Permit #2022080414
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00400-0090 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 600 sqft |
| Total Square Footage: 3729 sqft |
| Block: 00400 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 386-627-0430 |
| Location Address: 58 WOOD CEDAR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/12/2022 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: KLEBANOV GILEL & OLGA VOLOVAYA H&W |
|
Address 74 LYONRIDGE LANE SAN MATEO, CA 94402 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/13/2023 | FINAL APPROVED | JSTEWART |
| U-CROSS CONNECTION | 09/13/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has irrigation meter with PVB installed-no cross connection | |||
| ROW - STORMWATER FINAL | 09/13/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/13/23 CORRECTIONS REQUESTED BY PREVIOUS INSPECTOR COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ NOTE TO INSPECTOR TALK TO GRADE GUY TOLD HIME THAT ALL THE BARE EARTH IN THE VACANT LOT NEEDS SEED AND STRAW AND IN THE ROAD SIDE SWALE BAHIA GRASS TO MATCH EXISTING | |||
| U -UTILITY RESIDENTIAL FINAL | 09/13/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 09/11/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/11/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------ NEED TO RE- DEFINE THE DRAINAGE CONVAYANCE IN THE BACK AND ON THE SIDE. ON THE LEFT SIDE WATER IS IMPACTEING THE HOUSE. | |||
| ROW- PROJECT STATUS | 09/06/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: NEED TO RE- DEFINE THE DRAINAGE CONVAYANCE IN THE BACK AND ON THE SIDE. ON THE LEFT SIDE WATER IS IMPACTEING THE HOUSE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/23/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE AC UNIT AND BEDS ON THE LEFT SIDE OF HOUSE IS OBSTRUCTING THE WATER FROM FLOWING TO ROAD SIDE SWALE 2) THE WATER IN THE BACK YARD IS FLOWING UP AGAINST THE HOUSE | |||
| ELECTRIC - EARLY POWER | 06/15/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 11:15AM | |||
| ROW- PROJECT STATUS | 06/12/2023 | APPROVED | PFLANAGAN |
| Note: MEET WITH GRADE GUY ABOUT THE GRADE ON YARD | |||
| ROW- PRE-APRON (PRE-POUR) | 05/24/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 05/24/23 PIPE IS GOOD. MAKE SURE TO REMOVE ANY LITTLE BIT OF WATER AND MAINTAIN 6" X 6" CULVERT END FOOTER. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 5/23/2023 - PREVIOUS INSPECTION NOTES 05/232/23 LEFT SIDE CULVERT HAS WASHED IN, PIPE IS FULL OF DIRT. WILL NEED TO REDIG LEFT SIDE MITERED END FOOTER BACK OUT TO 6" X 6" SPECIFICATIONS. PLEASE SEE PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/23/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 05/232/23 LEFT SIDE CULVERT HAS WASHED IN, PIPE IS FULL OF DIRT. WILL NEED TO REDIG LEFT SIDE MITERED END FOOTER BACK OUT TO 6" X 6" SPECIFICATIONS. PLEASE SEE PHOTO FOR REFERENCE. | |||
| U - SEWER TIE IN | 05/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 05/15/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 04/10/2023 | APPROVED - AS NOTED | TSCHWEERS |
| Note: 4/11/2023 Gravity sewer no pep tank needed. | |||
| INSULATION | 03/31/2023 | APPROVED | MKRASKI |
| Note: 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/23 1. Address not visible from road per FBC 319.1 2. Fire foam required @ top plate for range vent (kitchen side) Inspector Notes from Inspection 2320 1. Range hood needs nail plates at top plate on both sides 2. Flat straps need to be installed where 2x4s were cut out for vent 3. Back bathroom shower knee wall needs to be attached to slab Check @ insulation Added window nailing inspection | |||
| INSULATION | 03/30/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 3/30/23 1. Address not visible from road per FBC 319.1 2. Fire foam required @ top plate for range vent (kitchen side) Inspector Notes from Inspection 2320 1. Range hood needs nail plates at top plate on both sides 2. Flat straps need to be installed where 2x4s were cut out for vent 3. Back bathroom shower knee wall needs to be attached to slab Check @ insulation Added window nailing inspection | |||
| LATH/BRICK/ WATER BARRIER | 03/21/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Range hood needs nail plates at top plate on both sides 2. Flat straps need to be installed where 2x4s were cut out for vent 3. Back bathroom shower knee wall needs to be attached to slab Check @ insulation Added window nailing inspection | |||
| ALL ROUGH | 03/10/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Range hood needs nail plates at top plate on both sides 2. Flat straps need to be installed where 2x4s were cut out for vent 3. Back bathroom shower knee wall needs to be attached to slab Check @ insulation Added window nailing inspection | |||
| ROOF VALLEY & METAL | 01/30/2023 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 01/27/2023 | CANCELLED BY APPLICANT | FWILLIS |
| Note: 1/26/2023 - PREVIOUS INSPECTION NOTES 1/25/2023 - PREVIOUS INSPECTION NOTES Per phone convo with D. Chardini, it was my understanding the roof had only been dried in, not shingled. Reschedule and have roofer meet inspector on site to verify dry in. 1-26-23 Called Danial at 8: 38 no answer. when we arrived at the site there was no one here for the destructive inspection | |||
| ROOF VALLEY & METAL | 01/26/2023 | Disapproved - NO FEE | LMILLER |
| Note: 1/25/2023 - PREVIOUS INSPECTION NOTES Per phone convo with D. Chardini, it was my understanding the roof had only been dried in, not shingled. Reschedule and have roofer meet inspector on site to verify dry in. 1-26-23 Called Danial at 8: 38 no answer. when we arrived at the site there was no one here for the destructive inspection | |||
| ROOF VALLEY & METAL | 01/25/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Per phone convo with D. Chardini, it was my understanding the roof had only been dried in, not shingled. Reschedule and have roofer meet inspector on site to verify dry in. | |||
