I want to search for...

Permit #2022080422

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-01540-0080
CONDITIONED SPACE: 2342 sqft
GARAGE: 583 sqft
OPENED PORCH (WITH ROOF) : 317 sqft
Total Square Footage: 3242 sqft
Block: 01540
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 904-338-1270
Location Address: 26 LEAVER DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/11/2022
NOC: RECORDED
Applicant name: DAVID VINCENT KIMBLE
Owner: RHODES GENE A & ELNORA H H&W

Address

12 LEWISDALE LANE

PALM COAST, FL 32137

Lot: 0080
Contracted Stated Job Value: ¤280,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

EVERLAST HOMES, INC
Status Location Address State License Number Phone
ACTIVE

13245 ATLANTIC BLVD

JACKSONVILLE, FL 32246

CBC1260552 (Exp: 08/31/2028) 904-545-6476

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
DEBORAH MAXINE JACKSON
Status Location Address State License Number Phone
ACTIVE

1165 SOUTH 5TH

MACCLENNY, FL 32063

CCC1330709 (Exp: 08/31/2026) 904-322-9409

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/19/2023 Approval - Private Provider PPROVIDER
ROW - STORMWATER FINAL 10/19/2023 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 10/18/2023 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 10/18/2023 CANCELLED BY APPLICANT EMADISON
Note: Inspector Notes from Inspection 9465 ** 10/16/23 BUILDER NEEDS TO MATCH GRADE IN ROAD SIDE SWALE ON RIGHT SIDE WHERE AT PROPERTY LINE ** LEFT REAR OF YARD HAS ERODED NEED TO FILL WITH COMPACTED MATERIAL AND SOD
U-CROSS CONNECTION 10/18/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 10/18/2023 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/16/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/16/2023 APPROVED - AS NOTED EMADISON
Note: ** 10/16/23 BUILDER NEEDS TO MATCH GRADE IN ROAD SIDE SWALE ON RIGHT SIDE WHERE AT PROPERTY LINE ** LEFT REAR OF YARD HAS ERODED NEED TO FILL WITH COMPACTED MATERIAL AND SOD
ELECTRIC - EARLY POWER 08/25/2023 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 08/11/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
U - SEWER TIE IN 08/08/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 08/08/2023 Approval - Private Provider PPROVIDER
U - SEWER TIE IN 06/28/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 06/27/2023 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 06/08/2023 APPROVED CSTONE
INSULATION 05/22/2023 Approval - Private Provider PPROVIDER
INSULATION 05/18/2023 CANCELLED BY APPLICANT WEB
ALL ROUGH 05/15/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 05/11/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/11/2023 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 05/11/2023 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 03/29/2023 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 01/11/2023 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 01/05/2023 APPROVED TBAKER
MONOLITHIC SLAB 12/02/2022 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 11/23/2022 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 10/12/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 10/18/2023 10/18/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Blower door not complete. Missing signature.
ENGIN1 COMPLETE 01/05/2023 01/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/05/2023 01/05/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/17/2022 08/18/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 08/17/2022 08/24/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/17/2022 08/17/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 08/08/2022 08/11/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/08/2022 08/08/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 08/08/2022 08/08/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/08/2022 08/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/08/2022 08/12/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/08/2022 08/09/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 08/08/2022 08/15/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE RIGHT PROPERTY LINE A COMMON SWALE
ZON HOLD 08/08/2022 08/09/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Driveway Turn around: Turn around dimensions allowed are 9' x 18' please adjust propsed tuen around to meet the land development code.
SWALE COMPLETE 08/08/2022 11/30/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤25.00 10/11/2022
ADJUSTMENT 50% (¤130.83) 10/11/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/11/2022
ADMINISTRATIVE - RESID PP ¤225.00 10/11/2022
PLAN REVIEW - RESIDENTIAL ¤231.66 10/11/2022
CONNECTION FEES ¤1,077.88 10/11/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/11/2022
IMPACT FEE FIRE ¤388.65 10/11/2022
IMPACT FEE PARKS ¤1,455.13 10/11/2022
IMPACT FEE SCHOOL ¤3,600.00 10/11/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/11/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/11/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/11/2022
SURCHARGE FS 533.721 ¤2.00 10/11/2022
SURCHARGE - FS 468.631 ¤2.38 10/11/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/11/2022
SW ENG INSPECTION 80 ¤80.00 10/11/2022
SW ENG PRE APRON ¤30.00 10/11/2022
SW ENG - REVIEW 20 ¤20.00 10/11/2022
SW ENG RES REVIEW 200 ¤200.00 10/11/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/11/2022
SEWER CREDIT (¤2,465.75) 10/11/2022
SEWER INSPECTION ¤25.00 10/11/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/11/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/11/2022
SITE PLAN 30 ¤30.00 10/11/2022
Fees Total Due: ¤0.00 Total Paid: ¤15,093.15