I want to search for...
Permit #2022080370
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00210-0050 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00210 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 631-929-5500 |
| Location Address: 20 POTOMAC DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/19/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: SEASMOKE PROPERTIES FLORIDA LLC |
|
Address STE 210 WEST PALM BEACH, FL 33401 |
|
Address 515 N FLAGLER DR WEST PALM BEACH, FL 33401 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/30/2023 | FINAL APPROVED | KSANDOE |
| ROW - STORMWATER FINAL | 06/30/2023 | FINAL APPROVED | FSLADISH |
| Note: 06/30/23 everything looked good at time of inspection. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/30/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/23/2023 | APPROVED | GBERTOLA |
| Note: 6/23/23=At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved 6/22/2023 - PREVIOUS INSPECTION NOTES WORNG SURVEY. SURVEY PROVIDED IS FOR POINT PLESANT DRIVE NOT FOR POTOMAC DRIVE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/23/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved | |||
| ROW - FINAL APRON (AFTER POUR) | 06/23/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/22/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: WORNG SURVEY. SURVEY PROVIDED IS FOR POINT PLESANT DRIVE NOT FOR POTOMAC DRIVE. | |||
| U - SEWER TIE IN | 05/22/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 05/22/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no-irrigation-no cross connection | |||
| GRAVITY SEWER TEST | 05/22/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 03/23/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1442. Release Power Inspector Notes from Inspection 2200 Emailed FPL @ 1111. Release Power | |||
| PEP TANK INSTALLATION REQUEST | 03/07/2023 | APPROVED | TSCHWEERS |
| Note: 2/27/2023 3:05:31 PM- PREVIOUS INSPECTION NOTES 1/25/2023 10:32:24 AM- PREVIOUS INSPECTION NOTES 1/11/2023 7:59:18 AM- PREVIOUS INSPECTION NOTES drywall needs to be up or onsite 1/23/2023 Dumpster in way of tank. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/07/2023 | APPROVED | EMADISON |
| Note: ** 03/07/23 CORRECTIONS MADE READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND THE COMPACTION OF MATERIAL ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 3/6/2023 - PREVIOUS INSPECTION NOTES ** 03/06/23 CULVERT IS PITCHED IN THE WRONG DIRECTION STORM WATER IS TO FLOW FROM (LEFT) TO (RIGHT) REVIEW SWALE PLANE DIAGRAM FOR THE INVERT AHD PROPER DIRECTION OF FLOW. ** ACROSS FACE BOARD AT AT EDGE OF ROAD NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON | |||
| ROW- PRE-APRON (PRE-POUR) | 03/06/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/06/23 CULVERT IS PITCHED IN THE WRONG DIRECTION STORM WATER IS TO FLOW FROM (LEFT) TO (RIGHT) REVIEW SWALE PLANE DIAGRAM FOR THE INVERT AHD PROPER DIRECTION OF FLOW. ** ACROSS FACE BOARD AT AT EDGE OF ROAD NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON | |||
| PEP TANK INSTALLATION REQUEST | 02/27/2023 | Disapproved -FEE REQUIRED | TSCHWEERS |
| Note: 1/25/2023 10:32:24 AM- PREVIOUS INSPECTION NOTES 1/11/2023 7:59:18 AM- PREVIOUS INSPECTION NOTES drywall needs to be up or onsite 1/23/2023 Dumpster in way of tank. | |||
| PEP TANK INSTALLATION REQUEST | 01/23/2023 | Disapproved -FEE REQUIRED | TSCHWEERS |
| Note: 1/11/2023 7:59:18 AM- PREVIOUS INSPECTION NOTES drywall needs to be up or onsite 1/23/2023 Dumpster in way of tank. | |||
| PEP TANK INSTALLATION REQUEST | 01/06/2023 | Disapproved - NO FEE | CSTONE |
| Note: drywall needs to be up or onsite | |||
| INSULATION | 01/05/2023 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 01/03/2023 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2420 Window nailing inspection added Missing product approvals 12/14/2022 - PREVIOUS INSPECTION NOTES need all approved documents on site for inspection. Inspection Stopped | |||
| WINDOW NAILING | 12/29/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Window nailing inspection added Missing product approvals 12/14/2022 - PREVIOUS INSPECTION NOTES need all approved documents on site for inspection. Inspection Stopped | |||
| ALL ROUGH | 12/27/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Window nailing inspection added Missing product approvals 12/14/2022 - PREVIOUS INSPECTION NOTES need all approved documents on site for inspection. Inspection Stopped | |||
| ELECTRIC-TUG | 12/19/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1111. Release Power | |||
| ALL ROUGH | 12/14/2022 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 12/14/2022 | Disapproved - NO FEE | LMILLER |
| Note: need all approved documents on site for inspection. Inspection Stopped | |||
| ROOF VALLEY & METAL | 12/09/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/30/2022 | APPROVED | KSANDOE |
| Note: 11/28/2022 - PREVIOUS INSPECTION NOTES 11/28/22 Roof sheathing in garage not nailed properly. Marked with 1x3. Check all Must have building plans on site for inspection. Stopped inspection 11/22/2022 - PREVIOUS INSPECTION NOTES Trades still working. Not ready for inspection | |||
| WALL SHEATHING | 11/30/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/28/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: 11/28/22 Roof sheathing in garage not nailed properly. Marked with 1x3. Check all Must have building plans on site for inspection. Stopped inspection 11/22/2022 - PREVIOUS INSPECTION NOTES Trades still working. Not ready for inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/22/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Trades still working. Not ready for inspection | |||
| TIE BEAM / LINTEL | 11/03/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 11/01/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/21/2022 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/20/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/20/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/14/2023 | 02/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/30/2022 | 11/30/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/01/2022 | 11/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/01/2022 | 11/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/18/2022 | 08/25/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/05/2022 | 08/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/05/2022 | 08/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/05/2022 | 08/05/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/05/2022 | 08/12/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE BOTH PROPERTY LINES A COMMON SWALE | |||
| ZON | COMPLETE | 08/05/2022 | 08/05/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/05/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/28/2023 |
| UTILITY PEP REINSPECTION | ¤40.00 | 06/28/2023 |
| UTILITY PEP REINSPECTION | ¤40.00 | 06/28/2023 |
| SEWER CREDIT | (¤650.00) | 10/19/2022 |
| SEWER INSPECTION | ¤25.00 | 10/19/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/19/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/19/2022 |
| SITE PLAN 30 | ¤30.00 | 10/19/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/19/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/19/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/19/2022 |
| WATER- TURN ON | ¤25.00 | 10/19/2022 |
| ADJUSTMENT 50% | (¤405.07) | 10/19/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/19/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 10/19/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 10/19/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/19/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/19/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/19/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/19/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/19/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/19/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/19/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/19/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/19/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 10/19/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 10/19/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/19/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/19/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/19/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,195.48 |