I want to search for...
Permit #2022080415
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00410-0110 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00410 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 631-929-5500 |
| Location Address: 14 SERGEANT CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/30/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOGUE RE DEVELOPMENT LLC |
|
Address STE 110 GREENWOOD VILLAGE, CO 80111 |
|
Address 5460 S QUEBEC ST GREENWOOD VILLAGE, CO 80111 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/02/2023 | FINAL APPROVED | BTAYLOR |
| Note: 7/28/2023 - PREVIOUS INSPECTION NOTES 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items. | |||
| BLD - BUILDING FINAL | 07/28/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items. | |||
| ROW - STORMWATER FINAL | 07/28/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/28/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 06/02/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 2-28-23 1. Emailed FPL at 2:38. 6-2-23 1. Emailed FPL at 2:47 | |||
| GRAVITY SEWER TEST | 05/09/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 05/09/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 05/09/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY. | |||
| LATH/BRICK/ WATER BARRIER | 03/29/2023 | APPROVED | BTAYLOR |
| PEP TANK INSTALLATION REQUEST | 03/24/2023 | APPROVED - AS NOTED | TSCHWEERS |
| Note: 3/27/2023 Gravity sewer no need for pep tank. | |||
| INSULATION | 03/22/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 3-20-23 1. Front door not installed. | |||
| ALL ROUGH | 03/20/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-20-23 1. Front door not installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-7-23 1. No plans in house or in box. 2. Engineering is complete. 3-8-23 1. Missing strap on double truss on left side of house. Circled on plans | |||
| ROOF VALLEY & METAL | 03/08/2023 | APPROVED | BTAYLOR |
| Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 3/6/2023 - PREVIOUS INSPECTION NOTES 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-6-23 1. Need to have roof braces approved before moving to this inspection. 3-7-23 1. Need to have roof braces approved before moving to this inspection. | |||
| ROOF VALLEY & METAL | 03/07/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 3/6/2023 - PREVIOUS INSPECTION NOTES 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-6-23 1. Need to have roof braces approved before moving to this inspection. 3-7-23 1. Need to have roof braces approved before moving to this inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-7-23 1. No plans in house or in box. 2. Engineering is complete. | |||
| ROOF VALLEY & METAL | 03/06/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. 3-6-23 1. Need to have roof braces approved before moving to this inspection. | |||
| WALL SHEATHING | 03/06/2023 | APPROVED | BTAYLOR |
| Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3-2-23 1. No plans or engineering packet in box. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-2-23 1. No plans or engineering packet in box. | |||
| WALL SHEATHING | 03/02/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-2-23 1. No plans or engineering packet in box. | |||
| ROOF VALLEY & METAL | 03/02/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-2-23 1. No plans or engineering packet in box. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/01/2023 | APPROVED | TBAKER |
| ELECTRIC-TUG | 02/28/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2-28-23 1. Emailed FPL at 2:38. | |||
| TIE BEAM / LINTEL | 02/14/2023 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 02/03/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/01/2023 | APPROVED | MGIBSON |
| Note: 1/31/2023 - PREVIOUS INSPECTION NOTES NOT HOLDING HEAD TEST | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/31/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NOT HOLDING HEAD TEST | |||
| WATER METER INSTALLATION REQUEST | 01/31/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/01/2023 | 03/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/01/2023 | 03/01/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/01/2023 | 03/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/01/2023 | 03/01/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/27/2023 | 02/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/24/2022 | 08/31/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/24/2022 | 08/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/08/2022 | 08/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/08/2022 | 08/10/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/08/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/08/2022 | 08/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/08/2022 | 08/15/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE A COMMON SWALE ON LEFT PROPERTY LINE | |||
| ZON | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/08/2022 | 11/30/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 08/03/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/03/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/30/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/30/2023 |
| WATER- TURN ON | ¤25.00 | 01/30/2023 |
| ADJUSTMENT 50% | (¤405.07) | 01/30/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/30/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 01/30/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 01/30/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/30/2023 |
| IMPACT FEE FIRE | ¤388.65 | 01/30/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/30/2023 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/30/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/30/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/30/2023 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/30/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 01/30/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 01/30/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/30/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/30/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/30/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/30/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/30/2023 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 01/30/2023 |
| SEWER CREDIT | (¤2,291.75) | 01/30/2023 |
| SEWER INSPECTION | ¤25.00 | 01/30/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/30/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/30/2023 |
| SITE PLAN 30 | ¤30.00 | 01/30/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,302.05 |