Status: COED

Parcel Id: 07-11-31-7059-00180-0050
CONDITIONED SPACE: 1589 sqft
GARAGE: 427 sqft
OPENED PORCH (WITH ROOF) : 163 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
CONDITIONED SPACE: 1589 sqft
GARAGE: 427 sqft
OPENED PORCH (WITH ROOF) : 163 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
Total Square Footage: 4464 sqft
Block: 00180
Subdivision: -
Job Phone: 386-237-1210
Location Address: 9 SEATTLE TR
Type: DU - DUPLEX
Issue Date: 08/31/2022
NOC: RECORDED
Applicant name: ANDREW POPOV
Owner: RYUMA DMITRY

Address

14004 PALAWAN WAY PH05

MARINA DEL REY, CA 90292

Lot: 0050
Contracted Stated Job Value: ¤350,000.00
Job Description: DUPLEX
Type: CN

Contractor

SILVER BREEZE HOMES
Status Location Address State License Number Phone
ACTIVE

1 SEATHORN PATH UNIT A

PALM COAST, FL 32164

RR282812121 (Exp: 08/31/2027) 386-237-7700

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/19/2024 FINAL APPROVED BTAYLOR
BLD - BUILDING FINAL 01/16/2024 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 10/27/2023 FINAL APPROVED DHANEY
ROW - FINAL INSPECTION 10/26/2023 APPROVED FSLADISH
Note: 10/26/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 10/26/2023 APPROVED FSLADISH
Note: 10/26/23 PIPE GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U-CROSS CONNECTION 10/26/2023 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/23/2023 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 CONTRACTOR IS FIXING FORMS AS THE INSPECTION WAS PROFORMED PASSING AS NOTED THAT IS BEING FIXED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POUR CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------------------ 8/29/2023 - PREVIOUS INSPECTION NOTES 8/28/2023 9:12:23 AM- PREVIOUS INSPECTION NOTES THE FORM BOARDS ALONG THE ROAD ARE IN THE ROAD WAY NEED TO PUT THEM ALONG THE EDGE OF PAVEMENT. --------------------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/23/2023 APPROVED FSLADISH
Note: 10/23/23 AT THE TIME OF THIS INSPECTION EVERYTHING LOOKED OK. DRAINAGE WILL WORK AS INDICATED ON THE FINAL SURVEY.
ROW- PRE-APRON (PRE-POUR) 08/30/2023 CANCELLED BY APPLICANT GBERTOLA
Note: 8/28/2023 9:12:23 AM- PREVIOUS INSPECTION NOTES THE FORM BOARDS ALONG THE ROAD ARE IN THE ROAD WAY NEED TO PUT THEM ALONG THE EDGE OF PAVEMENT. --------------------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/29/2023 APPROVED - AS NOTED PFLANAGAN
Note: CONTRACTOR IS FIXING FORMS AS THE INSPECTION WAS PROFORMED PASSING AS NOTED THAT IS BEING FIXED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POUR CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------------------ 8/29/2023 - PREVIOUS INSPECTION NOTES 8/28/2023 9:12:23 AM- PREVIOUS INSPECTION NOTES THE FORM BOARDS ALONG THE ROAD ARE IN THE ROAD WAY NEED TO PUT THEM ALONG THE EDGE OF PAVEMENT. --------------------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/28/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE FORM BOARDS ALONG THE ROAD ARE IN THE ROAD WAY NEED TO PUT THEM ALONG THE EDGE OF PAVEMENT. --------------------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/25/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ELECTRIC - EARLY POWER 08/01/2023 APPROVED - AS NOTED BTAYLOR
Note: 8-1-23 1.Emailed FPL at 1:33.
GRAVITY SEWER TEST 07/14/2023 APPROVED MGIBSON
U - SEWER TIE IN 07/14/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 06/15/2023 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 05/23/2023 APPROVED BTAYLOR
INSULATION 05/23/2023 APPROVED BTAYLOR
ALL ROUGH 05/15/2023 APPROVED BTAYLOR
Note: 5/12/2023 - PREVIOUS INSPECTION NOTES 5/12/13: 1). Both Units - All windows missing anchors at center area. Many are missing anchors at top jamb. 2). Unit A - back kitchen/living room area - smoke detector not wired. 3). Lineset sleeves need to be properly sealed. 5/11/2023 - PREVIOUS INSPECTION NOTES JOB BOX NEEDS ATTENTION, COULD NOT LOCATE ENERGY CALCS. OR DUCT LAYOUT FOR HVAC
ALL ROUGH 05/12/2023 Disapproved -FEE REQUIRED RSIMS
Note: 5/12/13: 1). Both Units - All windows missing anchors at center area. Many are missing anchors at top jamb. 2). Unit A - back kitchen/living room area - smoke detector not wired. 3). Lineset sleeves need to be properly sealed. 5/11/2023 - PREVIOUS INSPECTION NOTES JOB BOX NEEDS ATTENTION, COULD NOT LOCATE ENERGY CALCS. OR DUCT LAYOUT FOR HVAC
ALL ROUGH 05/11/2023 Disapproved - NO FEE RMARTIN
