I want to search for...
Permit #2022080393
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00380-0080 |
| CONDITIONED SPACE: 1721 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| GARAGE: 455 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 631-929-5500 |
| Location Address: 161 UNDERWOOD TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/03/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: SEASMOKE PROPERTIES FLORIDA LLC |
|
Address STE 210 WEST PALM BEACH, FL 33401 |
|
Address 515 N FLAGLER DR WEST PALM BEACH, FL 33401 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/18/2023 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL APRON (AFTER POUR) | 05/15/2023 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 05/15/2023 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 05/15/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/02/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/02/2023 | APPROVED | PFLANAGAN |
| Note: GRADE LOOKS GOOD AT THE TIME OF THIS INSPECTION | |||
| ELECTRIC - EARLY POWER | 04/06/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-6-23 1. Emailed FPL at 11:12. | |||
| INSULATION | 01/20/2023 | APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 01/17/2023 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 01/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 01/11/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/11/2023 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 01/05/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 12/13/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 12/09/2022 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 12/09/2022 | APPROVED | BTAYLOR |
| WALL SHEATHING | 12/05/2022 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11-2-22 1. Mud beds can't exceed 1/2" maximum | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/05/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11-2-22 1. Mud beds can't exceed 1/2" maximum 12-5-22 1. Bucket in garage not nailed off. | |||
| ROOF VALLEY & METAL | 12/05/2022 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11-2-22 1. Mud beds can't exceed 1/2" maximum | |||
| TIE BEAM / LINTEL | 11/02/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: 11-2-22 1. Mud beds can't exceed 1/2" maximum | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/19/2022 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/11/2022 | APPROVED | BTAYLOR |
| Note: 10/10/2022 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED, UNCOVER ALL DITCHES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/10/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO PLANS OR PERMIT POSTED, UNCOVER ALL DITCHES | |||
| WATER METER INSTALLATION REQUEST | 10/04/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/06/2023 | 03/06/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/08/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/05/2022 | 08/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/05/2022 | 08/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/01/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/01/2023 |
| CONNECTION FEES | ¤1,077.88 | 10/03/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/03/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/03/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/03/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/03/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/03/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/03/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/03/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/03/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 10/03/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 10/03/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/03/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/03/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/03/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/03/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/03/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/03/2022 |
| SEWER CREDIT | (¤850.00) | 10/03/2022 |
| SEWER INSPECTION | ¤25.00 | 10/03/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/03/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/03/2022 |
| SITE PLAN 30 | ¤30.00 | 10/03/2022 |
| WATER- TURN ON | ¤25.00 | 10/03/2022 |
| ADJUSTMENT 50% | (¤405.07) | 10/03/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/03/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 10/03/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 10/03/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,852.98 |