I want to search for...
Permit #2022081089
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00100-0050 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00100 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 631-929-5500 |
| Location Address: 6 ZODIAC PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/30/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOGUE RE DEVELOPMENT LLC |
|
Address STE 110 GREENWOOD VILLAGE, CO 80111 |
|
Address 5460 S QUEBEC ST GREENWOOD VILLAGE, CO 80111 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/15/2023 | APPROVED | RSIMS |
| Note: 9/7/2023 - PREVIOUS INSPECTION NOTES 9/7/23: 1). ODU - 2 of 3 locking port caps are not locked. 2). Garbage disposal is jammed & tripped. 3). AHU lineset needs to be sealed where it enters deck. 4). AHU breaker is undersized. Min 51amp/Max 60 amp. 50 amp installed. 5). Master bathroom - left sink pop-up leaks at top (when filled to overflow) / Right faucet has a hole in the spout and is spraying water across counter. 6). Dryer exhaust box is missing cover and/or is not sealed at perimeter. 7). Back lanai exterior outlet box cover is painted shut. Could not open without breaking cover so the outlet could not be tested. | |||
| BLD - BUILDING FINAL | 09/07/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/7/23: 1). ODU - 2 of 3 locking port caps are not locked. 2). Garbage disposal is jammed & tripped. 3). AHU lineset needs to be sealed where it enters deck. 4). AHU breaker is undersized. Min 51amp/Max 60 amp. 50 amp installed. 5). Master bathroom - left sink pop-up leaks at top (when filled to overflow) / Right faucet has a hole in the spout and is spraying water across counter. 6). Dryer exhaust box is missing cover and/or is not sealed at perimeter. 7). Back lanai exterior outlet box cover is painted shut. Could not open without breaking cover so the outlet could not be tested. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/07/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 08/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 08/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 06/07/2023 | APPROVED | RSIMS |
| GRAVITY SEWER TEST | 05/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 05/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 05/16/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/12/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| PEP TANK INSTALLATION REQUEST | 04/20/2023 | APPROVED | TSCHWEERS |
| Note: 4/4/2023 3:18:50 PM- PREVIOUS INSPECTION NOTES 4/4/2023 Exterior needs to be completed. | |||
| INSULATION | 04/11/2023 | APPROVED | RSIMS |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 4/10/23: Previous notes not resolved! 4/4/2023 - PREVIOUS INSPECTION NOTES 4/4/23: Missing firestop at the following locations (marked with FS on stud & floor below areas). 1). Laundry plumbing vent stack. 2). Laundry room between 1" X 2" PT furring strips & 2" X 6" packout wall. 3). Kitchen range hood. 4). Left bathroom plumbing vent stack. 5). Thermostat wire top plate penetration. 6). Left & right walls at horizontal wire runs over 10ft. per FBC302.11(1.2 - Horizontally at intervals not exceeding 10 feet (3048 mm)). 7). Missing cardboard baffles at garage area and left & right ceiling level changes. Inspector Notes from Inspection 2420 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes). | |||
| INSULATION | 04/10/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/10/23: Previous notes not reolved! 4/4/2023 - PREVIOUS INSPECTION NOTES 4/4/23: Missing firestop at the following locations (marked with FS on stud & floor below areas). 1). Laundry plumbing vent stack. 2). Laundry room between 1" X 2" PT furring strips & 2" X 6" packout wall. 3). Kitchen range hood. 4). Left bathroom plumbing vent stack. 5). Thermostat wire top plate penetration. 6). Left & right walls at horizontal wire runs over 10ft. per FBC302.11(1.2 - Horizontally at intervals not exceeding 10 feet (3048 mm)). 7). Missing cardboard baffles at garage area and left & right ceiling level changes. Inspector Notes from Inspection 2420 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes). | |||
| LATH/BRICK/ WATER BARRIER | 04/06/2023 | APPROVED | RSIMS |
| Note: 4/4/2023 - PREVIOUS INSPECTION NOTES 4/4/23: 1). Right side - Need wire lath at hole in CMU for yellow romex wire. | |||
| LATH/BRICK/ WATER BARRIER | 04/04/2023 | Disapproved - NO FEE | RSIMS |
| Note: 4/4/23: 1). Right side - Need wire lath at hole in CMU for yellow romex wire. | |||
| INSULATION | 04/04/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/4/23: Missing firestop at the following locations (marked with FS on stud & floor below areas). 1). Laundry plumbing vent stack. 2). Laundry room between 1" X 2" PT furring strips & 2" X 6" packout wall. 3). Kitchen range hood. 4). Left bathroom plumbing vent stack. 5). Thermostat wire top plate penetration. 6). Left & right walls at horizontal wire runs over 10ft. per FBC302.11(1.2 - Horizontally at intervals not exceeding 10 feet (3048 mm)). 7). Missing cardboard baffles at garage area and left & right ceiling level changes. Inspector Notes from Inspection 2420 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes). | |||
| PEP TANK INSTALLATION REQUEST | 04/04/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 4/4/2023 Exterior needs to be completed. | |||
| ALL ROUGH | 04/03/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes). | |||
| ALL ROUGH | 03/29/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes). | |||
| ELECTRIC-TUG | 03/20/2023 | APPROVED | RSIMS |
| Note: 3/20/23: FPL emailed at @ 16:36. 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23: PER NEC 250-92 - The grounding conductor must be fully protected where exposed to damage or securely fastened to the exterior of the building. (if anchored to the building it must run tight against the building to eliminate potential damage). | |||
| ROOF VALLEY & METAL | 03/13/2023 | APPROVED | RSIMS |
