I want to search for...
Permit #2022080367
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01450-0030 |
| CONDITIONED SPACE: 1771 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 116 sqft |
| OPENED PORCH (WITH ROOF) : 263 sqft |
| Total Square Footage: 2623 sqft |
| Block: 01450 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-237-1210 |
| Location Address: 179 BIRCHWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/25/2022 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: TKKO INVESTMENT CORP |
|
Address 10 WHITE HAVEN LN PALM COAST, FL 32164 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/22/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 05/16/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/16/2024 2:03:41 PM *** 1. Please raise ODU pad for Min 3" above surrounding ground. FBCM 304.10 Clearances from grade 2. (1) Locking cap needs locked at ODU. FBC - M1411.8 3. Please seal hole in exterior wall by ODU disconnect. R402.4, 4. Plumbing in lanai either needs fixtures connected or hard caps installed. 5. Spare Bath Please seal Lavatory counter top to wall. 6. Master bath Please seal toilet at floor. 7. Master Bath please seal Lavatory countertops to wall. 8. Please seal Plenum ceiling Penetrations at AHU. R402.4, 9. Please seal hole in interior block wall at garage door. 10. Please cut attic stairs to Manufacturer specs. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/22/2024 | FINAL APPROVED | DHANEY |
| Note: Inspector Notes from Inspection 9035 No irrigation, no cross connections. | |||
| ROW - STORMWATER FINAL | 04/19/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/19/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/19/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/15/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/15/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/15/24 STILL NEED TO LOWER RIGHT SIDE SWALE NOTE WHITE PAINT STARTING AT CATCH BASIN YOU NEED TO LOWER GRADE 3-4 TENTHS AND GRADUALLY RAISE IT AS YOU WORK BACK TOWARDS YOUR CULVERT. BE SURE TO PACK MATERIAL AT CATCH BASIN TO PREVENT FURTHER EROSION FROM AROUND IT ** AREA AT SEWER CLEAN OUT ON RIGHT SIDE NEED TO REPAIR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/08/2024 | CANCELLED BY APPLICANT | FSLADISH |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/02/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FRONT ROADSIDE SWALE IS TO HIGH NEED TO LOWER SO THE WATER WILL BE ABLE TO FLOW IN TO CATCH BASIN. THE SWALE IS LEVEL OR HIGHER THAN THE CONCRETE LID FOR CATCH BASIN | |||
| U-CROSS CONNECTION | 03/20/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - DRAINAGE | 02/23/2024 | APPROVED | TPOLACEK |
| Note: 02/23/24 WILL PASS THIS INSPECTION BUT WOULD REQUEST BUILDER INSTALL SILT FENCE ALONG LEFT SIDE ROW AS WELL. rjg. Per builder request, next inspection scheduled for Friday instead of Thursday. 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/2024 - PREVIOUS INSPECTION NOTES ** 02/20/24 BUILDER NEEDS TO INSTALL A EITHER A SILT FENCE IN FRONT OF THE CATCH BASIN TO PREVENT EROSION OF MATERIAL FROM ENTERING STORMWATER SYSTEM, YOU02/0 CAN ALSO UTILIZE HAY BALES ** FOLLOW UP INSPECTION ON 02/22/24 ____________________________________________________________________________________________________________________ rjg. This was canceled by app and rescheduled for Monday at the request of the builder. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/2024 - PREVIOUS INSPECTION NOTES 02/14/24 BUILDER NEEDS TO CLEAN UP JOB SITE. THERE IS ILLICIT DISHACHARGE IN SWALE, OVERGROWTH ACROSS ALL PROPERTY INCLUDING SWALE BLOCKING DRAINAGE. I HAVE ATTACHED CURRENT PHOTOS AND WILL BE CONTACTING CODE ENFORCEMENT TO OPEN A CASE. ____________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24= BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. NEEDS TO REMOVE THE CONCRETE OVERPOUR ON THE SWALE ON THE RIGHT SIDE BY THE DRIVEWAY INSPECTOR BE BACK 2/14/24 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE NEEDS TO REMOVE THE CONCRETE POUR ON THE RIGHT SIDE SWALE BY THE DRIVEWAY. THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. | |||
| ROW - DRAINAGE | 02/22/2024 | CANCELLED BY APPLICANT | RGROSS |
