I want to search for...
Permit #2022071254
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00190-0340 |
| Total Square Footage: 3864 sqft |
| Block: 00190 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 386-682-1857 |
| Location Address: 15 FAIRHILL LN |
| Type: RF - REROOF |
| Issue Date: 07/27/2022 |
| NOC: RECORDED |
| Applicant name: JUSTIN COLTHARP |
| Owner: SANTOS ARMINDO & MARIA L |
|
Address 15 FAIRHILL LN PALM COAST, FL 32137 |
| Lot: 0340 |
| Contracted Stated Job Value: ¤22,200.00 |
| Job Description: Reroof / Tear-off Tile off, Shingle on-SFR |
| Type: CN |
Contractor
PINNACLE ROOFING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
199 EMPORIA ROAD , |
CCC1332542 (Exp: 08/31/2026) | 386-631-5566 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 09/08/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2468 THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. 1. Please submit a revision for the bottom approximately 2'underlayment at the eve and overhang areas. 4" wide strips submitted and Summit underlayment installed on the remaining roof. 2. Permit and Roofing Worksheet not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 08-25-2022 1. No shingles installed on roof. Inspector indicated to superintendent yesterday that contractor can install up to 25% of shingles. 2. Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips submitted. 08-29-2022 - Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips self adhering submitted. Prior to final. Contractor can proceed at own risk. 09-08-2022 - Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips self adhering submitted. Prior to final. | |||
| ROOF FINAL | 09/08/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2468 THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. 1. Please submit a revision for the bottom approximately 2'underlayment at the eve and overhang areas. 4" wide strips submitted and Summit underlayment installed on the remaining roof. 2. Permit and Roofing Worksheet not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 08-25-2022 1. No shingles installed on roof. Inspector indicated to superintendent yesterday that contractor can install up to 25% of shingles. 2. Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips submitted. 08-29-2022 - Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips self adhering submitted. Prior to final. Contractor can proceed at own risk. 09-08-2022 - Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips self adhering submitted. Prior to final. | |||
| ROOF IN PROGRESS- MIDROOF | 08/29/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. 1. Please submit a revision for the bottom approximately 2'underlayment at the eve and overhang areas. 4" wide strips submitted and Summit underlayment installed on the remaining roof. 2. Permit and Roofing Worksheet not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 08-25-2022 1. No shingles installed on roof. Inspector indicated to superintendent yesterday that contractor can install up to 25% of shingles. 2. Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips submitted. 08-29-2022 - Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips self adhering submitted. Prior to final. Contractor can proceed at oun risk. | |||
| ROOF IN PROGRESS- MIDROOF | 08/25/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Contractor not ready. 1. Please submit a revision for the bottom approximately 2'underlayment at the eve and overhang areas. 4" wide strips submitted and Summit underlayment installed on the remaining roof. 2. Permit and Roofing Worksheet not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 08-25-2022 1. No shingles installed on roof. Inspector indicated to superintendent yesterday that contractor can install up to 25% of shingles. 2. Please submit a revision to the building department for the underlayment used. Peel and stick at the bottom with two layers of synthetic installed. 4" wide strips submitted. | |||
| ROOF IN PROGRESS- MIDROOF | 08/24/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 08-24-2022 Contractor not ready. 1. Please submit a revision for the bottom approximately 2'underlayment at the eve and overhang areas. 4" wide strips submitted and Summit underlayment installed on the remaining roof. Revision can be submitted prior to final. 2. Permit and Roofing Worksheet not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. | |||
| ROOF AFFIDAVIT | 08/23/2022 | APPROVED | STHOMAS |
| ROOF IN PROGRESS- MIDROOF | 08/19/2022 | CANCELLED BY APPLICANT | WEB |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/25/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/24/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/27/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/27/2022 |
| INSPECTION - RESIDENTIAL | ¤63.25 | 07/27/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤177.25 |