I want to search for...

Permit #2022071278

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00070-0210
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00070
Subdivision: 0 -
Job Phone: 631-929-5500
Location Address: 47 SENTINEL TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/27/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: SEASMOKE PROPERTIES FLORIDA LLC

Address

STE 210

WEST PALM BEACH, FL 33401

Address

515 N FLAGLER DR

WEST PALM BEACH, FL 33401

Lot: 0210
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/08/2023 FINAL APPROVED BTAYLOR
ROW - STORMWATER FINAL 06/07/2023 FINAL APPROVED PFLANAGAN
Note: ALL CORRECTIONS MADE ---------------------------------------------------------------------------------- 6/6/2023 - PREVIOUS INSPECTION NOTES Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain.
U -UTILITY RESIDENTIAL FINAL 06/06/2023 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 06/06/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain.
ROW - FINAL APRON (AFTER POUR) 05/26/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/26/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 05/26/2023 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 05/02/2023 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 1:45 PM
ROW- PRE-APRON (PRE-POUR) 04/25/2023 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY. -------------------------------------------------------------------------------------------- 4/20/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE DIRT ON THE FORMS SO CONCRETE STAYS IN POURING AREA 2) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY.
ROW- PRE-APRON (PRE-POUR) 04/20/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE DIRT ON THE FORMS SO CONCRETE STAYS IN POURING AREA 2) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY.
U - SEWER TIE IN 03/31/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 03/31/2023 APPROVED MGIBSON
INSULATION 01/23/2023 APPROVED BTAYLOR
Note: 1/20/2023 - PREVIOUS INSPECTION NOTES
INSULATION 01/20/2023 CANCELLED BY APPLICANT BTAYLOR
PEP TANK INSTALLATION REQUEST 01/20/2023 APPROVED - AS NOTED TSCHWEERS
Note: 1/20/2023 Gravity Sewer
U-CROSS CONNECTION 01/17/2023 APPROVED DHANEY
ALL ROUGH 01/17/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 01/12/2023 APPROVED BTAYLOR
ELECTRIC-TUG 12/15/2022 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/15/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/14/2022 APPROVED BTAYLOR
Note: 12/12/2022 - PREVIOUS INSPECTION NOTES 12-12-22 1. Over framing not nailed off. 2. Double bucket not nailed off. 3. Gables not braced per detail.
WALL SHEATHING 12/12/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/12/2022 Disapproved - NO FEE BTAYLOR
Note: 12-12-22 1. Over framing not nailed off. 2. Double bucket not nailed off. 3. Gables not braced per detail. 4. MGT not nailed off.
FOUND SURVEY APPROVED (OFFICE) 11/22/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/17/2022 APPROVED BTAYLOR
MONOLITHIC SLAB 11/02/2022 APPROVED BTAYLOR
Note: 11/1/2022 - PREVIOUS INSPECTION NOTES 11-1-22 1. Need to clean dirt from off rebar in footers. 2. Rebar in footers on right side can't be laying on pipes.
MONOLITHIC SLAB 11/01/2022 Disapproved - NO FEE BTAYLOR
Note: 11-1-22 1. Need to clean dirt from off rebar in footers. 2. Rebar in footers on right side can't be laying on pipes.
PLUMBING 1ST ROUGH UNDERGROUND 10/28/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/28/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/06/2023 06/06/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 05/23/2023 05/24/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/22/2022 11/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/22/2022 11/22/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 09/02/2022 09/13/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/02/2022 09/06/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ENGIN1 COMPLETE 09/02/2022 09/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/02/2022 09/02/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/04/2022 08/04/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 08/04/2022 08/11/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE A COMMON SWALE ON BOTH PROPERTY LINES
ENGIN1 COMPLETE 08/04/2022 08/04/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/26/2022 07/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/26/2022 07/27/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/26/2022 07/26/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/26/2022 07/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/26/2022 08/01/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/26/2022 07/27/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/26/2022 08/02/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN IS REJECTED NEED TO RESUBMIT A NEW ONE
ZON HOLD 07/26/2022 07/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood map number incorrect on site plan/survey Need one additional tree for this lot size
SWALE COMPLETE 07/26/2022 11/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 06/08/2023
SW ENG REINSPECTION 20 ¤20.00 06/08/2023
SW ENG REINSPECTION 30 ¤30.00 06/08/2023
PLAN REVIEW - REVISION ¤32.50 06/08/2023
PLAN REVIEW - REVISION ¤32.50 06/08/2023
CONNECTION FEES ¤1,077.88 10/27/2022
WATER- TURN ON ¤25.00 10/27/2022
ADJUSTMENT 50% (¤405.07) 10/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/27/2022
INSPECTION - RESIDENTIAL ¤607.75 10/27/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 10/27/2022
SW ENG - REVIEW 20 ¤20.00 10/27/2022
SW ENG RES REVIEW 200 ¤200.00 10/27/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/27/2022
SEWER CREDIT (¤850.00) 10/27/2022
SEWER INSPECTION ¤25.00 10/27/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/27/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/27/2022
SITE PLAN 30 ¤30.00 10/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/27/2022
IMPACT FEE FIRE ¤388.65 10/27/2022
IMPACT FEE PARKS ¤1,455.13 10/27/2022
IMPACT FEE SCHOOL ¤3,600.00 10/27/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/27/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/27/2022
SURCHARGE FS 533.721 ¤2.69 10/27/2022
SURCHARGE - FS 468.631 ¤4.04 10/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/27/2022
SW ENG INSPECTION 80 ¤80.00 10/27/2022
SW ENG PRE APRON ¤30.00 10/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,895.48