Permit #2022071303

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00800-0040
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
Total Square Footage: 2459 sqft
Block: 00800
Subdivision: -
Job Phone: 631-929-5500
Location Address: 18 SEAGOING TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/28/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: WICKAPOGUE RE DEVELOPMENT LLC

Address

STE 110

GREENWOOD VILLAGE, CO 80111

Address

5460 S QUEBEC ST

GREENWOOD VILLAGE, CO 80111

Lot: 0040
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/02/2023 FINAL APPROVED BTAYLOR
Note: 7/28/2023 - PREVIOUS INSPECTION NOTES 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items.
ROW - STORMWATER FINAL 08/02/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 07/28/2023 FINAL APPROVED JHARDING
BLD - BUILDING FINAL 07/28/2023 CANCELLED BY APPLICANT RSIMS
Note: 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items.
ROW - FINAL APRON (AFTER POUR) 07/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/25/2023 APPROVED PFLANAGAN
Note: NEED TO REMOVE CRAPE MERTAL ON RIGHT SIDE OUT OF DRAINAGE PATTERN
ELECTRIC - EARLY POWER 06/16/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 2-28-23 1.Emailed FPL at 1:56. 6-16-23 1. Emailed FPL at 2:38.
ROW- PRE-APRON (PRE-POUR) 06/08/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIUM OF 3000PSI WITH FIBER OR NEED TO HAVE METAL MESH IN POURING AREA. ---------------------------------------------------------------------------------------------- 6/6/2023 - PREVIOUS INSPECTION NOTES Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5") on three inches (3") of limerock or shell base. Also need to have (4") above the right of way.
ROW- PRE-APRON (PRE-POUR) 06/06/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5") on three inches (3") of limerock or shell base. Also need to have (4") above the right of way.
U-CROSS CONNECTION 05/17/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U - SEWER TIE IN 05/17/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 05/17/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 05/01/2023 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 03/30/2023 APPROVED BTAYLOR
INSULATION 03/27/2023 APPROVED BTAYLOR
ALL ROUGH 03/24/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/13/2023 APPROVED BTAYLOR
Note: New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site. 3-6-23 1. Not ready.
ROOF VALLEY & METAL 03/13/2023 APPROVED BTAYLOR
Note: New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2023 CANCELLED BY APPLICANT WEB
Note: 3/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site. 3-6-23 1. Not ready.
ROOF VALLEY & METAL 03/08/2023 CANCELLED BY APPLICANT WEB
Note: 3/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site.
ROOF VALLEY & METAL 03/06/2023 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site.
WALL SHEATHING 03/06/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/06/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: Inspector Notes from Inspection 2340 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site. 3-6-23 1. Not ready.
ELECTRIC-TUG 02/28/2023 APPROVED - AS NOTED BTAYLOR
Note: 2-28-23 1.Emailed FPL at 1:56.
FOUND SURVEY APPROVED (OFFICE) 02/21/2023 APPROVED TBAKER
TIE BEAM / LINTEL 02/16/2023 APPROVED - AS NOTED BTAYLOR
Note: 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans. 2-16-23 1. No plans on site.
TIE BEAM / LINTEL 02/14/2023 Disapproved - NO FEE BTAYLOR
Note: 2-14-23 1. Rebar dowel not tied. 2. Front right window sill not installed properly. Circled on plans.
MONOLITHIC SLAB 02/03/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 01/31/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/25/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
MECH COMPLETE 02/27/2023 02/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/21/2023 02/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/21/2023 02/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 08/15/2022 08/15/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/15/2022 08/22/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/15/2022 08/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/15/2022 08/15/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLENV COMPLETE 07/28/2022 08/12/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 8/12/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot.
BLD COMPLETE 07/26/2022 07/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/26/2022 07/27/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/26/2022 07/27/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/26/2022 07/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/26/2022 08/01/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 07/26/2022 07/27/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 HOLD 07/26/2022 08/02/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures FFE of subject property are to be a minimum of 12” above the crown of the road
ZON COMPLETE 07/26/2022 07/29/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 07/26/2022 11/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 08/02/2023
REINSPECTION RESIDENTIAL ¤40.00 08/02/2023
CONTRACTOR CHANGE ¤20.00 08/02/2023
SW ENG REINSPECTION 30 ¤30.00 08/02/2023
SEWER CAPITAL FACILITY ¤405.06 12/29/2022
WATER CAPITAL FACILITY FEE ¤297.38 12/29/2022
CONNECTION FEES ¤88.38 12/29/2022
CONNECTION FEES ¤1,077.88 12/28/2022
CONTRACTOR CHANGE ¤40.00 12/28/2022
WATER- TURN ON ¤25.00 12/28/2022
ADJUSTMENT 50% (¤405.07) 12/28/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/28/2022
INSPECTION - RESIDENTIAL ¤607.75 12/28/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 12/28/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 12/28/2022
IMPACT FEE FIRE ¤388.65 12/28/2022
IMPACT FEE PARKS ¤1,455.13 12/28/2022
IMPACT FEE SCHOOL ¤3,600.00 12/28/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 12/28/2022
WATER -IRRIGATION INSPECTION ¤25.00 12/28/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 12/28/2022
SURCHARGE FS 533.721 ¤2.69 12/28/2022
SURCHARGE - FS 468.631 ¤4.04 12/28/2022
SW ENG - FOUNDATION SURVEY ¤20.00 12/28/2022
SW ENG INSPECTION 80 ¤80.00 12/28/2022
SW ENG PRE APRON ¤30.00 12/28/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 12/28/2022
WORK WITHOUT PERMIT ¤692.23 12/28/2022
SITE PLAN 30 ¤30.00 12/28/2022
SW ENG - REVIEW 20 ¤20.00 12/28/2022
SW ENG RES REVIEW 200 ¤200.00 12/28/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 12/28/2022
SEWER CREDIT (¤1,342.00) 12/28/2022
SEWER INSPECTION ¤25.00 12/28/2022
SEWER CAPITAL FACILITY ¤4,939.76 12/28/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,914.03