIL PLAN SO INSPECTOR KNOWS WHAT THEY ARE PROPOSING.
ROW- PRE-APRON (PRE-POUR) 09/01/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/01/23 BUILDER NEEDS TO PROVIDE THE REQUIRED RESIDENTIAL PAVER RESTRIANT DRIVEWAY DETAIL PLAN SO INSPECTOR KNOWS WHAT THEY ARE PROPOSING. ________________________________________________________________________________________________________________________ 8/31/2023 - PREVIOUS INSPECTION NOTES 8/31/23DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/29/2023 - PREVIOUS INSPECTION NOTES DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023.
ROW- PAVER RESTRAINTS 09/01/2023 Disapproved - NO FEE EMADISON
Note: ** 09/01/23 BUILDER NEEDS TO PROVIDE THE REQUIRED RESIDENTIAL PAVER RESTRIANT DRIVEWAY DETAIL PLAN SO INSPECTOR KNOWS WHAT THEY ARE PROPOSING.
ROW- PRE-APRON (PRE-POUR) 08/31/2023 Disapproved - NO FEE GBERTOLA
Note: 8/31/23DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/29/2023 - PREVIOUS INSPECTION NOTES DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023.
ROW- PRE-APRON (PRE-POUR) 08/30/2023 Disapproved - NO FEE GBERTOLA
Note: DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023.
GRAVITY SEWER TEST 08/24/2023 APPROVED MGIBSON
U - SEWER TIE IN 08/24/2023 APPROVED MGIBSON
ELECTRIC - EARLY POWER 08/15/2023 APPROVED AGAETANO
Note: 8/14/2023 - PREVIOUS INSPECTION NOTES 08-14-2023 Ceiling lights not safe off.
ELECTRIC - EARLY POWER 08/14/2023 Disapproved - NO FEE AGAETANO
Note: 08-14-2023 Ceiling lights not safe off.
LATH/BRICK/ WATER BARRIER 07/05/2023 APPROVED TSTAUFFACHER
INSULATION 06/26/2023 APPROVED AGAETANO
ALL ROUGH 06/20/2023 APPROVED TSTAUFFACHER
Note: Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 06-14-2023 S04 member missed, check at next inspection. 06-15-2023 A05 Truss. Please close the gap between both trusses.
ELECTRIC-TUG 06/16/2023 APPROVED AGAETANO
WALL SHEATHING 06/15/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2460 06-14-2023 S04 member missed, check at next inspection. 06-15-2023 A05 Truss. Please close the gap between both trusses.
ROOF VALLEY & METAL 06/15/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2460 06-14-2023 S04 member missed, check at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/14/2023 APPROVED - AS NOTED AGAETANO
Note: 06-14-2023 S04 member missed, check at next inspection.
FOOTER 03/09/2023 APPROVED AGAETANO
TIE BEAM / LINTEL 12/02/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 11/03/2022 APPROVED TBAKER
MONOLITHIC SLAB 10/24/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 10/13/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/09/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/12/2023 09/12/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/05/2023 09/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 09/05/2023 09/12/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM there is no new site plan in the system
MECH COMPLETE 07/12/2023 07/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
GAS COMPLETE 07/12/2023 07/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 06/12/2023 06/12/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT GAS SUBCONTRACTOR
BLD COMPLETE 02/16/2023 02/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/01/2022 12/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/03/2022 11/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/03/2022 11/03/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 08/26/2022 08/26/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 08/24/2022 08/24/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 08/24/2022 08/25/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENT: Elevation plan: Rear doors will also need banding around them as they face the Golf Course as per LDC 13.03.03.B.3.
SW1 COMPLETE 08/24/2022 08/31/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
URB COMPLETE 07/29/2022 07/29/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
MECH HOLD 07/27/2022 07/27/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Square footage on Energy calcs and heatload do not match the house plans. (Second Request)
ELEC COMPLETE 07/27/2022 07/27/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 HOLD 07/27/2022 08/03/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE LEFT PROPERTY LINE A COMMON SWALE
ZON HOLD 07/27/2022 07/29/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: Shrubs should be of medium screening min of 3 gallons in the rear facing the Golf course Elevation plan: Doors will also need banding around them as they face the Golf Course
BLD COMPLETE 07/27/2022 07/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
LOCATE COMPLETE 07/27/2022 07/27/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
BLD HOLD 07/22/2022 07/27/2022
Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM
CUSVC COMPLETE 07/22/2022 07/25/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 07/22/2022 07/25/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs do not match the square footage of the house.
ENGIN1 COMPLETE 07/22/2022 07/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE HOLD 07/22/2022 07/27/2022
Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM
MECH HOLD 07/22/2022 07/25/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Square footage on Energy calcs and heatload do not match the house plans
SW1 HOLD 07/22/2022 07/27/2022
Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM
ZON HOLD 07/22/2022 07/27/2022
Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 11/22/2023
CONTRACTOR CHANGE ¤20.00 11/22/2023
CONTRACTOR CHANGE ¤20.00 11/22/2023
SW ENG REINSPECTION 30 ¤30.00 11/22/2023
PLAN REVIEW - REVISION ¤32.50 11/22/2023
PLAN REVIEW - REVISION ¤32.50 11/22/2023
CONNECTION FEES ¤25.00 09/01/2022
SW ENG - REVIEW 20 ¤20.00 09/01/2022
SW ENG RES REVIEW 200 ¤200.00 09/01/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 09/01/2022
SEWER INSPECTION ¤25.00 09/01/2022
SITE PLAN 30 ¤30.00 09/01/2022
WATER-METER ¤467.09 09/01/2022
ADJUSTMENT 50% (¤1,186.96) 09/01/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/01/2022
INSPECTION - RESIDENTIAL ¤1,826.00 09/01/2022
PLAN REVIEW - RESIDENTIAL ¤517.92 09/01/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 09/01/2022
IMPACT FEE FIRE ¤388.65 09/01/2022
IMPACT FEE PARKS ¤1,455.13 09/01/2022
IMPACT FEE SCHOOL ¤3,600.00 09/01/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 09/01/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 09/01/2022
SURCHARGE FS 533.721 ¤7.17 09/01/2022
SURCHARGE - FS 468.631 ¤10.76 09/01/2022
SW ENG - FOUNDATION SURVEY ¤20.00 09/01/2022
SW ENG INSPECTION 80 ¤80.00 09/01/2022
SW ENG PRE APRON ¤30.00 09/01/2022
Fees Total Due: ¤0.00 Total Paid: ¤10,772.73