Permit #2022080423
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00090-0250 |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 396 sqft |
| Total Square Footage: 1611 sqft |
| Block: 00090 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 407-432-2344 |
| Location Address: 4 SENATOR CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/04/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL NORTH NAPLES, FL 34103 |
| Lot: 0250 |
| Contracted Stated Job Value: ¤198,291.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/04/2023 | FINAL APPROVED | BTAYLOR |
| Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 5-1-23 1. No energy cals on site.... | |||
| ROW - STORMWATER FINAL | 05/02/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTION MADE THE TIRES WAS THERE BEFORE CONSTRUCTION CM SHOW PHOTOS -------------------------------------------------------------------- 5/1/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF THE CULVERT PIPE 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS FROM THE DRIVEWAY | |||
| U -UTILITY RESIDENTIAL FINAL | 05/01/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 05/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT OUT OF THE CULVERT PIPE 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS FROM THE DRIVEWAY | |||
| BLD - BUILDING FINAL | 05/01/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 5-1-23 1. No energy cals on site.... | |||
| ROW - FINAL APRON (AFTER POUR) | 05/01/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/28/2023 | APPROVED | GBERTOLA |
| Note: | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/24/2023 | APPROVED | PFLANAGAN |
| Note: 4/21/2023 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATION AGAINST THE HOME NEED TO 4" BELOW FFE FOR A CONCRETE BLOCK HOME AND 6" FOR A WOOD FRAME HOME. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/24/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO LOWER THE SWALE ON LEFT SIDE OF DRIVEWAY SO WATER CAN FLOW FROM PIPE TO PIPE 2) NEED TO FIX THE SWALE AT THE VACANT ON THE RIGHT SO WATER CAN FLOW NEED TO MATCH EXISTING GRADE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/21/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALL SOD ELEVATION AGAINST THE HOME NEED TO 4" BELOW FFE FOR A CONCRETE BLOCK HOME AND 6" FOR A WOOD FRAME HOME. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2023 | APPROVED | EMADISON |
| Note: ** 03/28/23 CORRECTIONS MADE READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 3/24/2023 - PREVIOUS INSPECTION NOTES ** 03/24/23 ** NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON NEED TO MEASURE AT ROADS EDGE CHECK ELEVATIONS NEEDS TO BE A MINIMUM OF 6 INCHES IN APRON...... _____________________________________________________________________________________________________________________ 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/22/23 CULVERT PIPE IS OKAY WHERE IT HAS BEEN SET CONSULTED WITH G.BERTOLA ** CULVERT ELEVATION IS GOOD AT THE TIME OF THIS INSPECTION ** FORM BOARDS NEEED TO BE RESET ** NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON ** NEED TO CHIP AWAY OVERPOUR OF CONCRETE AT GARAGE OPENING NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE ENTIRE DRIVEWAY POUR AREA. _________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 CULVERT PIPE IS TO CLOSE TO EDGE OF ROAD MITERED ENDS NEED TO BE SET A 5 FEET FROM THE EDGE OF ROAD TO CENTER OF CULVERT. ALIGN WITH CULVERT ON LEFT SIDE. ** BE SURE TO COMPACT MATERIAL AFTER CULVERT IS RESET. ** OVER POUR OF COCRETE NEEDS TO BE CHIPPED AWAY AT GARAGE OPENING THERE MUST BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW | |||
| U-CROSS CONNECTION | 03/28/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/24/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/24/23 ** NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON NEED TO MEASURE AT ROADS EDGE CHECK ELEVATIONS NEEDS TO BE A MINIMUM OF 6 INCHES IN APRON...... _____________________________________________________________________________________________________________________ 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/22/23 CULVERT PIPE IS OKAY WHERE IT HAS BEEN SET CONSULTED WITH G.BERTOLA ** CULVERT ELEVATION IS GOOD AT THE TIME OF THIS INSPECTION ** FORM BOARDS NEEED TO BE RESET ** NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON ** NEED TO CHIP AWAY OVERPOUR OF CONCRETE AT GARAGE OPENING NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE ENTIRE DRIVEWAY POUR AREA. _________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 CULVERT PIPE IS TO CLOSE TO EDGE OF ROAD MITERED ENDS NEED TO BE SET A 5 FEET FROM THE EDGE OF ROAD TO CENTER OF CULVERT. ALIGN WITH CULVERT ON LEFT SIDE. ** BE SURE TO COMPACT MATERIAL AFTER CULVERT IS RESET. ** OVER POUR OF COCRETE NEEDS TO BE CHIPPED AWAY AT GARAGE OPENING THERE MUST BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/22/23 CULVERT PIPE IS OKAY WHERE IT HAS BEEN SET CONSULTED WITH G.BERTOLA ** CULVERT ELEVATION IS GOOD AT THE TIME OF THIS INSPECTION ** FORM BOARDS NEEED TO BE RESET ** NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON ** NEED TO CHIP AWAY OVERPOUR OF CONCRETE AT GARAGE OPENING NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE ENTIRE DRIVEWAY POUR AREA. _________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 CULVERT PIPE IS TO CLOSE TO EDGE OF ROAD MITERED ENDS NEED TO BE SET A 5 FEET FROM THE EDGE OF ROAD TO CENTER OF CULVERT. ALIGN WITH CULVERT ON LEFT SIDE. ** BE SURE TO COMPACT MATERIAL AFTER CULVERT IS RESET. ** OVER POUR OF COCRETE NEEDS TO BE CHIPPED AWAY AT GARAGE OPENING THERE MUST BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/20/23 CULVERT PIPE IS TO CLOSE TO EDGE OF ROAD MITERED ENDS NEED TO BE SET A 5 FEET FROM THE EDGE OF ROAD TO CENTER OF CULVERT. ALIGN WITH CULVERT ON LEFT SIDE. ** BE SURE TO COMPACT MATERIAL AFTER CULVERT IS RESET. ** OVER POUR OF COCRETE NEEDS TO BE CHIPPED AWAY AT GARAGE OPENING THERE MUST BE A MINIMUM OF 4 INCHES OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW | |||
