I want to search for...

Permit #2022081089

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00100-0050
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00100
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 631-929-5500
Location Address: 6 ZODIAC PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/30/2023
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: WICKAPOGUE RE DEVELOPMENT LLC

Address

STE 110

GREENWOOD VILLAGE, CO 80111

Address

5460 S QUEBEC ST

GREENWOOD VILLAGE, CO 80111

Lot: 0050
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/15/2023 APPROVED RSIMS
Note: 9/7/2023 - PREVIOUS INSPECTION NOTES 9/7/23: 1). ODU - 2 of 3 locking port caps are not locked. 2). Garbage disposal is jammed & tripped. 3). AHU lineset needs to be sealed where it enters deck. 4). AHU breaker is undersized. Min 51amp/Max 60 amp. 50 amp installed. 5). Master bathroom - left sink pop-up leaks at top (when filled to overflow) / Right faucet has a hole in the spout and is spraying water across counter. 6). Dryer exhaust box is missing cover and/or is not sealed at perimeter. 7). Back lanai exterior outlet box cover is painted shut. Could not open without breaking cover so the outlet could not be tested.
BLD - BUILDING FINAL 09/07/2023 Disapproved -FEE REQUIRED RSIMS
Note: 9/7/23: 1). ODU - 2 of 3 locking port caps are not locked. 2). Garbage disposal is jammed & tripped. 3). AHU lineset needs to be sealed where it enters deck. 4). AHU breaker is undersized. Min 51amp/Max 60 amp. 50 amp installed. 5). Master bathroom - left sink pop-up leaks at top (when filled to overflow) / Right faucet has a hole in the spout and is spraying water across counter. 6). Dryer exhaust box is missing cover and/or is not sealed at perimeter. 7). Back lanai exterior outlet box cover is painted shut. Could not open without breaking cover so the outlet could not be tested.
U -UTILITY RESIDENTIAL FINAL 09/07/2023 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 08/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 08/25/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 06/07/2023 APPROVED RSIMS
GRAVITY SEWER TEST 05/16/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 05/16/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 05/16/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 05/12/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
PEP TANK INSTALLATION REQUEST 04/20/2023 APPROVED TSCHWEERS
Note: 4/4/2023 3:18:50 PM- PREVIOUS INSPECTION NOTES 4/4/2023 Exterior needs to be completed.
INSULATION 04/11/2023 APPROVED RSIMS
Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 4/10/23: Previous notes not resolved! 4/4/2023 - PREVIOUS INSPECTION NOTES 4/4/23: Missing firestop at the following locations (marked with FS on stud & floor below areas). 1). Laundry plumbing vent stack. 2). Laundry room between 1" X 2" PT furring strips & 2" X 6" packout wall. 3). Kitchen range hood. 4). Left bathroom plumbing vent stack. 5). Thermostat wire top plate penetration. 6). Left & right walls at horizontal wire runs over 10ft. per FBC302.11(1.2 - Horizontally at intervals not exceeding 10 feet (3048 mm)). 7). Missing cardboard baffles at garage area and left & right ceiling level changes. Inspector Notes from Inspection 2420 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes).
INSULATION 04/10/2023 Disapproved -FEE REQUIRED RSIMS
Note: 4/10/23: Previous notes not reolved! 4/4/2023 - PREVIOUS INSPECTION NOTES 4/4/23: Missing firestop at the following locations (marked with FS on stud & floor below areas). 1). Laundry plumbing vent stack. 2). Laundry room between 1" X 2" PT furring strips & 2" X 6" packout wall. 3). Kitchen range hood. 4). Left bathroom plumbing vent stack. 5). Thermostat wire top plate penetration. 6). Left & right walls at horizontal wire runs over 10ft. per FBC302.11(1.2 - Horizontally at intervals not exceeding 10 feet (3048 mm)). 7). Missing cardboard baffles at garage area and left & right ceiling level changes. Inspector Notes from Inspection 2420 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes).
LATH/BRICK/ WATER BARRIER 04/06/2023 APPROVED RSIMS
Note: 4/4/2023 - PREVIOUS INSPECTION NOTES 4/4/23: 1). Right side - Need wire lath at hole in CMU for yellow romex wire.
