Permit #2022080396
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00490-0150 |
| CONDITIONED SPACE: 1721 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| GARAGE: 455 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00490 |
| Subdivision: - |
| Job Phone: 631-929-5500 |
| Location Address: 117 KARAS TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/03/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICK PALM DEVELOPMENT LLC |
|
Address SUITE 110 GREENWOOD VILLAGE, CO 80111 |
|
Address 5460 S QUEBEC ST GREENWOOD VILLAGE, CO 80111 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/12/2023 | FINAL APPROVED | KSANDOE |
| ROW - STORMWATER FINAL | 12/12/2023 | APPROVED | TPOLACEK |
| Note: AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/12/2023 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/08/2023 | APPROVED | GBERTOLA |
| Note: 12/08/23=CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 0/2/23= THE ROAD SIDE SWALE ON THE RIGHT SIDE OF DRIVEWAY NEED TO BE 8' OFF THE EDGE OF PAVEMENT NEEDS TO RAISE THE FRONT PROPERTY LINE ON THE LEFT SIDE . +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2023 - PREVIOUS INSPECTION NOTES 1) NEED ALL BARE AREAS IN THE LOT SODED 2) THE ROAD SIDE SWALE ON THE RIGHT SIDE OF DRIVEWAY NEED TO BE 8' OFF THE EDGE OF PAVEMENT 3) SOD AGAINST THE HOUSE IS WASHING OUT | |||
| ROW - FINAL APRON (AFTER POUR) | 12/08/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW- PROJECT STATUS | 12/08/2023 | APPROVED | GBERTOLA |
| Note: MEETING WITH THE BUILDER | |||
| ROW- PROJECT STATUS | 11/15/2023 | APPROVED | GBERTOLA |
| Note: builder ask me to stop by | |||
| ROW- PROJECT STATUS | 10/02/2023 | APPROVED | GBERTOLA |
| Note: 10/2/23= THE ROAD SIDE SWALE ON THE RIGHT SIDE OF DRIVEWAY NEED TO BE 8' OFF THE EDGE OF PAVEMENT NEEDS TO RAISE THE FRONT PROPERTY LINE ON THE LEFT SIDE . | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED ALL BARE AREAS IN THE LOT SODED 2) THE ROAD SIDE SWALE ON THE RIGHT SIDE OF DRIVEWAY NEED TO BE 8' OFF THE EDGE OF PAVEMENT 3) SOD AGAINST THE HOUSE IS WASHING OUT | |||
| ELECTRIC - EARLY POWER | 07/20/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 4-21-23 1. Emailed FPL at 9:24. 7-20-23 1. Emailed FPL at 9:35. | |||
| GRAVITY SEWER TEST | 06/15/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/15/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/09/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE EKEVATIONS BEFORE POURING THE CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN CONCRETE TO MEET ALL CITY'S STANDARTS ----------------------------------------------------------------------------------------------- 6/8/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO MOVE FORM BOARD AT EDGE OF PAVEMENT OUT OF ROAD WAY. ---------------------------------------------------------------------------------------- 6/5/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO MOVE FORM BOARD AT EDGE OF PAVEMENT OUT OF ROAD WAY. 2) NEED TO HAVE DIRT ON THE OUTSIDE OF FORMS SO CONCRETE WILL STAY IN POURING AREA. CULVERT IS GOOD AT THIS TIME | |||
| ROW- PRE-APRON (PRE-POUR) | 06/08/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO MOVE FORM BOARD AT EDGE OF PAVEMENT OUT OF ROAD WAY. PLEASE SEE PHOTOS ---------------------------------------------------------------------------------------- 6/5/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO MOVE FORM BOARD AT EDGE OF PAVEMENT OUT OF ROAD WAY. 2) NEED TO HAVE DIRT ON THE OUTSIDE OF FORMS SO CONCRETE WILL STAY IN POURING AREA. CULVERT IS GOOD AT THIS TIME | |||
| ROW- PRE-APRON (PRE-POUR) | 06/05/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO MOVE FORM BOARD AT EDGE OF PAVEMENT OUT OF ROAD WAY. 2) NEED TO HAVE DIRT ON THE OUTSIDE OF FORMS SO CONCRETE WILL STAY IN POURING AREA. CULVERT IS GOOD AT THIS TIME | |||
| INSULATION | 05/24/2023 | APPROVED | RSIMS |
| Note: 5/23/2023 - PREVIOUS INSPECTION NOTES 5/23/23: Missing firestop at Top Plate penetrations in the following locations: (marked on stud with FS below). 1).thermostat wire in garage & house 2). Kitchen range exhaust. 3). Partial penetration outside of laundry room. 4). At PVC plumbing vent stacks in both Laundry room & Hall bathroom. --- 5). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Both left & right sides of house. 6). Laundry room - Missing firestop at PT lathe & 2" x 6" pack out wall intersection. Inspector Notes from Inspection 2420 5/16/23: Must be complete prior to Insulation Inspection. Check at Insulation! *** Need to move wall mounted combo detector outside of Master Bedroom to better match location on plan detail. (To cover common area as intended). Inspector Notes from Inspection 2320 4/25/23: Please have the permit box mounted in the front of the property as required (not laying in the garage). | |||
| INSULATION | 05/23/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/23/23: Missing firestop at Top Plate penetrations in the following locations: (marked on stud with FS below). 1).thermostat wire in garage & house 2). Kitchen range exhaust. 3). Partial penetration outside of laundry room. 4). At PVC plumbing vent stacks in both Laundry room & Hall bathroom. --- 5). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Both left & right sides of house. 6). Laundry room - Missing firestop at PT lathe & 2" x 6" pack out wall intersection. Inspector Notes from Inspection 2420 5/16/23: Must be complete prior to Insulation Inspection. Check at Insulation! *** Need to move wall mounted combo detector outside of Master Bedroom to better match location on plan detail. (To cover common area as intended). Inspector Notes from Inspection 2320 4/25/23: Please have the permit box mounted in the front of the property as required (not laying in the garage). | |||
| PEP TANK INSTALLATION REQUEST | 05/22/2023 | APPROVED | CSTONE |
| ALL ROUGH | 05/16/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 5/16/23: Must be complete prior to Insulation Inspection. Check at Insulation! *** Need to move wall mounted combo detector outside of Master Bedroom to better match location on plan detail. (To cover common area as intended). Inspector Notes from Inspection 2320 4/25/23: Please have the permit box mounted in the front of the property as required (not laying in the garage). | |||