| ELECTRIC-TUG | 01/24/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:50 PM | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/18/2023 | APPROVED | JWALKER |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 1/17/23 No new engineering packet onsite stopped inspection 1/3/2023 - PREVIOUS INSPECTION NOTES 12/22/22: INSPECTION STOPPED! NOT READY! *** Framing contractor is still working on framing. **** Roof sheathing bump checked & walked - Approved 1/3/23 Down cells passed. As noted above roof passed and may be covered. 1. The Truss Page 10 of the prints and the engineering packet do not match. Truss on print are lettered T trusses in packet are letter A. 2. The piggy back trusses are missing hold down anchors. 3. Truss T-11 shown on the prints is missing a hold down anchor ans well as the small jack trusses. The wall needs to have anchors as it is part of the support / bearing wall holding the trusses. 4. Truss T-19 shown on the prints is out of allowed plumb tolerance at the front CMU wall. 5. Install hold down strap at the overframing ridge board end where it meets the roof below. 6. Front entry shearwall has not been anchor bolted down to the CMU wall below. 7. MGT anchor rear back room right side of the building needs to be nailed down. Stopped inspection engineering will need to be checked with new engineering packet. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/17/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1/17/23 No new engineering packet onsite stopped inspection 1/3/2023 - PREVIOUS INSPECTION NOTES 12/22/22: INSPECTION STOPPED! NOT READY! *** Framing contractor is still working on framing. **** Roof sheathing bump checked & walked - Approved 1/3/23 Down cells passed. As noted above roof passed and may be covered. 1. The Truss Page 10 of the prints and the engineering packet do not match. Truss on print are lettered T trusses in packet are letter A. 2. The piggy back trusses are missing hold down anchors. 3. Truss T-11 shown on the prints is missing a hold down anchor ans well as the small jack trusses. The wall needs to have anchors as it is part of the support / bearing wall holding the trusses. 4. Truss T-19 shown on the prints is out of allowed plumb tolerance at the front CMU wall. 5. Install hold down strap at the overframing ridge board end where it meets the roof below. 6. Front entry shearwall has not been anchor bolted down to the CMU wall below. 7. MGT anchor rear back room right side of the building needs to be nailed down. Stopped inspection engineering will need to be checked with new engineering packet. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/03/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 12/22/22: INSPECTION STOPPED! NOT READY! *** Framing contractor is still working on framing. **** Roof sheathing bump checked & walked - Approved 1/3/23 Down cells passed. As noted above roof passed and may be covered. 1. The Truss Page 10 of the prints and the engineering packet do not match. Truss on print are lettered T trusses in packet are letter A. 2. The piggy back trusses are missing hold down anchors. 3. Truss T-11 shown on the prints is missing a hold down anchor ans well as the small jack trusses. The wall needs to have anchors as it is part of the support / bearing wall holding the trusses. 4. Truss T-19 shown on the prints is out of allowed plumb tolerance at the front CMU wall. 5. Install hold down strap at the overframing ridge board end where it meets the roof below. 6. Front entry shearwall has not been anchor bolted down to the CMU wall below. 7. MGT anchor rear back room right side of the building needs to be nailed down. Stopped inspection engineering will need to be checked with new engineering packet. | |||
| WALL SHEATHING | 12/22/2022 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/22/2022 | Disapproved - NO FEE | RSIMS |
| Note: 12/22/22: INSPECTION STOPPED! NOT READY! *** Framing contractor is still working on framing. **** Roof sheathing bump checked & walked - Approved | |||
| TIE BEAM / LINTEL | 12/05/2022 | APPROVED | MKRASKI |
| FOUND SURVEY APPROVED (OFFICE) | 11/29/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/16/2022 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/25/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/26/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/06/2023 | 01/09/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/28/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2022 | 08/23/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/23/2022 | 08/25/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/16/2022 | 08/16/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please change location on ac pad on landscape and floor plan to match site plan | |||
| SW1 | COMPLETE | 08/16/2022 | 08/23/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/16/2022 | 08/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/08/2022 | 08/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/08/2022 | 08/10/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/08/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/08/2022 | 08/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/08/2022 | 08/15/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE THE LEFT PROPERTY LINE A COMMON | |||
| ZON | HOLD | 08/08/2022 | 08/09/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad encroaching in the 5ft utility easement | |||
| SWALE | COMPLETE | 08/08/2022 | 11/30/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/13/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/13/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/13/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/12/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/12/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 09/12/2022 |
| SEWER CREDIT | (¤1,147.00) | 09/12/2022 |
| SEWER INSPECTION | ¤25.00 | 09/12/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 09/12/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 09/12/2022 |
| SITE PLAN 30 | ¤30.00 | 09/12/2022 |
| WATER-METER | ¤467.09 | 09/12/2022 |
| WATER- TURN ON | ¤25.00 | 09/12/2022 |
| WATER- TURN ON | ¤25.00 | 09/12/2022 |
| ADJUSTMENT 50% | (¤721.00) | 09/12/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/12/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 09/12/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 09/12/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/12/2022 |
| CONNECTION FEES | ¤1,077.88 | 09/12/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 09/12/2022 |
| IMPACT FEE FIRE | ¤388.65 | 09/12/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 09/12/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/12/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 09/12/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/12/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/12/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 09/12/2022 |
| SURCHARGE FS 533.721 | ¤4.50 | 09/12/2022 |
| SURCHARGE - FS 468.631 | ¤6.75 | 09/12/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/12/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/12/2022 |
| SW ENG PRE APRON | ¤30.00 | 09/12/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,516.03 |