Permit #2022081149

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00310-0050
CONDITIONED SPACE: 1555 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
Total Square Footage: 2201 sqft
Block: 00310
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 832-726-2202
Location Address: 48 ROSE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/13/2022
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CASPIAN PERFORMANCE GROUP LLC

Address

1802 N ALFAYA TR STE 162

ORLANDO, FL 32826

Lot: 0050
Contracted Stated Job Value: ¤131,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/05/2023 FINAL APPROVED JWALKER
Note: 10/4/2023 - PREVIOUS INSPECTION NOTES 10/4/23 The ceiling in the AHU closet must be sealed completely. Rear of the supply plenum 10/3/2023 - PREVIOUS INSPECTION NOTES 10/3/23 Items 1,2,3,6 and 7 listed below have not been corrected. 10/2/2023 - PREVIOUS INSPECTION NOTES 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs.
BLD - BUILDING FINAL 10/04/2023 Disapproved - NO FEE JWALKER
Note: 10/4/23 The ceiling in the AHU closet must be sealed completely. Rear of the supply plenum 10/3/2023 - PREVIOUS INSPECTION NOTES 10/3/23 Items 1,2,3,6 and 7 listed below have not been corrected. 10/2/2023 - PREVIOUS INSPECTION NOTES 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs.
BLD - BUILDING FINAL 10/03/2023 Disapproved -FEE REQUIRED JWALKER
Note: 10/3/23 Items 1,2,3,6 and 7 listed below have not been corrected. 10/2/2023 - PREVIOUS INSPECTION NOTES 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs.
BLD - BUILDING FINAL 10/02/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs.
BLD - BUILDING FINAL 09/29/2023 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 09/25/2023 CANCELLED BY APPLICANT WEB
ROW - FINAL APRON (AFTER POUR) 09/25/2023 APPROVED GBERTOLA
Note: 9/25/23= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. DRAINAGE IN FIELD SURVEY WILL WORK. Inspector Notes from Inspection 9463 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED.
ROW - STORMWATER FINAL 09/25/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
U -UTILITY RESIDENTIAL FINAL 09/25/2023 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/20/2023 APPROVED - AS NOTED FSLADISH
Note: 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED.
ROW FIELD SURVEY /GRADING CERTIFICATION 09/20/2023 APPROVED - AS NOTED FSLADISH
Note: 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. DRAINAGE IN FIELD SURVEY WILL WORK. Inspector Notes from Inspection 9463 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED.
U-CROSS CONNECTION 09/12/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 08/15/2023 APPROVED FSLADISH
Note: 08/15/23 PIPE IS GOOD. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/10/2023 - PREVIOUS INSPECTION NOTES 7/27/2023 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION. NOT FORMED YET. PICTURE ATTACHED
ROW- PRE-APRON (PRE-POUR) 08/10/2023 CANCELLED BY APPLICANT FSLADISH
Note: 7/27/2023 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION. NOT FORMED YET. PICTURE ATTACHED
ROW- PRE-APRON (PRE-POUR) 07/27/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: NOT READY FOR INSPECTION. NOT FORMED YET. PICTURE ATTACHED
ELECTRIC - EARLY POWER 05/22/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2200 Emailed FPL @ 2:45 PM
GRAVITY SEWER TEST 05/17/2023 APPROVED MGIBSON
U - SEWER TIE IN 05/17/2023 APPROVED MGIBSON
INSULATION 04/10/2023 APPROVED LMILLER
LATH/BRICK/ WATER BARRIER 03/30/2023 APPROVED JWALKER
Note: New inspection due to canceled inspection 3/23/2023 - PREVIOUS INSPECTION NOTES Corner bead at side windows and rear not installed. Wire mesh over unused UFER ground block access needed.
LATH/BRICK/ WATER BARRIER 03/29/2023 CANCELLED BY APPLICANT WEB
Note: 3/23/2023 - PREVIOUS INSPECTION NOTES Corner bead at side windows and rear not installed. Wire mesh over unused UFER ground block access needed.
ALL ROUGH 03/23/2023 APPROVED JWALKER
Note: 3/21/2023 - PREVIOUS INSPECTION NOTES 1. Exhaust fan ducts must be supported every 4'' per manufacture spec 2. Address not visible fromt road per FBC 319.1, must be 4'' tall
LATH/BRICK/ WATER BARRIER 03/23/2023 Disapproved - NO FEE JWALKER
Note: Corner bead at side windows and rear not installed. Wire mesh over unused UFER ground block access needed.
ELECTRIC-TUG 03/21/2023 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2:45 PM
ALL ROUGH 03/21/2023 Disapproved - NO FEE MKRASKI
