I want to search for...

Permit #2022081150

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00370-0020
CONDITIONED SPACE: 1555 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
Total Square Footage: 2201 sqft
Block: 00370
Subdivision: -
Job Phone: 832-726-2202
Location Address: 53 UNIVERSAL TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/13/2022
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CASPIAN PERFORMANCE GROUP LLC

Address

1112 ORANGE AVE STE 162

ORLANDO, FL 32826

Lot: 0020
Contracted Stated Job Value: ¤131,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
ALEKSANDRA LUSHI
Status Location Address Mailing Address State License Number Phone
INACTIVE

9360 CRAVEN RD

JACKSONVILLE, FL 32257

APT 401

JACKSONVILLE, FL 32257

CAC1820975 (Exp: 08/31/2026) 904-338-8522

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/09/2023 FINAL APPROVED BTAYLOR
Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10-6-23 1. Master shower valves are swapped.
BLD - BUILDING FINAL 10/06/2023 Disapproved - NO FEE BTAYLOR
Note: 10-6-23 1. Master shower valves are swapped.
ROW - STORMWATER FINAL 10/06/2023 APPROVED - AS NOTED FSLADISH
Note: 10/06/23 SWALE IS STILL HOLDING WATER, BUT DOWNSTREAM SWALE IS FULL AS WELL DUE TO RECENT HEAVY RAINFALL, SO I AM APPROVING THIS AS NOTED FOR THAT REASON. SURVEY SHOWS FALL. IN THE SWALE. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 10/2/2023 - PREVIOUS INSPECTION NOTES 10/2/23= All the areas where white spray paint is present should be flattened to allow water flow Needs to lay sod on the swale on the right side. Empty lot, Bare earth on the site or surrounding properties must be sodded or seeded with pine straw cover to prevent soil erosion. Remove all the sand inside culvert puipe miters ends
ROW - STORMWATER FINAL 10/05/2023 CANCELLED BY APPLICANT WEB
Note: 10/2/2023 - PREVIOUS INSPECTION NOTES 10/2/23= All the areas where white spray paint is present should be flattened to allow water flow Needs to lay sod on the swale on the right side. Empty lot, Bare earth on the site or surrounding properties must be sodded or seeded with pine straw cover to prevent soil erosion. Remove all the sand inside culvert puipe miters ends
U -UTILITY RESIDENTIAL FINAL 10/02/2023 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 10/02/2023 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 10/02/2023 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 10/02/2023 Disapproved - NO FEE GBERTOLA
Note: 10/2/23= All the areas where white spray paint is present should be flattened to allow water flow Needs to lay sod on the swale on the right side. Empty lot, Bare earth on the site or surrounding properties must be sodded or seeded with pine straw cover to prevent soil erosion. Remove all the sand inside culvert puipe miters ends
BLD - BUILDING FINAL 10/02/2023 CANCELLED BY APPLICANT WEB
ROW - FINAL APRON (AFTER POUR) 09/29/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 09/29/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------- 9/20/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY PASSES ------------------------------------------------------------------- 9/19/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY PASSES --------------------------------------------------------------------- 9/7/2023 - PREVIOUS INSPECTION NOTES NEED TO MAKE A COMMON SWALE ON RIGHT PROPERTY LINE. THE FINAL NEEDS TO BE RESUBMITED WHEN THE GRADE WORK IS DONE TO REFLECT THE NEW COMMON SWALE. ----------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER FINAL SURVEY IS PASSED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/29/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------- 9/21/2023 - PREVIOUS INSPECTION NOTES MEET WITH CM ON THE DRAINAGE ON THIS LOT SWA.E ON THE RIGHT SIDE OF HOME NEEDS TO BE COMMON SWALE AT PROPERTY LINE ------------------------------------------------------------------------------------------ 9/19/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE PROPERTY LINE SO WHEN THE NEW HOME GETS BUILT THEY WILL SHARE THE SAM SWALE ALONG THE PROPERTY LINE ---------------------------------------------------------------------------------------------------- NOTE INSPECTOR MAKE SURE THEY HAVE A COMMON SWALE ON THE RIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/21/2023 Disapproved - NO FEE PFLANAGAN
Note: MEET WITH CM ON THE DRAINAGE ON THIS LOT SWA.E ON THE RIGHT SIDE OF HOME NEEDS TO BE COMMON SWALE AT PROPERTY LINE ------------------------------------------------------------------------------------------ 9/19/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE PROPERTY LINE SO WHEN THE NEW HOME GETS BUILT THEY WILL SHARE THE SAM SWALE ALONG THE PROPERTY LINE ---------------------------------------------------------------------------------------------------- NOTE INSPECTOR MAKE SURE THEY HAVE A COMMON SWALE ON THE RIGHT
