Permit #2022081149
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00310-0050 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00310 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 832-726-2202 |
| Location Address: 48 ROSE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/13/2022 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN PERFORMANCE GROUP LLC |
|
Address 1802 N ALFAYA TR STE 162 ORLANDO, FL 32826 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/05/2023 | FINAL APPROVED | JWALKER |
| Note: 10/4/2023 - PREVIOUS INSPECTION NOTES 10/4/23 The ceiling in the AHU closet must be sealed completely. Rear of the supply plenum 10/3/2023 - PREVIOUS INSPECTION NOTES 10/3/23 Items 1,2,3,6 and 7 listed below have not been corrected. 10/2/2023 - PREVIOUS INSPECTION NOTES 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs. | |||
| BLD - BUILDING FINAL | 10/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: 10/4/23 The ceiling in the AHU closet must be sealed completely. Rear of the supply plenum 10/3/2023 - PREVIOUS INSPECTION NOTES 10/3/23 Items 1,2,3,6 and 7 listed below have not been corrected. 10/2/2023 - PREVIOUS INSPECTION NOTES 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs. | |||
| BLD - BUILDING FINAL | 10/03/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 10/3/23 Items 1,2,3,6 and 7 listed below have not been corrected. 10/2/2023 - PREVIOUS INSPECTION NOTES 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs. | |||
| BLD - BUILDING FINAL | 10/02/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. House numbers not installed. 2. Vaccum breaker at left side hose bib not installed. 3. The ceiling in the AHU closet is to be sealed completely. 4. No hot water. 5. AHU is not bearing on the support platform properly at the rear left corner. 6. Water hammer for the dish washer supply pipe has not been installed. 7. Low water pressure at the master shower. 8. The garage door opener is not operating. 9. The electrical interior sub panel cover is not installed correctly likely due to the panel being located incorrectly at the studs. | |||
| BLD - BUILDING FINAL | 09/29/2023 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 09/25/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 09/25/2023 | APPROVED | GBERTOLA |
| Note: 9/25/23= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. DRAINAGE IN FIELD SURVEY WILL WORK. Inspector Notes from Inspection 9463 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. | |||
| ROW - STORMWATER FINAL | 09/25/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| U -UTILITY RESIDENTIAL FINAL | 09/25/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/20/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/20/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. DRAINAGE IN FIELD SURVEY WILL WORK. Inspector Notes from Inspection 9463 09/20/23 YOUR SITE PLAN SHOWS A COMMON SWALE ON BOTH ADJOINING PROPERTY LINES BUT YOUR FINAL SURVEY SHOWS W SWALES ON BOTH SIDE. I AM GOING TO PASS THIS TODAY AS IN THE FIELD IT WORKS. IN THE FUTURE YOUR FINAL SURVEY MAY BE FAILED IF DOES NOT RECONCILE WITH THE SITE PLAN. BUILDER NEEDS TO COMMUNICATE ANY GRADE PLAN CHANGES TO THE CITY SO WE ARE AWARE. APPROVING AS NOTED. | |||
| U-CROSS CONNECTION | 09/12/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 08/15/2023 | APPROVED | FSLADISH |
| Note: 08/15/23 PIPE IS GOOD. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/10/2023 - PREVIOUS INSPECTION NOTES 7/27/2023 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION. NOT FORMED YET. PICTURE ATTACHED | |||
| ROW- PRE-APRON (PRE-POUR) | 08/10/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 7/27/2023 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION. NOT FORMED YET. PICTURE ATTACHED | |||
| ROW- PRE-APRON (PRE-POUR) | 07/27/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: NOT READY FOR INSPECTION. NOT FORMED YET. PICTURE ATTACHED | |||
| ELECTRIC - EARLY POWER | 05/22/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 2:45 PM | |||
| GRAVITY SEWER TEST | 05/17/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 05/17/2023 | APPROVED | MGIBSON |
| INSULATION | 04/10/2023 | APPROVED | LMILLER |
| LATH/BRICK/ WATER BARRIER | 03/30/2023 | APPROVED | JWALKER |
| Note: New inspection due to canceled inspection 3/23/2023 - PREVIOUS INSPECTION NOTES Corner bead at side windows and rear not installed. Wire mesh over unused UFER ground block access needed. | |||
| LATH/BRICK/ WATER BARRIER | 03/29/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 3/23/2023 - PREVIOUS INSPECTION NOTES Corner bead at side windows and rear not installed. Wire mesh over unused UFER ground block access needed. | |||