LATH/BRICK/ WATER BARRIER 04/04/2023 Disapproved - NO FEE RSIMS
Note: 4/4/23: 1). Right side - Need wire lath at hole in CMU for yellow romex wire.
INSULATION 04/04/2023 Disapproved -FEE REQUIRED RSIMS
Note: 4/4/23: Missing firestop at the following locations (marked with FS on stud & floor below areas). 1). Laundry plumbing vent stack. 2). Laundry room between 1" X 2" PT furring strips & 2" X 6" packout wall. 3). Kitchen range hood. 4). Left bathroom plumbing vent stack. 5). Thermostat wire top plate penetration. 6). Left & right walls at horizontal wire runs over 10ft. per FBC302.11(1.2 - Horizontally at intervals not exceeding 10 feet (3048 mm)). 7). Missing cardboard baffles at garage area and left & right ceiling level changes. Inspector Notes from Inspection 2420 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes).
PEP TANK INSTALLATION REQUEST 04/04/2023 Disapproved - NO FEE TSCHWEERS
Note: 4/4/2023 Exterior needs to be completed.
ALL ROUGH 04/03/2023 APPROVED - AS NOTED RSIMS
Note: 4/3/23: AHU feed wire is still not phased out. Check at Insulation (or next) Inspection! Front & back doors are now installed. 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes).
ALL ROUGH 03/29/2023 PARTIALLY APPROVED RSIMS
Note: 3/29/23: As stated by applicant. "The front door & rear SGD are not installed". We will add a window nailing inspection if not complete before Insulation Inspection. 1). AHU feed wire is not phased out. 2). 5ft. head pressure is not holding. 3). Front left window is broken. (both panes).
ELECTRIC-TUG 03/20/2023 APPROVED RSIMS
Note: 3/20/23: FPL emailed at @ 16:36. 3/10/2023 - PREVIOUS INSPECTION NOTES 3/10/23: PER NEC 250-92 - The grounding conductor must be fully protected where exposed to damage or securely fastened to the exterior of the building. (if anchored to the building it must run tight against the building to eliminate potential damage).
ROOF VALLEY & METAL 03/13/2023 APPROVED RSIMS
Note: 3/9/2023 - PREVIOUS INSPECTION NOTES 3/9/23: Roof Valley Metal cannot be approved before approved Roof Sheathing. (Failed during RS/B/T/DC inspection). Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/13/2023 APPROVED RSIMS
Note: 3/9/2023 - PREVIOUS INSPECTION NOTES 3/9/23: Braces / Ties / Down Cell - checked & approved. 1). Roof sheathing bump checked - disapproved - 2 areas of loose sheathing. (highlited on Lintel plan) Marked in blue below area. 2). As previously noted - STILL MISSING ADDRESS. Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
ELECTRIC-TUG 03/10/2023 Disapproved - NO FEE RSIMS
Note: 3/10/23: PER NEC 250-92 - The grounding conductor must be fully protected where exposed to damage or securely fastened to the exterior of the building. (if anchored to the building it must run tight against the building to eliminate potential damage).
WALL SHEATHING 03/09/2023 APPROVED RSIMS
Note: Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/09/2023 Disapproved -FEE REQUIRED RSIMS
Note: 3/9/23: Braces / Ties / Down Cell - checked & approved. 1). Roof sheathing bump checked - disapproved - 2 areas of loose sheathing. (highlited on Lintel plan) Marked in blue below area. 2). As previously noted - STILL MISSING ADDRESS. Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
ROOF VALLEY & METAL 03/09/2023 Disapproved - NO FEE RSIMS
Note: 3/9/23: Inspection stopped! Roof Valley Metal cannot be approved before approved Roof Sheathing. (Failed during RS/B/T/DC inspection). Inspector Notes from Inspection 2340 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
FOUND SURVEY APPROVED (OFFICE) 03/08/2023 APPROVED TBAKER
TIE BEAM / LINTEL 02/24/2023 APPROVED - AS NOTED RSIMS
Note: 2/24/23: The notes below will need to be resolved before any more inspections will be done. *** Need a dumpster on-site and trash/debris cleaned up. *** Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
TIE BEAM / LINTEL 02/21/2023 Disapproved -FEE REQUIRED RSIMS
Note: 2/21/23: NOT READY! Walked with Superintendent. 1). Missing down rods at 2 locations highlighted on print. 2). Window mortar beds are too thick per FBC 606.3.1 (1/2" thick max) 3). bed and head joints between block are insufficient in multiple places. Will need to check all.
MONOLITHIC SLAB 02/08/2023 APPROVED RSIMS