| ELECTRIC - EARLY POWER | 03/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-14-23 1. Emailed FPL at 1:45. | |||
| GRAVITY SEWER TEST | 03/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2060 PROVIDE PORTABLE RESTROOM BEFORE SCHEDULING MONOLITHIC SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 03/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 02/22/2023 | APPROVED - AS NOTED | TSCHWEERS |
| Note: Gravity sewer no pep tank needed. | |||
| U-CROSS CONNECTION | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2060 PROVIDE PORTABLE RESTROOM BEFORE SCHEDULING MONOLITHIC SLAB INSPECTION | |||
| INSULATION | 02/14/2023 | APPROVED | BTAYLOR |
| Note: 2/13/2023 - PREVIOUS INSPECTION NOTES 2/13/2023- PREVIOUS INSPECTION NOTES/ Bathroom exhaust vent ducts not attached. 2/10/2023 - PREVIOUS INSPECTION NOTES 2/9/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 2-2-23 1. Bathroom exhaust vent ducts not attached. | |||
| INSULATION | 02/13/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 2/13/2023- PREVIOUS INSPECTION NOTES/ Bathroom exhaust vent ducts not attached. 2/10/2023 - PREVIOUS INSPECTION NOTES 2/9/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 2-2-23 1. Bathroom exhaust vent ducts not attached. | |||
| INSULATION | 02/10/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 2/9/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 2-2-23 1. Bathroom exhaust vent ducts not attached. | |||
| INSULATION | 02/09/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 2-2-23 1. Bathroom exhaust vent ducts not attached. | |||
| ALL ROUGH | 02/02/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2-2-23 1. Bathroom exhaust vent ducts not attached. | |||
| LATH/BRICK/ WATER BARRIER | 01/11/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 01/04/2023 | APPROVED | BTAYLOR |
| Note: 12/15/2022 - PREVIOUS INSPECTION NOTES 12-15-22 Not even started. | |||
| ELECTRIC-TUG | 12/15/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 12-15-22 Not even started. | |||
| ROOF VALLEY & METAL | 12/12/2022 | APPROVED | BTAYLOR |
| WALL SHEATHING | 12/05/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/05/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 11/28/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/22/2022 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 11/14/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/08/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: PROVIDE PORTABLE RESTROOM BEFORE SCHEDULING MONOLITHIC SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 11/01/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2022 | 11/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/15/2022 | 11/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/07/2022 | 09/14/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/07/2022 | 09/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/07/2022 | 09/08/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/08/2022 | 08/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/08/2022 | 08/10/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/08/2022 | 08/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/08/2022 | 08/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/08/2022 | 08/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/08/2022 | 08/15/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE SOD ELEVATIONS ON ALL FOUR CORNERS OF HOUSE | |||
| ZON | COMPLETE | 08/08/2022 | 08/09/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/08/2022 | 11/30/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONNECTION FEES | ¤1,077.88 | 10/04/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/04/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/04/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/04/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/04/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/04/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/04/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/04/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/04/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/04/2022 |
| SURCHARGE FS 533.721 | ¤2.47 | 10/04/2022 |
| SURCHARGE - FS 468.631 | ¤3.71 | 10/04/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/04/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/04/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/04/2022 |
| WATER- TURN ON | ¤25.00 | 10/04/2022 |
| ADJUSTMENT 50% | (¤366.24) | 10/04/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/04/2022 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 10/04/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 10/04/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/04/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/04/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/04/2022 |
| SEWER CREDIT | (¤1,390.00) | 10/04/2022 |
| SEWER INSPECTION | ¤25.00 | 10/04/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/04/2022 |
| WATER CREDIT | (¤1,733.75) | 10/04/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/04/2022 |
| SITE PLAN 30 | ¤30.00 | 10/04/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,749.85 |