Permit #2022071489

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7031-00610-0030
Block: 00610
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 925-752-0277
Location Address: 6 RIVERVIEW PL
Type: SLRE - SOLAR ELECTRIC - PHOTOVOLTAIC
Issue Date: 07/29/2022
NOC: RECORDED
Applicant name: SCOTT ALAN PORTIER
Owner: JENKINS NAOMI & WILLIE LEE W&H

Address

6 RIVERVIEW PLACE

PALM COAST, FL 32164

Lot: 0030
Contracted Stated Job Value: ¤75,324.00
Job Description: PV Solar Installation
Type: CN

Contractor

TITAN SOLAR POWER FL INC
Status Location Address Mailing Address State License Number Phone
INACTIVE

901

KISSIMMEE, FL 34741

ARMSTRONG BLVD

KISSIMMEE, FL 34741

EC13009924 (Exp: 08/31/2024) 855-729-7652

Inspection History

Type Request Date Result Inspector
ELECTRIC FINAL 12/05/2022 FINAL APPROVED JMUNSON
Note: 9/22/2022 - PREVIOUS INSPECTION NOTES Dissconnect needs to be installed between the Line tap and the PV system dissconnect fuse panel. Page E1 detal 9 and 12. Due to the line tap there is currently no way to shut power from the line tap to the fuses. NEC-690.13 Interior main 200 amp panel has not been labeled
SOLAR ELECTRIC FINAL 12/05/2022 FINAL APPROVED JMUNSON
Note: 9/22/2022 - PREVIOUS INSPECTION NOTES Dissconnect needs to be installed between the Line tap and the PV system dissconnect fuse panel. Page E1 detal 9 and 12. Due to the line tap there is currently no way to shut power from the line tap to the fuses. NEC-690.13 Interior main 200 amp panel has not been labeled.
ELECTRIC FINAL 09/22/2022 Disapproved - NO FEE JWALKER
Note: Dissconnect needs to be installed between the Line tap and the PV system dissconnect fuse panel. Page E1 detal 9 and 12. Due to the line tap there is currently no way to shut power from the line tap to the fuses. NEC-690.13 Interior main 200 amp panel has not been labeled
SOLAR ELECTRIC FINAL 09/22/2022 Disapproved - NO FEE JWALKER
Note: Dissconnect needs to be installed between the Line tap and the PV system dissconnect fuse panel. Page E1 detal 9 and 12. Due to the line tap there is currently no way to shut power from the line tap to the fuses. NEC-690.13 Interior main 200 amp panel has not been labeled.

Review History

Department Status Date In Date Out
BLD COMPLETE 10/10/2022 10/10/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 10/10/2022 10/10/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 08/23/2022 08/23/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 08/23/2022 08/23/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/28/2022 07/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 07/28/2022 07/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/29/2022
INSPECTION - RESIDENTIAL ¤209.00 07/29/2022
SOLAR PLAN REVIEW ¤65.00 07/29/2022
SURCHARGE FS 533.721 ¤2.45 07/29/2022
SURCHARGE - FS 468.631 ¤3.68 07/29/2022
Fees Total Due: ¤0.00 Total Paid: ¤310.13