I want to search for...
Permit #2022080662
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00490-0240 |
| CONDITIONED SPACE: 2091 sqft |
| GARAGE: 770 sqft |
| OPENED PORCH (WITH ROOF) : 371 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 3304 sqft |
| Block: 00490 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: (386) 445-2222 |
| Location Address: 33 WOODBURY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2022 |
| NOC: RECORDED |
| Applicant name: MICHAEL STEPHAN MULLEN |
| Owner: MULLEN CONSTRUCTION COMPANY INC |
|
Address UNIT13 BUNNELL, FL 32110 |
|
Address 1 ENTERPRISE DR BUNNELL, FL 32110 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
TOWN & COUNTRY HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 Enterprise Drive Bunnell, FL 32110 |
CGC049972 (Exp: 08/31/2026) | (386) 445-2222 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/14/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 02/12/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Weather proof cover required for lani future fixture 2. LOcking caps missing on condensing unit 3. Porta jon must be removed before final 4. Kitchen sink has no hot water 5. Garage door bucks per detail require 2'' washers with 3/8''s dynabolts | |||
| U-CROSS CONNECTION | 02/09/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: no PVB on irrigation that is also connected to potable water line | |||
| U-CROSS CONNECTION | 02/09/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: CORRECTIN- pvb was in rear side of house-explained to building super Michael to make sure PVB is at point of seperation from house potable -dont want any sprinkler headsin front of PVB otherwise house potable is NT PROTECTED 2/9/2024 - PREVIOUS INSPECTION NOTES no PVB on irrigation that is also connected to potable water line | |||
| ROW - STORMWATER FINAL | 02/09/2024 | APPROVED | TPOLACEK |
| Note: 02/09/24 CORRECTION WERE MADE TO LEFT SIDE DRAINAGE WILL WORK NOW. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/09/2024 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/06/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/06/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/05/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/02/2024 | APPROVED | FSLADISH |
| Note: 1/2/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 12/28/2023 - PREVIOUS INSPECTION NOTES 12/27/2023 - PREVIOUS INSPECTION NOTES 12/27/23 CREW IS STILL FORMING UP BOARDS. SITE NOT READY FOR INSPECTION. PLEASE CALL IN FOR NEW INSPECTION WHEN READY. PLEASE ENSURE ALL WATER IS PUMPED OUT OF POUR AREA PRIOR TO INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/28/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 12/27/2023 - PREVIOUS INSPECTION NOTES 12/27/23 CREW IS STILL FORMING UP BOARDS. SITE NOT READY FOR INSPECTION. PLEASE CALL IN FOR NEW INSPECTION WHEN READY. PLEASE ENSURE ALL WATER IS PUMPED OUT OF POUR AREA PRIOR TO INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/27/2023 | Disapproved - NO FEE | TPOLACEK |
| Note: 12/27/23 CREW IS STILL FORMING UP BOARDS. SITE NOT READY FOR INSPECTION. PLEASE CALL IN FOR NEW INSPECTION WHEN READY. PLEASE ENSURE ALL WATER IS PUMPED OUT OF POUR AREA PRIOR TO INSPECTION. | |||
| ELECTRIC - EARLY POWER | 12/27/2023 | APPROVED | LMILLER |
| LATH/BRICK/ WATER BARRIER | 12/01/2023 | APPROVED | FWILLIS |
| INSULATION | 11/27/2023 | APPROVED | FWILLIS |
| ALL ROUGH | 11/20/2023 | APPROVED | JSTEWART |
| Note: 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 1. No approved duct layout onsite 2. Washer stack for drain requires nail plate to extend 2'' below top plate 3. Island power chase requires proper nail plate (both ends of chase 4. Front spare bedroom window is missing anchor 5. Slider near masterbedroom has anchor that is not fully embedded 6. Slab needs to be sealed in kitchen wall 11/7/2023 - PREVIOUS INSPECTION NOTES 1. 4 square metalic boxes need to have covers remived to see bond screw if joints are made 2. E-cals appear to be for 31 woodbury, the one was whited out and wrote a 3 in place of it 3. E-cals do not show duct layout Stopped inspection in garage must have approved e-cals on site. | |||
| ALL ROUGH | 11/17/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 11/17/23 1. No approved duct layout onsite 2. Washer stack for drain requires nail plate to extend 2'' below top plate 3. Island power chase requires proper nail plate (both ends of chase 4. Front spare bedroom window is missing anchor 5. Slider near masterbedroom has anchor that is not fully embedded 6. Slab needs to be sealed in kitchen wall 11/7/2023 - PREVIOUS INSPECTION NOTES 1. 4 square metalic boxes need to have covers remived to see bond screw if joints are made 2. E-cals appear to be for 31 woodbury, the one was whited out and wrote a 3 in place of it 3. E-cals do not show duct layout Stopped inspection in garage must have approved e-cals on site. | |||
| ALL ROUGH | 11/07/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. 4 square metalic boxes need to have covers remived to see bond screw if joints are made 2. E-cals appear to be for 31 woodbury, the one was whited out and wrote a 3 in place of it 3. E-cals do not show duct layout Stopped inspection in garage must have approved e-cals on site. | |||
| ELECTRIC-TUG | 11/06/2023 | APPROVED | RMARTIN |
| WALL SHEATHING | 03/15/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/15/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 2/28/2023 - PREVIOUS INSPECTION NOTES 2/28/23 Must repair all previous items before calling in reinspection 1. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil 2. Anchor missing by door leading into home from garage Stopped inspection did not check engineering 2/15/2023 - PREVIOUS INSPECTION NOTES 2/15/23 1. Load bearing wood frame wall attachment is required to be 1/2'' anchors not tap-cons. The cornor wall attaches to was not poured, super is getting the corner poured solid 2. Strap missing on Truss CJ02 over master bathroom marked on print 3. Can not see strapping of trusses over front entryway 4. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil Did not check truss engineering 1/30/2023 - PREVIOUS INSPECTION NOTES Roof sheathing only inspected, added roof sheathing and passed inspection so roof can be dried in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/15/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 3/15/23 Truss T35 and T36 missing engineering, check on next inspection New inspection due to canceled inspection 2/28/2023 - PREVIOUS INSPECTION NOTES 2/28/23 Must repair all previous items before calling in reinspection 1. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil 2. Anchor missing by door leading into home from garage Stopped inspection did not check engineering 2/15/2023 - PREVIOUS INSPECTION NOTES 2/15/23 1. Load bearing wood frame wall attachment is required to be 1/2'' anchors not tap-cons. The cornor wall attaches to was not poured, super is getting the corner poured solid 2. Strap missing on Truss CJ02 over master bathroom marked on print 3. Can not see strapping of trusses over front entryway 4. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil Did not check truss engineering 1/30/2023 - PREVIOUS INSPECTION NOTES Roof sheathing only inspected, added roof sheathing and passed inspection so roof can be dried in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/28/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/28/23 Must repair all previous items before calling in reinspection 1. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil 2. Anchor missing by door leading into home from garage Stopped inspection did not check engineering 2/15/2023 - PREVIOUS INSPECTION NOTES 2/15/23 1. Load bearing wood frame wall attachment is required to be 1/2'' anchors not tap-cons. The cornor wall attaches to was not poured, super is getting the corner poured solid 2. Strap missing on Truss CJ02 over master bathroom marked on print 3. Can not see strapping of trusses over front entryway 4. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil Did not check truss engineering 1/30/2023 - PREVIOUS INSPECTION NOTES Roof sheathing only inspected, added roof sheathing and passed inspection so roof can be dried in. | |||
| ROOF VALLEY & METAL | 02/28/2023 | APPROVED | MKRASKI |
| Note: 2/22/2023 - PREVIOUS INSPECTION NOTES 2/23/22 No contractor on site to demo shingles 2/21/2023 - PREVIOUS INSPECTION NOTES 2/15/2023 - PREVIOUS INSPECTION NOTES Roof already shingled, will need to meet contractor onsite to demo some areas to see under layment, drip edge, valleys etc. | |||
| ROOF VALLEY & METAL | 02/22/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 2/23/22 No contractor on site to demo shingles 2/21/2023 - PREVIOUS INSPECTION NOTES 2/15/2023 - PREVIOUS INSPECTION NOTES Roof already shingled, will need to meet contractor onsite to demo some areas to see under layment, drip edge, valleys etc. | |||
| ROOF VALLEY & METAL | 02/21/2023 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 2/15/2023 - PREVIOUS INSPECTION NOTES Roof already shingled, will need to meet contractor onsite to demo some areas to see under layment, drip edge, valleys etc. | |||
| ROOF VALLEY & METAL | 02/15/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Roof already shingled, will need to meet contractor onsite to demo some areas to see under layment, drip edge, valleys etc. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/15/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 2/15/23 1. Load bearing wood frame wall attachment is required to be 1/2'' anchors not tap-cons. The cornor wall attaches to was not poured, super is getting the corner poured solid 2. Strap missing on Truss CJ02 over master bathroom marked on print 3. Can not see strapping of trusses over front entryway 4. Wall in laundry missing anchor (load bearing) max 32'' O.C. for anchors per deatil Did not check truss engineering 1/30/2023 - PREVIOUS INSPECTION NOTES Roof sheathing only inspected, added roof sheathing and passed inspection so roof can be dried in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/30/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Roof sheathing only inspected, added roof sheathing and passed inspection so roof can be dried in. | |||
| ROOF SHEATHING | 01/30/2023 | APPROVED | MKRASKI |
| TIE BEAM / LINTEL | 12/15/2022 | APPROVED | DCUSHING |
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/17/2022 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/07/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/07/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/07/2022 | APPROVED | CSTONE |
| U - SEWER TIE IN | 10/07/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/14/2023 | 11/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/14/2023 | 11/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/27/2023 | 06/27/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| MECH | COMPLETE | 06/27/2023 | 06/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/09/2023 | 02/14/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/01/2022 | 12/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/01/2022 | 12/01/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/22/2022 | 08/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/12/2022 | 12/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/11/2022 | 08/16/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide Product Approval Numbers for Soffit Material and Truss Plates. | |||
| CUSVC | COMPLETE | 08/11/2022 | 08/15/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 08/11/2022 | 08/11/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 08/11/2022 | 08/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/11/2022 | 08/17/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/11/2022 | 08/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/11/2022 | 08/15/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ZON | COMPLETE | 08/11/2022 | 08/15/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/27/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/27/2024 |
| EXTENSION | ¤40.00 | 02/27/2024 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 08/24/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 08/24/2022 |
| WATER- TURN ON | ¤25.00 | 08/24/2022 |
| ADJUSTMENT 50% | (¤512.73) | 08/24/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/24/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/24/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/24/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/24/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/24/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/24/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/24/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/24/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/24/2022 |
| SURCHARGE FS 533.721 | ¤3.31 | 08/24/2022 |
| SURCHARGE - FS 468.631 | ¤4.97 | 08/24/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/24/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/24/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/24/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/24/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/24/2022 |
| SEWER CREDIT | (¤1,466.00) | 08/24/2022 |
| SEWER INSPECTION | ¤25.00 | 08/24/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/24/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/24/2022 |
| SITE PLAN 30 | ¤30.00 | 08/24/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,451.62 |