| Note: rjg. Canceled by Robert and rescheduled for Friday. 2/20/2024 - PREVIOUS INSPECTION NOTES ** 02/20/24 BUILDER NEEDS TO INSTALL A EITHER A SILT FENCE IN FRONT OF THE CATCH BASIN TO PREVENT EROSION OF MATERIAL FROM ENTERING STORMWATER SYSTEM, YOU02/0 CAN ALSO UTILIZE HAY BALES ** FOLLOW UP INSPECTION ON 02/22/24 ____________________________________________________________________________________________________________________ rjg. This was canceled by app and rescheduled for Monday at the request of the builder. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/2024 - PREVIOUS INSPECTION NOTES 02/14/24 BUILDER NEEDS TO CLEAN UP JOB SITE. THERE IS ILLICIT DISHACHARGE IN SWALE, OVERGROWTH ACROSS ALL PROPERTY INCLUDING SWALE BLOCKING DRAINAGE. I HAVE ATTACHED CURRENT PHOTOS AND WILL BE CONTACTING CODE ENFORCEMENT TO OPEN A CASE. ____________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24= BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. NEEDS TO REMOVE THE CONCRETE OVERPOUR ON THE SWALE ON THE RIGHT SIDE BY THE DRIVEWAY INSPECTOR BE BACK 2/14/24 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE NEEDS TO REMOVE THE CONCRETE POUR ON THE RIGHT SIDE SWALE BY THE DRIVEWAY. THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. | |||
| ROW - DRAINAGE | 02/19/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 02/20/24 BUILDER NEEDS TO INSTALL A EITHER A SILT FENCE IN FRONT OF THE CATCH BASIN TO PREVENT EROSION OF MATERIAL FROM ENTERING STORMWATER SYSTEM, YOU02/0 CAN ALSO UTILIZE HAY BALES ** FOLLOW UP INSPECTION ON 02/22/24 ____________________________________________________________________________________________________________________ rjg. This was canceled by app and rescheduled for Monday at the request of the builder. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/2024 - PREVIOUS INSPECTION NOTES 02/14/24 BUILDER NEEDS TO CLEAN UP JOB SITE. THERE IS ILLICIT DISHACHARGE IN SWALE, OVERGROWTH ACROSS ALL PROPERTY INCLUDING SWALE BLOCKING DRAINAGE. I HAVE ATTACHED CURRENT PHOTOS AND WILL BE CONTACTING CODE ENFORCEMENT TO OPEN A CASE. ____________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24= BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. NEEDS TO REMOVE THE CONCRETE OVERPOUR ON THE SWALE ON THE RIGHT SIDE BY THE DRIVEWAY INSPECTOR BE BACK 2/14/24 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE NEEDS TO REMOVE THE CONCRETE POUR ON THE RIGHT SIDE SWALE BY THE DRIVEWAY. THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. | |||
| ROW - DRAINAGE | 02/15/2024 | CANCELLED BY APPLICANT | RGROSS |
| Note: 2/14/2024 - PREVIOUS INSPECTION NOTES 02/14/24 BUILDER NEEDS TO CLEAN UP JOB SITE. THERE IS ILLICIT DISHACHARGE IN SWALE, OVERGROWTH ACROSS ALL PROPERTY INCLUDING SWALE BLOCKING DRAINAGE. I HAVE ATTACHED CURRENT PHOTOS AND WILL BE CONTACTING CODE ENFORCEMENT TO OPEN A CASE. ____________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24= BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. NEEDS TO REMOVE THE CONCRETE OVERPOUR ON THE SWALE ON THE RIGHT SIDE BY THE DRIVEWAY INSPECTOR BE BACK 2/14/24 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE NEEDS TO REMOVE THE CONCRETE POUR ON THE RIGHT SIDE SWALE BY THE DRIVEWAY. THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. | |||
| ROW - DRAINAGE | 02/14/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 02/14/24 BUILDER NEEDS TO CLEAN UP JOB SITE. THERE IS ILLICIT DISHACHARGE IN SWALE, OVERGROWTH ACROSS ALL PROPERTY INCLUDING SWALE BLOCKING DRAINAGE. I HAVE ATTACHED CURRENT PHOTOS AND WILL BE CONTACTING CODE ENFORCEMENT TO OPEN A CASE. ____________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24= BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. NEEDS TO REMOVE THE CONCRETE OVERPOUR ON THE SWALE ON THE RIGHT SIDE BY THE DRIVEWAY INSPECTOR BE BACK 2/14/24 ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE NEEDS TO REMOVE THE CONCRETE POUR ON THE RIGHT SIDE SWALE BY THE DRIVEWAY. THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. | |||
| ROW - DRAINAGE | 02/08/2024 | Disapproved - NO FEE | GBERTOLA |
| Note: 2/8/24= BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. NEEDS TO REMOVE THE CONCRETE OVERPOUR ON THE SWALE ON THE RIGHT SIDE BY THE DRIVEWAY INSPECTOR BE BACK 2/14/24 PICTURES ATTACHED ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE NEEDS TO REMOVE THE CONCRETE POUR ON THE RIGHT SIDE SWALE BY THE DRIVEWAY. THERE IS OVERGROWN VEGETATION ON THE RIGHT SIDE OF THE SWALE THAT IS BLOCKING THE WATER FLOW NEAR THE PROPERTY LINE. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/07/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| ELECTRIC - EARLY POWER | 08/07/2023 | APPROVED | JSTEWART |
| GRAVITY SEWER TEST | 07/26/2023 | APPROVED | JSTEWART |
| Note: 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23- No 5ft head test. | |||