| ALL ROUGH | 03/23/2023 | APPROVED | JWALKER |
| Note: 3/21/2023 - PREVIOUS INSPECTION NOTES 1. Exhaust fan ducts must be supported every 4'' per manufacture spec 2. Address not visible fromt road per FBC 319.1, must be 4'' tall | |||
| LATH/BRICK/ WATER BARRIER | 03/23/2023 | Disapproved - NO FEE | JWALKER |
| Note: Corner bead at side windows and rear not installed. Wire mesh over unused UFER ground block access needed. | |||
| ELECTRIC-TUG | 03/21/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:45 PM | |||
| ALL ROUGH | 03/21/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Exhaust fan ducts must be supported every 4'' per manufacture spec 2. Address not visible fromt road per FBC 319.1, must be 4'' tall | |||
| ROOF VALLEY & METAL | 03/03/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/01/2023 | APPROVED | KSANDOE |
| Note: 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23: INSPECTION STOPPED! Initial revision and revised plan was rejected / revision submitted again on 2/23/23 has only been accepted not approved. Revisions need to be APPROVED before calling in for re-inspection. Please have trash around the site cleaned up and put in the dumpster. 2/21/2023 - PREVIOUS INSPECTION NOTES 1. Roof sheating missed nailing left front above front window. 2. Trusses CJ9, 10, 11. and HJO5 missing hold down anchors. 3. Truss T15 is missing the MGT hold down anchors see Page T1 of the prints. 4. Over framing at left front area requires 2x6 minimum rafters. Install missing MST12 and H2.5 anchors. See valley over framing detail 5. Truss T16 at the end where that is connected by the HUS hanger has a broken end and will need an engineers fix letter submitted to the building department. 6. The bearing wall is missing details for the opening. Please submitt a revision to the building department showing header size and hold down anchors required. Also provide end of wall pressure treated 2x4 connections to the CMU walls at the ends of the bearing wall. This detail has been noted at prior buildings. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2023 | Disapproved - NO FEE | RSIMS |
| Note: 2/24/23: INSPECTION STOPPED! Initial revision and revised plan was rejected / revision submitted again on 2/23/23 has only been accepted not approved. Revisions need to be APPROVED before calling in for re-inspection. Please have trash around the site cleaned up and put in the dumpster. 2/21/2023 - PREVIOUS INSPECTION NOTES 1. Roof sheating missed nailing left front above front window. 2. Trusses CJ9, 10, 11. and HJO5 missing hold down anchors. 3. Truss T15 is missing the MGT hold down anchors see Page T1 of the prints. 4. Over framing at left front area requires 2x6 minimum rafters. Install missing MST12 and H2.5 anchors. See valley over framing detail 5. Truss T16 at the end where that is connected by the HUS hanger has a broken end and will need an engineers fix letter submitted to the building department. 6. The bearing wall is missing details for the opening. Please submitt a revision to the building department showing header size and hold down anchors required. Also provide end of wall pressure treated 2x4 connections to the CMU walls at the ends of the bearing wall. This detail has been noted at prior buildings. | |||
| WALL SHEATHING | 02/21/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2340 2/8/23: MUST BE COMPLETE PRIOR TO NEXT INSPECTION! CHECK AT NEXT INSPECTION! *** Window mortar beds are above maximum thickness per FBC 606.3.1 (1/2" max). 3 back & 1 side. Locations highlighted on plan. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23 3 worker are Installed down rods. Please ensure all work is completed before calling in a reispection. Stopped inspection. 1/31/2023 - PREVIOUS INSPECTION NOTES 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/21/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Roof sheating missed nailing left front above front window. 2. Trusses CJ9, 10, 11. and HJO5 missing hold down anchors. 3. Truss T15 is missing the MGT hold down anchors see Page T1 of the prints. 4. Over framing at left front area requires 2x6 minimum rafters. Install missing MST12 and H2.5 anchors. See valley over framing detail 5. Truss T16 at the end where that is connected by the HUS hanger has a broken end and will need an engineers fix letter submitted to the building department. 6. The bearing wall is missing details for the opening. Please submitt a revision to the building department showing header size and hold down anchors required. Also provide end of wall pressure treated 2x4 connections to the CMU walls at the ends of the bearing wall. This detail has been noted at prior buildings. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/10/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/08/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 2/8/23: MUST BE COMPLETE PRIOR TO NEXT INSPECTION! CHECK AT NEXT INSPECTION! *** Window mortar beds are above maximum thickness per FBC 606.3.1 (1/2" max). 3 back & 1 side. Locations highlighted on plan. 2/6/2023 - PREVIOUS INSPECTION NOTES 2/6/23 3 worker are Installed down rods. Please ensure all work is completed before calling in a reispection. Stopped inspection. 1/31/2023 - PREVIOUS INSPECTION NOTES 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall. | |||
