I want to search for...
Permit #2022071560
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00460-0180 |
| CONDITIONED SPACE: 1236 sqft |
| GARAGE: 472 sqft |
| OPENED PORCH (WITH ROOF) : 65 sqft |
| Total Square Footage: 1773 sqft |
| Block: 00460 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 386-931-2131 |
| Location Address: 35 PARKWAY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2022 |
| NOC: RECORDED |
| Applicant name: FLAGLER HABITAT |
| Owner: FLAGLER HABITAT FOR HUMANITY INC |
|
Address PO BOX 187 BUNNELL, FL 32110 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤80,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLAGLER HABITAT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2 WEST MOODY BLVD BUNNELL, FL 32110 |
HABITAT | 386-931-2131 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
MICHAEL A PENAGOS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3321 GLENSHANE WAY ORMOND BEACH, FL 32174 |
CCC1330460 (Exp: 08/31/2026) | 386-569-9133 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 09/01/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 07/24/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/21/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/21/2023 | APPROVED | FSLADISH |
| Note: 07/21/23 UPON WALKING PRPERTY IT LOOKS AS IF THE DRAINAGE WILL WORK AS INDICATED. | |||
| ROW - STORMWATER FINAL | 07/21/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 07/21/23 HABITAT BUILDER INDICATED HOT PATCH HAS BEEN SCHEDULED AND GRASS IS SCHEDULED TO BE MOWED. EVERYTHING ELSE LOOKED GOOD AT THE TIME OF THIS INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 07/21/2023 | APPROVED | FSLADISH |
| Note: 07/21/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. LOOKED GOOD AT THE TIME OF THIS INSPECTION. | |||
| BLD - BUILDING FINAL | 07/21/2023 | FINAL APPROVED | RMARTIN |
| ELECTRIC - EARLY POWER | 04/17/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0818. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 04/04/2023 | APPROVED | FSLADISH |
| Note: 04/04/23 READY TO POUR AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 03/08/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/08/2023 | APPROVED | MGIBSON |
| INSULATION | 02/15/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 02/08/2023 | APPROVED | KSANDOE |
| WINDOW NAILING | 01/23/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 01/06/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/22/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 12/06/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 11/17/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/17/2022 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/13/2022 | APPROVED | MGIBSON |
| ELECTRIC TEMP POLE | 10/06/2022 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 09/09/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/09/2023 | 05/09/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF | |||
| BADMIN | INFORMATION | 05/08/2023 | 05/08/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF | |||
| ENGIN1 | COMPLETE | 11/16/2022 | 11/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/16/2022 | 11/16/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/17/2022 | 08/17/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide color sheet with a paint color for the home that meets the City's LDC requirements. If we can not find the color to verify then we will need a swatch sample of the color | |||
| MECH | COMPLETE | 08/17/2022 | 08/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/11/2022 | 08/12/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide color sheet with a paint color for the home that meets the City's LDC requirements. | |||
| ZON | INFORMATION | 08/10/2022 | 08/10/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/10/2022 | 08/15/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| SWALE | COMPLETE | 08/01/2022 | 11/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/29/2022 | 08/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 07/29/2022 | 07/29/2022 |
| Note: Held By: LISA ASBILL - - lasbill@palmcoastgov.com Utility Application has different address requested | |||
| ELEC | COMPLETE | 07/29/2022 | 08/01/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/29/2022 | 08/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/29/2022 | 08/03/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/29/2022 | 08/01/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 07/29/2022 | 08/04/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/29/2022 | 08/02/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Can not find the color azure blue. Please provide a sample for review |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 08/24/2022 |
| ADJUSTMENT 50% | (¤295.64) | 08/24/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/24/2022 |
| INSPECTION - RESIDENTIAL | ¤437.25 | 08/24/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤124.02 | 08/24/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/24/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/24/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/24/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/24/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/24/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/24/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/24/2022 |
| SURCHARGE FS 533.721 | ¤2.07 | 08/24/2022 |
| SURCHARGE - FS 468.631 | ¤3.10 | 08/24/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/24/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/24/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/24/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/24/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/24/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/24/2022 |
| SEWER CREDIT | (¤850.00) | 08/24/2022 |
| SEWER INSPECTION | ¤25.00 | 08/24/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/24/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/24/2022 |
| SITE PLAN 30 | ¤30.00 | 08/24/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,049.49 |