| U - SEWER TIE IN | 07/26/2023 | APPROVED | JSTEWART |
| Note: 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23- tie in is burried unable to verify connection. | |||
| U - SEWER TIE IN | 07/24/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 7/24/23- tie in is burried unable to verify connection. | |||
| GRAVITY SEWER TEST | 07/24/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 7/24/23- No 5ft head test. | |||
| PEP TANK INSTALLATION REQUEST | 06/30/2023 | APPROVED | CSTONE |
| INSULATION | 06/27/2023 | APPROVED | JSTEWART |
| ALL ROUGH | 06/21/2023 | APPROVED | TSTAUFFACHER |
| Note: 6/20/2023 - PREVIOUS INSPECTION NOTES 6/20/23- No permit, energy calcs, or product aproval onsite. 107.3,1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE . Please install nail plates at liquid lines garage wall. 5ft head fail (not 5', and empty). stopped inspection. | |||
| ALL ROUGH | 06/20/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 6/20/23- No permit, energy calcs, or product aproval onsite. 107.3,1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE . Please install nail plates at liquid lines garage wall. 5ft head fail (not 5', and empty). stopped inspection. | |||
| LATH/BRICK/ WATER BARRIER | 06/20/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2023 | APPROVED | FWILLIS |
| Note: 5/4/2023 - PREVIOUS INSPECTION NOTES DOCUMENTS MUST BE APPROVED, READABLE AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. PAGE A2 UNREADABLE. ANCHOR BOLTS MISSING ON BEARING WALL. | |||
| ROOF VALLEY & METAL | 05/04/2023 | APPROVED | FWILLIS |
| WALL SHEATHING | 05/04/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/04/2023 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: DOCUMENTS MUST BE APPROVED, READABLE AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. PAGE A2 UNREADABLE. ANCHOR BOLTS MISSING ON BEARING WALL. | |||
| TIE BEAM / LINTEL | 12/14/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/29/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/08/2022 | APPROVED | FWILLIS |
| Note: Slider Turtle was laying her eggs at the back left rear, at the time of my visit, so be careful. Roughly 5' in front of the tree line. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/20/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/31/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/03/2024 | 05/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/29/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/29/2022 | 11/29/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/18/2022 | 08/25/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/05/2022 | 08/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/05/2022 | 08/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/05/2022 | 08/05/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | HOLD | 08/05/2022 | 08/12/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE COMMON SWALE ON BOTH PROPERTY LINES | |||
| ZON | HOLD | 08/05/2022 | 08/08/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 5 tress please add one more tree | |||
| SWALE | COMPLETE | 08/05/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| CONNECTION FEES | ¤1,077.88 | 08/25/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/25/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/25/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/25/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/25/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/25/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/25/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/25/2022 |
| SURCHARGE FS 533.721 | ¤2.99 | 08/25/2022 |
| SURCHARGE - FS 468.631 | ¤4.48 | 08/25/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/25/2022 |
| WATER- TURN ON | ¤25.00 | 08/25/2022 |
| ADJUSTMENT 50% | (¤456.25) | 08/25/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/25/2022 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 08/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 08/25/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/25/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/25/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/25/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/25/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/25/2022 |
| SEWER CREDIT | (¤850.00) | 08/25/2022 |
| SEWER INSPECTION | ¤25.00 | 08/25/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/25/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/25/2022 |
| SITE PLAN 30 | ¤30.00 | 08/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,084.91 |