Permit #2022080671
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00180-0060 |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| Total Square Footage: 4464 sqft |
| Block: 00180 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 11 SEATTLE TR |
| Type: DU - DUPLEX |
| Issue Date: 08/31/2022 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: RYUMA DMITRY |
|
Address 14004 PALAWAN WAY PH05 MARINA DEL REY, CA 90292 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/11/2024 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 10/30/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 10/26/2023 - PREVIOUS INSPECTION NOTES Sewer Clean outs need trimmed to ground level and caps installed . | |||
| U -UTILITY RESIDENTIAL FINAL | 10/27/2023 | Disapproved - NO FEE | DHANEY |
| Note: Sewer Clean outs need trimmed to ground level and caps installed . | |||
| ROW - FINAL INSPECTION | 10/26/2023 | APPROVED | FSLADISH |
| Note: 10/26/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 10/26/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 10/26/2023 | APPROVED | FSLADISH |
| Note: 10/26/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR HOT PATCH/ROAD REPAIR COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/23/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 CONTRACTOR IS FIXING FORMS AS THE INSPECTION WAS PROFORMED PASSING AS NOTED THAT IS BEING FIXED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POUR CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------- 8/28/2023 - PREVIOUS INSPECTION NOTES 1) THE FORM BOARD ALONG THE ROAD ARE IN THE ROAD WAY NEED TO FIX SO FROMS ARE PARALEL WITH THE ROAD 2) THE CULVERT TO THE RIGHT ON THIS HOME IS NOT PARALEL WITH THE ROAD ----------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/23/2023 | APPROVED | FSLADISH |
| Note: 10/23/23 AT THE TIME OF THIS INSPECTION EVERYTHING LOOKED OK. DRAINAGE WILL WORK AS INDICATED ON THE FINAL SURVEY. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/29/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: CONTRACTOR IS FIXING FORMS AS THE INSPECTION WAS PROFORMED PASSING AS NOTED THAT IS BEING FIXED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POUR CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------- 8/28/2023 - PREVIOUS INSPECTION NOTES 1) THE FORM BOARD ALONG THE ROAD ARE IN THE ROAD WAY NEED TO FIX SO FROMS ARE PARALEL WITH THE ROAD 2) THE CULVERT TO THE RIGHT ON THIS HOME IS NOT PARALEL WITH THE ROAD ----------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/28/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE FORM BOARD ALONG THE ROAD ARE IN THE ROAD WAY NEED TO FIX SO FROMS ARE PARALEL WITH THE ROAD 2) THE CULVERT TO THE RIGHT ON THIS HOME IS NOT PARALEL WITH THE ROAD ----------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/25/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ELECTRIC - EARLY POWER | 08/01/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-1-23 1. Emailed FPL at 1:33. | |||
| GRAVITY SEWER TEST | 07/14/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 07/14/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/15/2023 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 05/30/2023 | APPROVED | BTAYLOR |
| INSULATION | 05/30/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 05/26/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 05/22/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 04/17/2023 | APPROVED | TSTAUFFACHER |
| FIREWALL FINAL | 04/12/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 04/12/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/12/2023 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 04/10/2023 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 11/21/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/10/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/05/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/06/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/05/2024 | 01/10/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/22/2023 | 05/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/22/2023 | 05/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/22/2023 | 05/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/22/2023 | 05/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/22/2023 | 05/23/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/22/2023 | 05/22/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/29/2022 | 08/29/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/19/2022 | 08/19/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Front elevation identical to 9 Seattle Trail. | |||
| BLD | COMPLETE | 08/11/2022 | 08/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 08/11/2022 | 08/11/2022 |
| Note: Held By: LISA ASBILL - - lasbill@palmcoastgov.com WRONG ADDRESS ON APPLICATION | |||
| ELEC | COMPLETE | 08/11/2022 | 08/11/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/11/2022 | 08/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/11/2022 | 08/15/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/11/2022 | 08/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/11/2022 | 08/17/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE A COMMON SWALE ON RIGHT SIDE IF ALL POSSIBLE | |||
| ZON | HOLD | 08/11/2022 | 08/12/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan has the Mechanical equiptment on the sides of the home. Site plan and floor plan show the AC in the rear of the home. | |||
| SWALE | COMPLETE | 08/11/2022 | 12/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/11/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/25/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/25/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/25/2023 |
| WATER- TURN ON | ¤50.00 | 08/31/2022 |
| ADJUSTMENT 50% | (¤729.83) | 08/31/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/31/2022 |
| INSPECTION - RESIDENTIAL | ¤1,113.75 | 08/31/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤315.90 | 08/31/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/31/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/31/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 08/31/2022 |
| SEWER CREDIT | (¤1,700.00) | 08/31/2022 |
| SEWER INSPECTION | ¤25.00 | 08/31/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 08/31/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 08/31/2022 |
| SITE PLAN 30 | ¤30.00 | 08/31/2022 |
| CONNECTION FEES | ¤2,155.76 | 08/31/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 08/31/2022 |
| IMPACT FEE FIRE | ¤777.30 | 08/31/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 08/31/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 08/31/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 08/31/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 08/31/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 08/31/2022 |
| SURCHARGE FS 533.721 | ¤4.55 | 08/31/2022 |
| SURCHARGE - FS 468.631 | ¤6.83 | 08/31/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/31/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/31/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/31/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤32,424.77 |