I want to search for...
Permit #2022071283
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00070-0050 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00070 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 631-929-5500 |
| Location Address: 16 RAEMOOR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/25/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: SEASMOKE PROPERTIES FLORIDA LLC |
|
Address 27 WILDWOOD ROAD SAG HARBOR, NY 11963 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/15/2023 | FINAL APPROVED | JWALKER |
| ROW - STORMWATER FINAL | 06/13/2023 | FINAL APPROVED | PFLANAGAN |
| Note: ALL CORRECTIONS MADE -------------------------------------------------------------------------------- 6/6/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO FIX ALL AREAS LISTED BELOW FROM THE INSPECTON DATED 6/1/23 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULVERT PIPE 3) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND YOUR LOT ---------------------------------------------------------------------------------------------------- 6/1/23= LEFT SIDE ACROSS FROM THE DIRECT TV ANTENNA IS A HIGH SPOT IN THE BACK YARD BY THE END OF THE PROPERTY LINE IS A LOW SPOT The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ALL AREAS ARE (MARKED WITH PINK PAINT) | |||
| BLD - BUILDING FINAL | 06/12/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 06/12/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 6/6/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO FIX ALL AREAS LISTED BELOW FROM THE INSPECTON DATED 6/1/23 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULVERT PIPE 3) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND YOUR LOT ---------------------------------------------------------------------------------------------------- 6/1/23= LEFT SIDE ACROSS FROM THE DIRECT TV ANTENNA IS A HIGH SPOT IN THE BACK YARD BY THE END OF THE PROPERTY LINE IS A LOW SPOT The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ALL AREAS ARE (MARKED WITH PINK PAINT) | |||
| U -UTILITY RESIDENTIAL FINAL | 06/06/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 06/06/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO FIX ALL AREAS LISTED BELOW FROM THE INSPECTON DATED 6/1/23 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULVERT PIPE 3) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND YOUR LOT ---------------------------------------------------------------------------------------------------- 6/1/23= LEFT SIDE ACROSS FROM THE DIRECT TV ANTENNA IS A HIGH SPOT IN THE BACK YARD BY THE END OF THE PROPERTY LINE IS A LOW SPOT The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ALL AREAS ARE (MARKED WITH PINK PAINT) | |||
| ROW - FINAL APRON (AFTER POUR) | 06/01/2023 | APPROVED | GBERTOLA |
| Note: 6/1/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/01/2023 | APPROVED | GBERTOLA |
| Note: 6/1/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/01/2023 | APPROVED | GBERTOLA |
| Note: 6/1/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 05/26/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ELECTRIC - EARLY POWER | 05/05/2023 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 03/23/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 03/23/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 02/01/2023 | APPROVED | EMADISON |
| Note: ** 02/01/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTIONS ** ** 02/01/23 INSPECTOR UNABLE TO ACCESS SITE DUE INSTALLATION OF PEP-TANK INSPECTOR WILL RESCHEDULE THIS PRE-POUR INSPECTION FOR 02/02/23. | |||
| INSULATION | 01/30/2023 | APPROVED | JWALKER |
| PEP TANK INSTALLATION REQUEST | 01/30/2023 | APPROVED | TSCHWEERS |
| ALL ROUGH | 01/20/2023 | APPROVED | JWALKER |
| Note: 1/18/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 1/6/2023s. 6. V trusses above garage area have not been strapped down to trusses below. 1/18/23 1. Above listed correction has not been made. 2. 2" PVC plumbing vent is to slope down to drain and be supported minimum of 4' o.c. 3. The 14" flex at the supply plenum is not connected / sealed. The duct is also kinked and compressed where in makes the two turns above garage wall area. 4. Remove the flex duct off of the microwave exhaust duct. 2" minimum clearance. 5. The 12 flex in the master bath closet needs to be lifted off the ceiling to allow for proper blowin insulation depth. 6. Install a nail plate at the microwave exhaust duct. 7. Please have a approved duct drawing onsite that matches listed subcontractor. | |||
| LATH/BRICK/ WATER BARRIER | 01/18/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 1/6/2023s. 2. Front entry gable install cross bracing at 48" o.c. 4. Truss A-16 missing one of tow engineering boards. I beam type install. 5. HG10A anchore at front gable end for the bottom of the cross bracing have not been installed. 6. V trusses above garage area have not been strapped down to trusses below. | |||
| ALL ROUGH | 01/18/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Inspector Notes from Inspection 2460 1/6/2023s. 6. V trusses above garage area have not been strapped down to trusses below. 1/18/23 1. Above listed correction has not been made. 2. 2" PVC plumbing vent is to slope down to drain and be supported minimum of 4' o.c. 3. The 14" flex at the supply plenum is not connected / sealed. The duct is also kinked and compressed where in makes the two turns above garage wall area. 4. Remove the flex duct off of the microwave exhaust duct. 2" minimum clearance. 5. The 12 flex in the master bath closet needs to be lifted off the ceiling to allow for proper blowin insulation depth. 6. Install a nail plate at the microwave exhaust duct. 7. Please have a approved duct drawing onsite that matches listed subcontractor. | |||
| ROOF VALLEY & METAL | 01/13/2023 | APPROVED | JWALKER |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES Shingles have been installed. | |||