Note: JOB BOX NEEDS ATTENTION, COULD NOT LOCATE ENERGY CALCS. OR DUCT LAYOUT FOR HVAC
ROOF VALLEY & METAL 04/17/2023 APPROVED TSTAUFFACHER
WALL SHEATHING 04/12/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/12/2023 APPROVED BTAYLOR
FIREWALL FINAL 04/11/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2443 4-10-23 1. Drywall mudding can not be started until nailing is approved. Need to corrdinate with subs better with scheduling.
FIREWALL DRYWALL NAILING 04/10/2023 APPROVED - AS NOTED BTAYLOR
Note: 4-10-23 1. Drywall mudding can not be started until nailing is approved. Need to corrdinate with subs better with scheduling.
TIE BEAM / LINTEL 11/18/2022 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 10/25/2022 APPROVED TBAKER
MONOLITHIC SLAB 10/10/2022 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 10/05/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/06/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/05/2024 01/10/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/25/2022 10/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/25/2022 10/25/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 08/30/2022 08/30/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 08/29/2022 08/29/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 08/29/2022 08/29/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Wind Load Data provided on sheet C-1 does not meet the minimum requirements of Table R301.2(2) and R301.2(4).
ZON HOLD 08/18/2022 08/18/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit correction with revised elevation for 11 Seattle for staff review before we can release this permit.
ZON HOLD 08/18/2022 08/19/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Front elevatioin identical to 11 Seattle Trail.
BLD HOLD 08/18/2022 08/25/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Wind Load Data provided on sheet C-1 does not meet the minimum requirements of Table R301.2(2) and R301.2(4).
BLD COMPLETE 08/11/2022 08/16/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/11/2022 08/15/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 08/11/2022 08/11/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/11/2022 08/11/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/11/2022 08/15/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/11/2022 08/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/11/2022 08/17/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 08/11/2022 08/12/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Same house side by side or across: 13.03.01. Architectural styles. Within residential developments, an identical house can only repeat every four lots when fronting the same right-of-way including both sides of the street. However, two no identical houses of the same style may be built adjacent to each other. Please have one hip or one gable roof or change the shapes of the windows. 9 and 11 Seattle Trail are identical home. Landscape Plan: Not the same as other plans showing Ac Pad on the sides. Site plan and floor plan show AC in rear of home
SWALE COMPLETE 08/11/2022 12/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
SW ENG REINSPECTION 30 ¤30.00 10/25/2023
SW ENG REINSPECTION 30 ¤30.00 10/25/2023
SW ENG - REVIEW 20 ¤20.00 08/31/2022
SW ENG RES REVIEW 200 ¤200.00 08/31/2022
3% TRANS IMPACT FEE CREDIT (¤82.14) 08/31/2022
SEWER CREDIT (¤1,700.00) 08/31/2022
SEWER INSPECTION ¤25.00 08/31/2022
SEWER CAPITAL FACILITY ¤9,879.52 08/31/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 08/31/2022
SITE PLAN 30 ¤30.00 08/31/2022
CONNECTION FEES ¤2,155.76 08/31/2022
3% FIRE IMPACT FEE CREDIT (¤23.32) 08/31/2022
IMPACT FEE FIRE ¤777.30 08/31/2022
IMPACT FEE PARKS ¤2,910.26 08/31/2022
IMPACT FEE SCHOOL ¤7,200.00 08/31/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 08/31/2022
WATER -IRRIGATION INSPECTION ¤50.00 08/31/2022
3% PARKS IMPACT FEE CREDIT (¤87.31) 08/31/2022
SURCHARGE FS 533.721 ¤4.55 08/31/2022
SURCHARGE - FS 468.631 ¤6.83 08/31/2022
SW ENG - FOUNDATION SURVEY ¤20.00 08/31/2022
SW ENG INSPECTION 80 ¤80.00 08/31/2022
SW ENG PRE APRON ¤30.00 08/31/2022
WATER- TURN ON ¤50.00 08/31/2022
ADJUSTMENT 50% (¤729.83) 08/31/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/31/2022
INSPECTION - RESIDENTIAL ¤1,113.75 08/31/2022
PLAN REVIEW - RESIDENTIAL ¤315.90 08/31/2022
Fees Total Due: ¤0.00 Total Paid: ¤32,399.77