I want to search for...
Permit #2022081139
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01580-0220 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| Total Square Footage: 2201 sqft |
| Block: 01580 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 832-726-2202 |
| Location Address: 43 BIRCHWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/13/2022 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN INVESTMENTS 1 LLC |
|
Address 162 ORLANDO, FL 32826 |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/09/2023 | FINAL APPROVED | JSTEWART |
| Note: 8/8/2023 - PREVIOUS INSPECTION NOTES 8/8/23- Please seal hole exterior wall at garage eve and front porch wall. spare bath exhaust fan not installed. Please seal wall penetration at AHU closet power. New inspection due to canceled inspection 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23- via text | |||
| BLD - BUILDING FINAL | 08/08/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 8/8/23- Please seal hole exterior wall at garage eve and front porch wall. spare bath exhaust fan not installed. Please seal wall penetration at AHU closet power. New inspection due to canceled inspection 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23- via text | |||
| BLD - BUILDING FINAL | 08/03/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23- via text | |||
| BLD - BUILDING FINAL | 08/01/2023 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 8/1/23- via text | |||
| ROW - FINAL APRON (AFTER POUR) | 08/01/2023 | FINAL APPROVED | EMADISON |
| Note: | |||
| U -UTILITY RESIDENTIAL FINAL | 08/01/2023 | FINAL APPROVED | DHANEY |
| Note: 7/28/2023 - PREVIOUS INSPECTION NOTES Sewer clean outs need lowerd to ground level . | |||
| U -UTILITY RESIDENTIAL FINAL | 07/28/2023 | Disapproved - NO FEE | DHANEY |
| Note: Sewer clean outs need lowerd to ground level . | |||
| ROW - FINAL APRON (AFTER POUR) | 07/28/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/28/23 BUILDER NEEDS TO CLEAN CULVERT | |||
| BLD - BUILDING FINAL | 07/28/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/26/2023 | APPROVED | GBERTOLA |
| Note: 7/26/23=CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/20/2023 - PREVIOUS INSPECTION NOTES ** 07/20/23 NEED TO CLEAN UP SURVEY TO MANY NUMBERS MIXED WITH OTHER NUMBERS AND WRITING UNABLE TO DECIPHER SHOTS REMOVE ALSO SHOTS ON LINES ARE OBSCURED AS WELL BOTHLEFT AND RIGHT SIDES AS WELL AS CENTER LINE OF ROAD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/26/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 07/26/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/20/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/20/23 NEED TO CLEAN UP SURVEY TO MANY NUMBERS MIXED WITH OTHER NUMBERS AND WRITING UNABLE TO DECIPHER SHOTS REMOVE ALSO SHOTS ON LINES ARE OBSCURED AS WELL BOTHLEFT AND RIGHT SIDES AS WELL AS CENTER LINE OF ROAD | |||
| U-CROSS CONNECTION | 07/19/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/05/2023 | APPROVED | EMADISON |
| Note: ** 06/05/23 READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 6/2/2023 - PREVIOUS INSPECTION NOTES ** 06/02/23 METRO-NET UTILITY DUG HOLE IN APRON EQUIPMENT BLOCKING INSPECTION SITE AT THE TIME OF INSPECTION. HOLE NEEDS TO BE BACK FILLED AND COMPACTED WHICH IS METRO-NETS RESPONSIBILITY | |||
| ROW- PRE-APRON (PRE-POUR) | 06/02/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/02/23 METRO-NET UTILITY DUG HOLE IN APRON EQUIPMENT BLOCKING INSPECTION SITE AT THE TIME OF INSPECTION. HOLE NEEDS TO BE BACK FILLED AND COMPACTED WHICH IS METRO-NETS RESPONSIBILITY | |||
| U - SEWER TIE IN | 04/28/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/28/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 04/25/2023 | APPROVED | JSTEWART |
| PEP TANK INSTALLATION REQUEST | 03/23/2023 | APPROVED | TSCHWEERS |
| Note: 3/1/2023 10:28:47 AM- PREVIOUS INSPECTION NOTES 2/28/2023 Dumpster in the way of tank. | |||
| PEP TANK INSTALLATION REQUEST | 02/28/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 2/28/2023 Dumpster in the way of tank. | |||
| INSULATION | 02/17/2023 | APPROVED | JSTEWART |
| Note: 2/14/2023 - PREVIOUS INSPECTION NOTES 2/14/2023 1. please fire foam elctric holes in garage (3). 2. please fire stop at top of electric panel where wire passes thru. 3. Please fix and install cardboard at rear lanai for blowin insulation. | |||
| INSULATION | 02/14/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 2/14/2023 1. please fire foam elctric holes in garage (3). 2. please fire stop at top of electric panel where wire passes thru. 3. Please fix and install cardboard at rear lanai for blowin insulation. | |||
| LATH/BRICK/ WATER BARRIER | 02/08/2023 | APPROVED | JSTEWART |
| Note: 2/3/2023 - PREVIOUS INSPECTION NOTES Corner bead not complete lath at doors not complete | |||
| ALL ROUGH | 02/07/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 02/03/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Please provide duct layout for the house so we can verify duct sizing | |||
| LATH/BRICK/ WATER BARRIER | 02/03/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Corner bead not complete lath at doors not complete | |||
| ELECTRIC-TUG | 01/26/2023 | APPROVED | JMUNSON |
| ROOF VALLEY & METAL | 01/18/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2460 Address no visible from road FBC R319.1 Check on next inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/11/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Address no visible from road FBC R319.1 Check on next inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/10/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES LGT2 MISSING AS PER PLAN AT TRUSS T05 TO 4X4 COLUMN. | |||
| WALL SHEATHING | 01/06/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2023 | Disapproved - NO FEE | FWILLIS |
| Note: LGT2 MISSING AS PER PLAN AT TRUSS T05 TO 4X4 COLUMN. | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/05/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/27/2022 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 12/16/2022 | APPROVED | JWALKER |
| Note: 12/15/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE UFER GROUND INSTALLED FOR ELECTRICAL SERVICE AT MONOSLAB | |||
| MONOLITHIC SLAB | 12/15/2022 | Disapproved - NO FEE | RMARTIN |
| Note: NEED TO HAVE UFER GROUND INSTALLED FOR ELECTRICAL SERVICE AT MONOSLAB | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/12/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/12/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/02/2023 | 06/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/08/2023 | 03/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/31/2022 | 08/31/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/31/2022 | 08/31/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/31/2022 | 09/08/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/22/2022 | 12/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/19/2022 | 08/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/19/2022 | 08/23/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/19/2022 | 08/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2022 | 08/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/19/2022 | 08/25/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/19/2022 | 08/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/19/2022 | 08/26/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/19/2022 | 08/23/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Section incorrect on survey/site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/15/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/15/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/13/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/13/2022 |
| SEWER CREDIT | (¤1,284.28) | 10/13/2022 |
| SEWER INSPECTION | ¤25.00 | 10/13/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/13/2022 |
| SITE PLAN 30 | ¤30.00 | 10/13/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/13/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/13/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/13/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/13/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/13/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/13/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/13/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/13/2022 |
| SURCHARGE FS 533.721 | ¤2.47 | 10/13/2022 |
| SURCHARGE - FS 468.631 | ¤3.71 | 10/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/13/2022 |
| WATER- TURN ON | ¤25.00 | 10/13/2022 |
| ADJUSTMENT 50% | (¤366.24) | 10/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/13/2022 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 10/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 10/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,359.32 |