Note: 1. Exhaust fan ducts must be supported every 4'' per manufacture spec 2. Address not visible fromt road per FBC 319.1, must be 4'' tall
ROOF VALLEY & METAL 03/03/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/01/2023 APPROVED KSANDOE
Note: 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23: INSPECTION STOPPED! Initial revision and revised plan was rejected / revision submitted again on 2/23/23 has only been accepted not approved. Revisions need to be APPROVED before calling in for re-inspection. Please have trash around the site cleaned up and put in the dumpster. 2/21/2023 - PREVIOUS INSPECTION NOTES 1. Roof sheating missed nailing left front above front window. 2. Trusses CJ9, 10, 11. and HJO5 missing hold down anchors. 3. Truss T15 is missing the MGT hold down anchors see Page T1 of the prints. 4. Over framing at left front area requires 2x6 minimum rafters. Install missing MST12 and H2.5 anchors. See valley over framing detail 5. Truss T16 at the end where that is connected by the HUS hanger has a broken end and will need an engineers fix letter submitted to the building department. 6. The bearing wall is missing details for the opening. Please submitt a revision to the building department showing header size and hold down anchors required. Also provide end of wall pressure treated 2x4 connections to the CMU walls at the ends of the bearing wall. This detail has been noted at prior buildings.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/24/2023 Disapproved - NO FEE RSIMS
Note: 2/24/23: INSPECTION STOPPED! Initial revision and revised plan was rejected / revision submitted again on 2/23/23 has only been accepted not approved. Revisions need to be APPROVED before calling in for re-inspection. Please have trash around the site cleaned up and put in the dumpster. 2/21/2023 - PREVIOUS INSPECTION NOTES 1. Roof sheating missed nailing left front above front window. 2. Trusses CJ9, 10, 11. and HJO5 missing hold down anchors. 3. Truss T15 is missing the MGT hold down anchors see Page T1 of the prints. 4. Over framing at left front area requires 2x6 minimum rafters. Install missing MST12 and H2.5 anchors. See valley over framing detail 5. Truss T16 at the end where that is connected by the HUS hanger has a broken end and will need an engineers fix letter submitted to the building department. 6. The bearing wall is missing details for the opening. Please submitt a revision to the building department showing header size and hold down anchors required. Also provide end of wall pressure treated 2x4 connections to the CMU walls at the ends of the bearing wall. This detail has been noted at prior buildings.
WALL SHEATHING 02/21/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2340 2/8/23: MUST BE COMPLETE PRIOR TO NEXT INSPECTION! CHECK AT NEXT INSPECTION! *** Window mortar beds are above maximum thickness per FBC 606.3.1 (1/2" max). 3 back & 1 side. Locations highlighted on plan. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23 3 worker are Installed down rods. Please ensure all work is completed before calling in a reispection. Stopped inspection. 1/31/2023 - PREVIOUS INSPECTION NOTES 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/21/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. Roof sheating missed nailing left front above front window. 2. Trusses CJ9, 10, 11. and HJO5 missing hold down anchors. 3. Truss T15 is missing the MGT hold down anchors see Page T1 of the prints. 4. Over framing at left front area requires 2x6 minimum rafters. Install missing MST12 and H2.5 anchors. See valley over framing detail 5. Truss T16 at the end where that is connected by the HUS hanger has a broken end and will need an engineers fix letter submitted to the building department. 6. The bearing wall is missing details for the opening. Please submitt a revision to the building department showing header size and hold down anchors required. Also provide end of wall pressure treated 2x4 connections to the CMU walls at the ends of the bearing wall. This detail has been noted at prior buildings.
FOUND SURVEY APPROVED (OFFICE) 02/10/2023 APPROVED TBAKER
TIE BEAM / LINTEL 02/08/2023 APPROVED - AS NOTED RSIMS