| LATH/BRICK/ WATER BARRIER | 04/25/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 4/25/23: Please have the permit box mounted in the front of the property as required (not laying in the garage). | |||
| ELECTRIC-TUG | 04/21/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-21-23 1. Emailed FPL at 9:24. | |||
| WALL SHEATHING | 04/21/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/21/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 04/21/2023 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 03/20/2023 | APPROVED | RSIMS |
| Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23: Return inspection! 1). 4 of the window mortar beds are over the maximum 1/2" thickness. (FBC606.3.1) 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23: No plans in box for inspection! (107.3.1). Inspection stopped. | |||
| TIE BEAM / LINTEL | 03/16/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/15/23: Return inspection! 1). 4 of the window mortar beds are over the maximum 1/2" thickness. (FBC606.3.1) 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23: No plans in box for inspection! (107.3.1). Inspection stopped. | |||
| TIE BEAM / LINTEL | 03/15/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/15/23: No plans in box for inspection! (107.3.1). Inspection stopped. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/15/2023 | APPROVED | TBAKER |
| U-CROSS CONNECTION | 03/15/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation,no cross connections. | |||
| MONOLITHIC SLAB | 03/07/2023 | APPROVED | RSIMS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/06/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/06/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/29/2023 | 08/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 03/14/2023 | 03/14/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Foundation survey shows house outside of Zone A but elevation certificate states structure is inside Zone A. Staff is going to reject the elevation certificate, there is no need to upload another one. | |||
| ZON | COMPLETE | 03/14/2023 | 03/14/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/14/2023 | 03/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 11/17/2022 | 11/18/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The BFE Determination has been accepted. The Revised Site Plan shows the structure outside of the SFHA, no elevation certificates will be required. | |||
| ENGIN1 | COMPLETE | 11/17/2022 | 11/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/17/2022 | 11/28/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/17/2022 | 11/17/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/02/2022 | 09/02/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 09/02/2022 | 09/02/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff needs the analysis done by the engineer that resulted in a BFE of 24' in order to do a complete review. | |||
| ENGIN1 | HOLD | 09/02/2022 | 09/02/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Sirte benchmark elevation is off from center of road elevations by .8' +/- | |||
| CUSVC | COMPLETE | 09/02/2022 | 09/07/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| SW1 | COMPLETE | 09/02/2022 | 09/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 08/19/2022 | 08/19/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation does not agree with site elevations by .8' Site elevations were chjecked with GPS and ITT as-builts and appear to be fine - the benchmark elevation seems to be off. | |||
| SWALE | COMPLETE | 08/08/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 08/08/2022 | 08/08/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please correct Map No. in the Notes on the Survey/Site Plan. According to the Site Plan, there is an unnumbered A Zone on the property. Per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted. | |||
| BLD | COMPLETE | 08/05/2022 | 08/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/05/2022 | 08/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/05/2022 | 08/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/05/2022 | 08/12/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/05/2022 | 08/08/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan Map panel number is incorrect should be 0228E Elevation plan: Please add banding on rigt side of home as home face ROW. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 12/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/12/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/12/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/03/2023 |
| WATER- TURN ON | ¤25.00 | 03/03/2023 |
| ADJUSTMENT 50% | (¤405.07) | 03/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/03/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 03/03/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 03/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/03/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/03/2023 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 03/03/2023 |
| SEWER CREDIT | (¤850.00) | 03/03/2023 |
| SEWER INSPECTION | ¤25.00 | 03/03/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/03/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/03/2023 |
| SITE PLAN 30 | ¤30.00 | 03/03/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/03/2023 |
| IMPACT FEE FIRE | ¤388.65 | 03/03/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/03/2023 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/03/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 03/03/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/03/2023 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/03/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 03/03/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 03/03/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/03/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/03/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,771.30 |