| Note: 3/9/2023 - PREVIOUS INSPECTION NOTES 3/9/23: Roof Valley Metal cannot be approved before approved Roof Sheathing. (Failed during RS/B/T/DC inspection). Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/13/2023 | APPROVED | RSIMS |
| Note: 3/9/2023 - PREVIOUS INSPECTION NOTES 3/9/23: Braces / Ties / Down Cell - checked & approved. 1). Roof sheathing bump checked - disapproved - 2 areas of loose sheathing. (highlited on Lintel plan) Marked in blue below area. 2). As previously noted - STILL MISSING ADDRESS. Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| ELECTRIC-TUG | 03/10/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/10/23: PER NEC 250-92 - The grounding conductor must be fully protected where exposed to damage or securely fastened to the exterior of the building. (if anchored to the building it must run tight against the building to eliminate potential damage). | |||
| WALL SHEATHING | 03/09/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/09/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/9/23: Braces / Ties / Down Cell - checked & approved. 1). Roof sheathing bump checked - disapproved - 2 areas of loose sheathing. (highlited on Lintel plan) Marked in blue below area. 2). As previously noted - STILL MISSING ADDRESS. Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| ROOF VALLEY & METAL | 03/09/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/9/23: Inspection stopped! Roof Valley Metal cannot be approved before approved Roof Sheathing. (Failed during RS/B/T/DC inspection). Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/08/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/24/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| TIE BEAM / LINTEL | 02/21/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all. | |||
| MONOLITHIC SLAB | 02/08/2023 | APPROVED | RSIMS |
| Note: 2/7/2023 - PREVIOUS INSPECTION NOTES 2/7/23: Previously listed deficiencies 1 and 3 (root now sticking into footer) are unresolved. See highlighted print. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23: Areas highlighted on plans 1). Right side 6" sleeve is too short. (must extend outside of the footer). 2). Right side - Pex plumbing protection from contact with concrete is incomplete.P2603.3.1 3). Back left slab - remove root - (area circled on plastic) 4). Garage entry forms are removed and laying in garage. Need to be in place for inspection. *** Dirt on the right side should be up against footer/form boards to prevent excessive bleed out. | |||
| MONOLITHIC SLAB | 02/07/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/7/23: Previously listed deficiencies 1 and 3 (root now sticking into footer) are unresolved. See highlighted print. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23: Areas highlighted on plans 1). Right side 6" sleeve is too short. (must extend outside of the footer). 2). Right side - Pex plumbing protection from contact with concrete is incomplete.P2603.3.1 3). Back left slab - remove root - (area circled on plastic) 4). Garage entry forms are removed and laying in garage. Need to be in place for inspection. *** Dirt on the right side should be up against footer/form boards to prevent excessive bleed out. | |||
| MONOLITHIC SLAB | 02/06/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/6/23: Areas highlighted on plans 1). Right side 6" sleeve is too short. (must extend outside of the footer). 2). Right side - Pex plumbing protection from contact with concrete is incomplete.P2603.3.1 3). Back left slab - remove root - (area circled on plastic) 4). Garage entry forms are removed and laying in garage. Need to be in place for inspection. *** Dirt on the right side should be up against footer/form boards to prevent excessive bleed out. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/02/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/02/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/22/2023 | 06/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/08/2023 | 03/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/08/2023 | 03/08/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/27/2023 | 02/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/19/2022 | 08/25/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/19/2022 | 08/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/19/2022 | 12/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 09/15/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/15/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/30/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/30/2023 |
| WATER- TURN ON | ¤25.00 | 01/30/2023 |
| ADJUSTMENT 50% | (¤405.07) | 01/30/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/30/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 01/30/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 01/30/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/30/2023 |
| IMPACT FEE FIRE | ¤388.65 | 01/30/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/30/2023 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/30/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/30/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/30/2023 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/30/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 01/30/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 01/30/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/30/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/30/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/30/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/30/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/30/2023 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 01/30/2023 |
| SEWER CREDIT | (¤1,466.00) | 01/30/2023 |
| SEWER INSPECTION | ¤25.00 | 01/30/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/30/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/30/2023 |
| SITE PLAN 30 | ¤30.00 | 01/30/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,320.30 |