I want to search for...

Permit #2022080415

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00410-0110
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00410
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 631-929-5500
Location Address: 14 SERGEANT CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/30/2023
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: WICKAPOGUE RE DEVELOPMENT LLC

Address

STE 110

GREENWOOD VILLAGE, CO 80111

Address

5460 S QUEBEC ST

GREENWOOD VILLAGE, CO 80111

Lot: 0110
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/02/2023 FINAL APPROVED BTAYLOR
Note: 7/28/2023 - PREVIOUS INSPECTION NOTES 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items.
BLD - BUILDING FINAL 07/28/2023 CANCELLED BY APPLICANT RSIMS
Note: 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items.
ROW - STORMWATER FINAL 07/28/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 07/28/2023 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 07/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 06/02/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 2-28-23 1. Emailed FPL at 2:38. 6-2-23 1. Emailed FPL at 2:47
GRAVITY SEWER TEST 05/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 05/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 05/09/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 04/25/2023 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY.
LATH/BRICK/ WATER BARRIER 03/29/2023 APPROVED BTAYLOR
PEP TANK INSTALLATION REQUEST 03/24/2023 APPROVED - AS NOTED TSCHWEERS
Note: 3/27/2023 Gravity sewer no need for pep tank.
INSULATION 03/22/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 3-20-23 1. Front door not installed.
ALL ROUGH 03/20/2023 APPROVED - AS NOTED BTAYLOR
Note: 3-20-23 1. Front door not installed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2023 APPROVED - AS NOTED BTAYLOR
Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-7-23 1. No plans in house or in box. 2. Engineering is complete. 3-8-23 1. Missing strap on double truss on left side of house. Circled on plans
ROOF VALLEY & METAL 03/08/2023 APPROVED BTAYLOR
Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 3/6/2023 - PREVIOUS INSPECTION NOTES 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-6-23 1. Need to have roof braces approved before moving to this inspection. 3-7-23 1. Need to have roof braces approved before moving to this inspection.
ROOF VALLEY & METAL 03/07/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 3/6/2023 - PREVIOUS INSPECTION NOTES 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-6-23 1. Need to have roof braces approved before moving to this inspection. 3-7-23 1. Need to have roof braces approved before moving to this inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/07/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-7-23 1. No plans in house or in box. 2. Engineering is complete.
ROOF VALLEY & METAL 03/06/2023 Disapproved - NO FEE BTAYLOR
Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-6-23 1. Need to have roof braces approved before moving to this inspection.
WALL SHEATHING 03/06/2023 APPROVED BTAYLOR
Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/02/2023 Disapproved - NO FEE BTAYLOR
Note: 3-2-23 1. No plans or engineering packet in box.
WALL SHEATHING 03/02/2023 Disapproved - NO FEE BTAYLOR
Note: 3-2-23 1. No plans or engineering packet in box.
ROOF VALLEY & METAL 03/02/2023 Disapproved - NO FEE BTAYLOR
Note: 3-2-23 1. No plans or engineering packet in box.
FOUND SURVEY APPROVED (OFFICE) 03/01/2023 APPROVED TBAKER
ELECTRIC-TUG 02/28/2023 APPROVED - AS NOTED BTAYLOR
Note: 2-28-23 1. Emailed FPL at 2:38.
TIE BEAM / LINTEL 02/14/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 02/03/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/01/2023 APPROVED MGIBSON
Note: 1/31/2023 - PREVIOUS INSPECTION NOTES NOT HOLDING HEAD TEST
PLUMBING 1ST ROUGH UNDERGROUND 01/31/2023 Disapproved -FEE REQUIRED MGIBSON
Note: NOT HOLDING HEAD TEST
WATER METER INSTALLATION REQUEST 01/31/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/01/2023 03/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/01/2023 03/01/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/01/2023 03/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/01/2023 03/01/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 02/27/2023 02/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/24/2022 08/31/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/24/2022 08/24/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/24/2022 08/25/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 08/08/2022 08/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/08/2022 08/10/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 08/08/2022 08/08/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/08/2022 08/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/08/2022 08/12/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/08/2022 08/09/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 08/08/2022 08/15/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE A COMMON SWALE ON LEFT PROPERTY LINE
ZON COMPLETE 08/08/2022 08/08/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 08/08/2022 11/30/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 08/03/2023
PLAN REVIEW - REVISION ¤32.50 08/03/2023
REINSPECTION RESIDENTIAL ¤40.00 08/03/2023
REINSPECTION RESIDENTIAL ¤40.00 08/03/2023
REINSPECTION RESIDENTIAL ¤40.00 08/03/2023
CONNECTION FEES ¤1,166.26 01/30/2023
CONTRACTOR CHANGE ¤20.00 01/30/2023
WATER- TURN ON ¤25.00 01/30/2023
ADJUSTMENT 50% (¤405.07) 01/30/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/30/2023
INSPECTION - RESIDENTIAL ¤607.75 01/30/2023
PLAN REVIEW - RESIDENTIAL ¤172.38 01/30/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/30/2023
IMPACT FEE FIRE ¤388.65 01/30/2023
IMPACT FEE PARKS ¤1,455.13 01/30/2023
IMPACT FEE SCHOOL ¤3,600.00 01/30/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 01/30/2023
WATER -IRRIGATION INSPECTION ¤25.00 01/30/2023
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/30/2023
SURCHARGE FS 533.721 ¤2.69 01/30/2023
SURCHARGE - FS 468.631 ¤4.04 01/30/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/30/2023
SW ENG INSPECTION 80 ¤80.00 01/30/2023
SW ENG PRE APRON ¤30.00 01/30/2023
SW ENG - REVIEW 20 ¤20.00 01/30/2023
SW ENG RES REVIEW 200 ¤200.00 01/30/2023
3% TRANS IMPACT FEE CREDIT (¤52.92) 01/30/2023
SEWER CREDIT (¤2,291.75) 01/30/2023
SEWER INSPECTION ¤25.00 01/30/2023
SEWER CAPITAL FACILITY ¤5,344.82 01/30/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 01/30/2023
SITE PLAN 30 ¤30.00 01/30/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,302.05