| WALL SHEATHING | 01/13/2023 | APPROVED | JWALKER |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES Metal lath has been installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/13/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1/6/2023s. 2. Front entry gable install cross bracing at 48" o.c. 4. Truss A-16 missing one of tow engineering boards. I beam type install. 5. HG10A anchore at front gable end for the bottom of the cross bracing have not been installed. 6. V trusses above garage area have not been strapped down to trusses below. | |||
| ROOF VALLEY & METAL | 01/06/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Shingles have been installed. 1/6/23 Copied note from roof brace inspection: Superintendent showed up on site during brace tie down inspection, However it was after roof valley metal was failed due to shingle install. He tore up 4 areas exposing underlayment. A fee was issued. Reinspection can be approved. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Cross bracing and blocking at front gables have been done with northern spruce. SYP or SPF must be uses. 2. Front entry gable install cross at 48" o.c. 3. Nail hold down strap at truss BO2A right side cmu in garage. 4. Truss A-16 missing one of tow engineering boards. I beam type install. Superintendent showed up on site during brace tie down inspection, However it was after roof valley metal was failed due to shingle install. He tore up 4 areas exposing underlayment. A fee was issued. Reinspection can be approved. | |||
| WALL SHEATHING | 01/06/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Metal lath has been installed. | |||
| ELECTRIC-TUG | 01/06/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 01/04/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/15/2022 | APPROVED | RMARTIN |
| MONOLITHIC SLAB | 11/04/2022 | APPROVED | RSIMS |
| Note: 11/3/2022 - PREVIOUS INSPECTION NOTES 11/2/2022 - PREVIOUS INSPECTION NOTES Slab depth is to be a minimum of 3 1/2" center and right center of the slab are shallow. Dig out excess soil and tamp. Multiple areas of soil collapase into the footings under the plastic. Rebar in the left side footing not separated. 11/3/22 Above listed corrections have not been made. | |||
| MONOLITHIC SLAB | 11/03/2022 | Disapproved - NO FEE | JWALKER |
| Note: 11/2/2022 - PREVIOUS INSPECTION NOTES Slab depth is to be a minimum of 3 1/2" center and right center of the slab are shallow. Dig out excess soil and tamp. Multiple areas of soil collapase into the footings under the plastic. Rebar in the left side footing not separated. 11/3/22 Above listed corrections have not been made. | |||
| MONOLITHIC SLAB | 11/02/2022 | Disapproved - NO FEE | JWALKER |
| Note: Slab depth is to be a minimum of 3 1/2" center and right center of the slab are shallow. Dig out excess soil and tamp. Multiple areas of soil collapase into the footings under the plastic. Rebar in the left side footing not separated. | |||
| MONOLITHIC SLAB | 11/01/2022 | CANCELLED BY APPLICANT | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/27/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/27/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/20/2023 | 03/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/04/2023 | 01/04/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/04/2023 | 01/04/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/15/2022 | 12/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/04/2022 | 08/04/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/04/2022 | 08/04/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PERMIT APPLICATION MISSING NOTARY AT BOTTOM | |||
| BADMIN | INFORMATION | 08/04/2022 | 08/04/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The address is missing from the application - job location is blank. | |||
| BLD | COMPLETE | 07/26/2022 | 07/29/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/26/2022 | 07/27/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/26/2022 | 07/26/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/26/2022 | 07/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/26/2022 | 08/01/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/26/2022 | 07/27/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/26/2022 | 08/02/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/26/2022 | 07/28/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Wrong address chosen in the portal. All documents are for 16 Raemoor Dr | |||
| SWALE | COMPLETE | 07/26/2022 | 11/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/15/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/15/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/25/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/25/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/25/2022 |
| SEWER CREDIT | (¤1,342.00) | 10/25/2022 |
| SEWER INSPECTION | ¤25.00 | 10/25/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/25/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/25/2022 |
| SITE PLAN 30 | ¤30.00 | 10/25/2022 |
| WATER- TURN ON | ¤25.00 | 10/25/2022 |
| ADJUSTMENT 50% | (¤405.07) | 10/25/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/25/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 10/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 10/25/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/25/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/25/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/25/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/25/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/25/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/25/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/25/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/25/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/25/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 10/25/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 10/25/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/25/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/25/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,533.48 |