Note: 2/7/2023 - PREVIOUS INSPECTION NOTES 2/7/23: Previously listed deficiencies 1 and 3 (root now sticking into footer) are unresolved. See highlighted print. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23: Areas highlighted on plans 1). Right side 6" sleeve is too short. (must extend outside of the footer). 2). Right side - Pex plumbing protection from contact with concrete is incomplete.P2603.3.1 3). Back left slab - remove root - (area circled on plastic) 4). Garage entry forms are removed and laying in garage. Need to be in place for inspection. *** Dirt on the right side should be up against footer/form boards to prevent excessive bleed out.
MONOLITHIC SLAB 02/07/2023 Disapproved -FEE REQUIRED RSIMS
Note: 2/7/23: Previously listed deficiencies 1 and 3 (root now sticking into footer) are unresolved. See highlighted print. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23: Areas highlighted on plans 1). Right side 6" sleeve is too short. (must extend outside of the footer). 2). Right side - Pex plumbing protection from contact with concrete is incomplete.P2603.3.1 3). Back left slab - remove root - (area circled on plastic) 4). Garage entry forms are removed and laying in garage. Need to be in place for inspection. *** Dirt on the right side should be up against footer/form boards to prevent excessive bleed out.
MONOLITHIC SLAB 02/06/2023 Disapproved -FEE REQUIRED RSIMS
Note: 2/6/23: Areas highlighted on plans 1). Right side 6" sleeve is too short. (must extend outside of the footer). 2). Right side - Pex plumbing protection from contact with concrete is incomplete.P2603.3.1 3). Back left slab - remove root - (area circled on plastic) 4). Garage entry forms are removed and laying in garage. Need to be in place for inspection. *** Dirt on the right side should be up against footer/form boards to prevent excessive bleed out.
PLUMBING 1ST ROUGH UNDERGROUND 02/02/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/02/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
MECH COMPLETE 06/22/2023 06/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/08/2023 03/08/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/08/2023 03/08/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 02/27/2023 02/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 08/19/2022 08/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/19/2022 08/23/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 08/19/2022 08/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/19/2022 08/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/19/2022 08/23/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/19/2022 08/19/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/19/2022 08/25/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 08/19/2022 08/22/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 08/19/2022 12/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/15/2023
PLAN REVIEW - REVISION ¤32.50 09/15/2023
PLAN REVIEW - REVISION ¤32.50 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
REINSPECTION RESIDENTIAL ¤40.00 09/15/2023
CONNECTION FEES ¤1,166.26 01/30/2023
CONTRACTOR CHANGE ¤20.00 01/30/2023
WATER- TURN ON ¤25.00 01/30/2023
ADJUSTMENT 50% (¤405.07) 01/30/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/30/2023
INSPECTION - RESIDENTIAL ¤607.75 01/30/2023
PLAN REVIEW - RESIDENTIAL ¤172.38 01/30/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/30/2023
IMPACT FEE FIRE ¤388.65 01/30/2023
IMPACT FEE PARKS ¤1,455.13 01/30/2023
IMPACT FEE SCHOOL ¤3,600.00 01/30/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 01/30/2023
WATER -IRRIGATION INSPECTION ¤25.00 01/30/2023
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/30/2023
SURCHARGE FS 533.721 ¤2.69 01/30/2023
SURCHARGE - FS 468.631 ¤4.04 01/30/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/30/2023
SW ENG INSPECTION 80 ¤80.00 01/30/2023
SW ENG PRE APRON ¤30.00 01/30/2023
SW ENG - REVIEW 20 ¤20.00 01/30/2023
SW ENG RES REVIEW 200 ¤200.00 01/30/2023
3% TRANS IMPACT FEE CREDIT (¤52.92) 01/30/2023
SEWER CREDIT (¤1,466.00) 01/30/2023
SEWER INSPECTION ¤25.00 01/30/2023
SEWER CAPITAL FACILITY ¤5,344.82 01/30/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 01/30/2023
SITE PLAN 30 ¤30.00 01/30/2023
Fees Total Due: ¤0.00 Total Paid: ¤17,320.30