I want to search for...
Permit #2022081091
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00410-0050 |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| CONDITIONED SPACE: 1721 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00410 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 631-929-5500 |
| Location Address: 56 WHITE FEATHER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/31/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOUGE RE DEVELOPMENT LLC |
|
Address SUITE 300 ORLANDO, FL 32819 |
|
Address 7450 DR PHILLIPS BLVD ORLANDO, FL 32819 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/05/2023 | FINAL APPROVED | MKRASKI |
| U-CROSS CONNECTION | 09/05/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 09/05/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 09/01/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/01/2023 | APPROVED | GBERTOLA |
| Note: 9/1/23= At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/31/2023 - PREVIOUS INSPECTION NOTES 8/31/23=DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU. 8/29/2023 - PREVIOUS INSPECTION NOTES ALONG THE LEFT SIDE OF THE HOUSE NEED TO TAKE HUMP AT THE PROPERTY LINE | |||
| ROW - FINAL APRON (AFTER POUR) | 09/01/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/31/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 8/31/23=DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU. 8/29/2023 - PREVIOUS INSPECTION NOTES ALONG THE LEFT SIDE OF THE HOUSE NEED TO TAKE HUMP AT THE PROPERTY LINE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------- 8/23/2023 - PREVIOUS INSPECTION NOTES THE HIGH SPOT IN THE BACK YARD IS TO FAR OFF THE BACK PROPERTY LINE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/29/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALONG THE LEFT SIDE OF THE HOUSE NEED TO TAKE HUMP AT THE PROPERTY LINE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE HIGH SPOT IN THE BACK YARD IS TO FAR OFF THE BACK PROPERTY LINE | |||
| ROW- PROJECT STATUS | 07/19/2023 | APPROVED | GBERTOLA |
| Note: 07/19/23= meeting with the builder inspecting the driveway | |||
| ROW- PRE-APRON (PRE-POUR) | 06/30/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 06/30/23 EVRYTHING LOOKED GOOD AT TIME OF INSPECTION. PIPE IS GOOD. READY TO POUR. TOLD CM BRIAN THAT HE NEEDS TO SUBMIT A REVISED SITE PLAN TO REFLECT THE NEW DRIVEWAY POUR MODIFICATIONS. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 06/13/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:30PM | |||
| GRAVITY SEWER TEST | 05/31/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 05/31/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U - SEWER TIE IN | 05/31/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 04/21/2023 | APPROVED | TSCHWEERS |
| ELECTRIC-TUG | 04/17/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 3:10 PM | |||
| INSULATION | 04/17/2023 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 04/17/2023 | APPROVED | MKRASKI |
| Note: | |||
| ALL ROUGH | 04/12/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Failed 5' head pressure 2. All double windows missing mullbar bracket Check @ insulation | |||
| ELECTRIC-TUG | 04/12/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 03/30/2023 | APPROVED | MKRASKI |
| WALL SHEATHING | 03/28/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/28/2023 | APPROVED | MKRASKI |
| FOUND SURVEY APPROVED (OFFICE) | 03/08/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/22/2023 | APPROVED | MKRASKI |
| ROW - DRAINAGE | 02/13/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 2/13/23= NEED A SILT FENCE 2/6/2023 - PREVIOUS INSPECTION NOTES 02/6/23=NEED TO REMOVE THE POTTY and THE DUMPSTER FROM THE SWALE AND PLACE ON YOUR PROPERTY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 02/13/23 | |||
| MONOLITHIC SLAB | 02/07/2023 | APPROVED | MKRASKI |
| ROW - DRAINAGE | 02/06/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 02/6/23=NEED TO REMOVE THE POTTY and THE DUMPSTER FROM THE SWALE AND PLACE ON YOUR PROPERTY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 02/13/23 PICTURES ATTACHED | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/03/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/01/2023 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 02/01/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/09/2023 | 08/10/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/09/2023 | 08/16/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/09/2023 | 08/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/27/2023 | 07/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/27/2023 | 08/01/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN DOES DONT HAVE ANY PROPOSED ELEVATIONS | |||
| ZON | HOLD | 07/27/2023 | 07/27/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please note on the revision all the changes that were made to the site plan Site plan: please show the 5 ft min n the left of driveway is being met at the beginning of the driveway. Show that the driveway is 16 ft wide for the first 20ft of the driveway as you did in the last site plan submitted Please know that the parking pad should be renamed as a turn around and can not exceed 9 ft in wide by 18 ft in length. please adjust plans accordingly Please submit a new landscape plan to match the changes that were made to the driveway area. Landscape plan: the Placement of the AC looks like it was moved back make it match on the landscape plan so all plans match also make the changes that were made in the driveway on landscape so the plans match | |||
| MECH | COMPLETE | 05/26/2023 | 05/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/08/2023 | 03/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/08/2023 | 03/08/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/02/2022 | 09/02/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/02/2022 | 09/02/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM please do not resend LOCATES for revisions- this is simply a survey that is not submitted for approval, but to provide you the location of the water and sewer locates for the lot. | |||
| BLD | COMPLETE | 09/02/2022 | 09/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/02/2022 | 09/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/02/2022 | 09/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/19/2022 | 08/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/19/2022 | 08/22/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet. They can be reduced to a minimum width of 10' after the 20' closest to the garage. 2. Residential driveways entering the public right-of-way shall be a minimum of ten feet wide at the right-of-way line and 16 feet wide at the roadway edge. 3. Provide setbacks from driveway to both side property lines at the closest point within the lot. 4. Banding is required around all windows and doors facing the public right of way (REAR). | |||
| SWALE | COMPLETE | 08/19/2022 | 12/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 09/05/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/05/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/05/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/05/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/05/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/31/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/31/2023 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 01/31/2023 |
| SEWER CREDIT | (¤1,147.00) | 01/31/2023 |
| SEWER INSPECTION | ¤25.00 | 01/31/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/31/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/31/2023 |
| SITE PLAN 30 | ¤30.00 | 01/31/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/31/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/31/2023 |
| WATER- TURN ON | ¤25.00 | 01/31/2023 |
| ADJUSTMENT 50% | (¤405.07) | 01/31/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/31/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 01/31/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 01/31/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/31/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/31/2023 |
| IMPACT FEE FIRE | ¤388.65 | 01/31/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/31/2023 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/31/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/31/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/31/2023 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/31/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 01/31/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 01/31/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/31/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,354.30 |