Permit #2022080346

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00400-0020
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
Total Square Footage: 2459 sqft
Block: 00400
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 631-929-5500
Location Address: 119 POINT PLEASANT DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/21/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: SEASMOKE PROPERTIES FLORIDA LLC

Address

STE 210

WEST PALM BEACH, FL 33401

Address

515 N FLAGLER DR

WEST PALM BEACH, FL 33401

Lot: 0020
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/30/2023 FINAL APPROVED KSANDOE
U -UTILITY RESIDENTIAL FINAL 06/30/2023 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 06/23/2023 APPROVED GBERTOLA
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/23/2023 APPROVED GBERTOLA
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved
ROW FIELD SURVEY /GRADING CERTIFICATION 06/23/2023 APPROVED GBERTOLA
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved
ROW - STORMWATER FINAL 06/23/2023 APPROVED GBERTOLA
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved
ELECTRIC - EARLY POWER 05/04/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1327. Release Power
GRAVITY SEWER TEST 04/06/2023 APPROVED MGIBSON
U - SEWER TIE IN 04/06/2023 APPROVED MGIBSON
U-CROSS CONNECTION 04/06/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 03/27/2023 APPROVED EMADISON
Note: ** 03/27/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 3/24/2023 - PREVIOUS INSPECTION NOTES 3/24/23=FORM BOARDS ARE OUT THEY ARE WORKING ON IT ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/23/2023 - PREVIOUS INSPECTION NOTES 03/23/22=*The Culvert on the right is not 8 ft from the road edge.
ROW- PRE-APRON (PRE-POUR) 03/24/2023 Disapproved - NO FEE GBERTOLA
Note: 3/24/23=FORM BOARDS ARE OUT THEY ARE WORKING ON IT ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/23/2023 - PREVIOUS INSPECTION NOTES 03/23/22=*The Culvert on the right is not 8 ft from the road edge.
ROW- PRE-APRON (PRE-POUR) 03/23/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 03/23/22=*The Culvert on the right is not 8 ft from the road edge.
PEP TANK INSTALLATION REQUEST 02/13/2023 APPROVED TSCHWEERS
INSULATION 01/20/2023 APPROVED KSANDOE
Note: 1/18/2023 - PREVIOUS INSPECTION NOTES need energy calcs onsite. stopped inspection
INSULATION 01/18/2023 Disapproved - NO FEE KSANDOE
Note: need energy calcs onsite. stopped inspection
ELECTRIC-TUG 01/12/2023 APPROVED JMUNSON
ALL ROUGH 01/11/2023 APPROVED KSANDOE
LATH/BRICK/ WATER BARRIER 01/03/2023 APPROVED RMARTIN
ROOF VALLEY & METAL 12/15/2022 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2460 Trusses missing bracing marked on plan
WALL SHEATHING 12/07/2022 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/07/2022 APPROVED - AS NOTED KSANDOE
Note: Trusses missing bracing marked on plan
FOUND SURVEY APPROVED (OFFICE) 11/22/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/21/2022 APPROVED KSANDOE
MONOLITHIC SLAB 11/02/2022 APPROVED KSANDOE
Note: 10/31/2022 - PREVIOUS INSPECTION NOTES Clear cave-ins and ensure 3" minimum clearance from steel to earth
MONOLITHIC SLAB 10/31/2022 Disapproved - NO FEE KSANDOE
Note: Clear cave-ins and ensure 3" minimum clearance from steel to earth
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/26/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 12/15/2022 12/15/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/22/2022 11/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/22/2022 11/22/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH HOLD 09/06/2022 09/06/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition Direction is SW per site plan (Third Request)
MECH COMPLETE 09/06/2022 09/06/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 08/22/2022 08/22/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH HOLD 08/22/2022 08/23/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition Direction is SW per site plan (Second Request)
ENGIN1 COMPLETE 08/22/2022 08/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/22/2022 08/29/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 08/05/2022 08/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/05/2022 08/05/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 08/05/2022 08/05/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/05/2022 08/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/05/2022 08/12/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 08/05/2022 08/05/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 COMPLETE 08/05/2022 08/12/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 08/05/2022 08/05/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Right side of home does not meet the setbacks please correct that.
SWALE COMPLETE 08/05/2022 11/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 06/28/2023
SW ENG REINSPECTION 30 ¤30.00 06/28/2023
PLAN REVIEW - REVISION ¤32.50 06/28/2023
CONNECTION FEES ¤1,077.88 10/21/2022
CONTRACTOR CHANGE ¤40.00 10/21/2022
WATER- TURN ON ¤25.00 10/21/2022
ADJUSTMENT 50% (¤405.07) 10/21/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/21/2022
INSPECTION - RESIDENTIAL ¤607.75 10/21/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 10/21/2022
SW ENG - REVIEW 20 ¤20.00 10/21/2022
SW ENG RES REVIEW 200 ¤200.00 10/21/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/21/2022
SEWER CREDIT (¤650.00) 10/21/2022
SEWER INSPECTION ¤25.00 10/21/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/21/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/21/2022
SITE PLAN 30 ¤30.00 10/21/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/21/2022
IMPACT FEE FIRE ¤388.65 10/21/2022
IMPACT FEE PARKS ¤1,455.13 10/21/2022
IMPACT FEE SCHOOL ¤3,600.00 10/21/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/21/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/21/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/21/2022
SURCHARGE FS 533.721 ¤2.69 10/21/2022
SURCHARGE - FS 468.631 ¤4.04 10/21/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/21/2022
SW ENG INSPECTION 80 ¤80.00 10/21/2022
SW ENG PRE APRON ¤30.00 10/21/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,082.98