Note: 2/8/23: MUST BE COMPLETE PRIOR TO NEXT INSPECTION! CHECK AT NEXT INSPECTION! *** Window mortar beds are above maximum thickness per FBC 606.3.1 (1/2" max). 3 back & 1 side. Locations highlighted on plan. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23 3 worker are Installed down rods. Please ensure all work is completed before calling in a reispection. Stopped inspection. 1/31/2023 - PREVIOUS INSPECTION NOTES 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall.
TIE BEAM / LINTEL 02/06/2023 Disapproved - NO FEE JWALKER
Note: 2/6/23 3 worker are Installed down rods. Please ensure all work is completed before calling in a reispection. Stopped inspection. 1/31/2023 - PREVIOUS INSPECTION NOTES 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall.
TIE BEAM / LINTEL 01/31/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall.
MONOLITHIC SLAB 01/19/2023 APPROVED JWALKER
Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 1/13/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped due to overthrown soil during plumbing pipe install. 1/17/23 Slab has not been tamped.
MONOLITHIC SLAB 01/17/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1/13/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped due to overthrown soil during plumbing pipe install. 1/17/23 Slab has not been tamped.
MONOLITHIC SLAB 01/13/2023 Disapproved - NO FEE JWALKER
Note: Slab needs to be tamped due to overthrown soil during plumbing pipe install.
PLUMBING 1ST ROUGH UNDERGROUND 01/09/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/17/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/07/2023 06/07/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 06/02/2023 06/02/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition
BLD COMPLETE 03/08/2023 03/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 02/24/2023 02/27/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 02/23/2023 02/23/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM reupload under under plans - not supporting documents.
BLD COMPLETE 02/22/2023 02/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/10/2023 02/10/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/10/2023 02/10/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 08/30/2022 08/31/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
CUSVC COMPLETE 08/30/2022 09/01/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ENGIN1 COMPLETE 08/30/2022 08/31/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/30/2022 09/07/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
BLD COMPLETE 08/22/2022 08/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/22/2022 08/23/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 08/22/2022 08/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/22/2022 08/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/22/2022 08/25/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/22/2022 08/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/22/2022 08/29/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 08/22/2022 08/24/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide walkway width on site plan/survey for review
SWALE COMPLETE 08/22/2022 12/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/05/2023
PLAN REVIEW - REVISION ¤32.50 10/05/2023
REINSPECTION RESIDENTIAL ¤40.00 10/05/2023
REINSPECTION RESIDENTIAL ¤40.00 10/05/2023
REINSPECTION RESIDENTIAL ¤40.00 10/05/2023
REINSPECTION RESIDENTIAL ¤40.00 10/05/2023
REINSPECTION RESIDENTIAL ¤40.00 10/05/2023
SW ENG REINSPECTION 30 ¤30.00 10/05/2023
SW ENG - REVIEW 20 ¤20.00 10/13/2022
SW ENG RES REVIEW 200 ¤200.00 10/13/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/13/2022
SEWER CAPITAL FACILITY ¤1,909.76 10/13/2022
WATER CAPITAL FACILITY FEE ¤1,466.50 10/13/2022
SITE PLAN 30 ¤30.00 10/13/2022
10/13/2022
ADJUSTMENT 50% (¤366.24) 10/13/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/13/2022
INSPECTION - RESIDENTIAL ¤547.25 10/13/2022
PLAN REVIEW - RESIDENTIAL ¤155.22 10/13/2022
CONNECTION FEES ¤327.88 10/13/2022
CONTRACTOR CHANGE ¤20.00 10/13/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/13/2022
IMPACT FEE FIRE ¤388.65 10/13/2022
IMPACT FEE PARKS ¤1,455.13 10/13/2022
IMPACT FEE SCHOOL ¤3,600.00 10/13/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/13/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/13/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/13/2022
SURCHARGE FS 533.721 ¤2.47 10/13/2022
SURCHARGE - FS 468.631 ¤3.71 10/13/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/13/2022
SW ENG INSPECTION 80 ¤80.00 10/13/2022
SW ENG PRE APRON ¤30.00 10/13/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,896.10