| TIE BEAM / LINTEL | 02/06/2023 | Disapproved - NO FEE | JWALKER |
| Note: 2/6/23 3 worker are Installed down rods. Please ensure all work is completed before calling in a reispection. Stopped inspection. 1/31/2023 - PREVIOUS INSPECTION NOTES 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall. | |||
| TIE BEAM / LINTEL | 01/31/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Multiple down rods missing. 2. Multiple dowels missed. 3. Rebar laps not tied in the bond beam. 4. Down rods not tied in the bond beam and the 90 degree bends. Marked the drawings of the missing dowels and down rods. A full inspection of lintels and bond beams still needed Note to contractor ensure down rods are continuous from top of wall to dowels at the bottom of the wall. | |||
| MONOLITHIC SLAB | 01/19/2023 | APPROVED | JWALKER |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 1/13/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped due to overthrown soil during plumbing pipe install. 1/17/23 Slab has not been tamped. | |||
| MONOLITHIC SLAB | 01/17/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1/13/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped due to overthrown soil during plumbing pipe install. 1/17/23 Slab has not been tamped. | |||
| MONOLITHIC SLAB | 01/13/2023 | Disapproved - NO FEE | JWALKER |
| Note: Slab needs to be tamped due to overthrown soil during plumbing pipe install. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/09/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/17/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/07/2023 | 06/07/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/02/2023 | 06/02/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| BLD | COMPLETE | 03/08/2023 | 03/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/24/2023 | 02/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 02/23/2023 | 02/23/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM reupload under under plans - not supporting documents. | |||
| BLD | COMPLETE | 02/22/2023 | 02/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/30/2022 | 08/31/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/30/2022 | 09/01/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ENGIN1 | COMPLETE | 08/30/2022 | 08/31/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/30/2022 | 09/07/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/22/2022 | 08/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/22/2022 | 08/23/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/22/2022 | 08/25/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/22/2022 | 08/29/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/22/2022 | 08/24/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide walkway width on site plan/survey for review | |||
| SWALE | COMPLETE | 08/22/2022 | 12/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/05/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/05/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/13/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/13/2022 |
| SEWER CAPITAL FACILITY | ¤1,909.76 | 10/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤1,466.50 | 10/13/2022 |
| SITE PLAN 30 | ¤30.00 | 10/13/2022 |
| 10/13/2022 | ||
| ADJUSTMENT 50% | (¤366.24) | 10/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/13/2022 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 10/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 10/13/2022 |
| CONNECTION FEES | ¤327.88 | 10/13/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 10/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/13/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/13/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/13/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/13/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/13/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/13/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/13/2022 |
| SURCHARGE FS 533.721 | ¤2.47 | 10/13/2022 |
| SURCHARGE - FS 468.631 | ¤3.71 | 10/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,896.10 |