ROW- PROJECT STATUS 09/21/2023 APPROVED PFLANAGAN
Note: MEET WITH CM ABOUT DRAINAGE ON THE LEFT SIDE
ROW FIELD SURVEY /GRADING CERTIFICATION 09/20/2023 Disapproved - NO FEE PFLANAGAN
Note: THIS INSPECTION IS DONE AFTER THE FINAL SURVEY PASSES ------------------------------------------------------------------- 9/19/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY PASSES --------------------------------------------------------------------- 9/7/2023 - PREVIOUS INSPECTION NOTES NEED TO MAKE A COMMON SWALE ON RIGHT PROPERTY LINE. THE FINAL NEEDS TO BE RESUBMITED WHEN THE GRADE WORK IS DONE TO REFLECT THE NEW COMMON SWALE. ----------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER FINAL SURVEY IS PASSED
ROW FIELD SURVEY /GRADING CERTIFICATION 09/19/2023 Disapproved - NO FEE PFLANAGAN
Note: THIS INSPECTION IS DONE AFTER THE FINAL SURVEY PASSES --------------------------------------------------------------------- 9/7/2023 - PREVIOUS INSPECTION NOTES NEED TO MAKE A COMMON SWALE ON RIGHT PROPERTY LINE. THE FINAL NEEDS TO BE RESUBMITED WHEN THE GRADE WORK IS DONE TO REFLECT THE NEW COMMON SWALE. ----------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER FINAL SURVEY IS PASSED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/19/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE PROPERTY LINE SO WHEN THE NEW HOME GETS BUILT THEY WILL SHARE THE SAM SWALE ALONG THE PROPERTY LINE ---------------------------------------------------------------------------------------------------- NOTE INSPECTOR MAKE SURE THEY HAVE A COMMON SWALE ON THE RIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/07/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------- 8/31/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow 2) THE DRAINAGE OF THE LOT DONT MATCH THE DRAINAGE PLAN THAT WAS PROPOSED. 3) Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/16/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS IS PITCHED THE WRONG WAY 2) NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE DO TO VACANT LOT
ROW FIELD SURVEY /GRADING CERTIFICATION 09/07/2023 Disapproved - NO FEE PFLANAGAN
Note: NEED TO MAKE A COMMON SWALE ON RIGHT PROPERTY LINE. THE FINAL NEEDS TO BE RESUBMITED WHEN THE GRADE WORK IS DONE TO REFLECT THE NEW COMMON SWALE. ----------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER FINAL SURVEY IS PASSED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/01/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow 2) THE DRAINAGE OF THE LOT DONT MATCH THE DRAINAGE PLAN THAT WAS PROPOSED. 3) Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/16/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS IS PITCHED THE WRONG WAY 2) NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE DO TO VACANT LOT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/30/2023 Disapproved - NO FEE GBERTOLA
Note: DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/16/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS IS PITCHED THE WRONG WAY 2) NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE DO TO VACANT LOT
ROW FIELD SURVEY /GRADING CERTIFICATION 08/29/2023 Disapproved - NO FEE PFLANAGAN
Note: THIS INSPECTION IS DONE AFTER FINAL SURVEY IS PASSED
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/16/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) THE CULVERT PIPE IS IS PITCHED THE WRONG WAY 2) NEED TO HAVE A COMMON SWALE ON THE RIGHT SIDE DO TO VACANT LOT
ELECTRIC - EARLY POWER 07/12/2023 APPROVED - AS NOTED BTAYLOR
Note: 6/27/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES 4/28/2023 - PREVIOUS INSPECTION NOTES 4/28/23: Inspection Stopped! House is not ready for early power. (still in progress). Inspector Notes from Inspection 2200 3-10-23 1. Emailed FPL at 2:47. 6-20-23 1. Not ready. 6-27-23 1. 1. Not ready. 7-12-23 1. Emailed FPL at 2:26.
ELECTRIC - EARLY POWER 06/27/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 6/20/2023 - PREVIOUS INSPECTION NOTES 4/28/2023 - PREVIOUS INSPECTION NOTES 4/28/23: Inspection Stopped! House is not ready for early power. (still in progress). Inspector Notes from Inspection 2200 3-10-23 1. Emailed FPL at 2:47. 6-20-23 1. Not ready. 6-27-23 1. 1. Not ready.
ELECTRIC - EARLY POWER 06/20/2023 Disapproved - NO FEE BTAYLOR
Note: 4/28/2023 - PREVIOUS INSPECTION NOTES 4/28/23: Inspection Stopped! House is not ready for early power. (still in progress). Inspector Notes from Inspection 2200 3-10-23 1. Emailed FPL at 2:47. 6-20-23 1. Not ready.
ROW- PRE-APRON (PRE-POUR) 06/20/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN CONCTRETE TO MEET CITY'S STANDARTS
ELECTRIC - EARLY POWER 04/28/2023 Disapproved -FEE REQUIRED RSIMS
Note: 4/28/23: Inspection Stopped! House is not ready for early power. (still in progress). Inspector Notes from Inspection 2200 3-10-23 1. Emailed FPL at 2:47.
GRAVITY SEWER TEST 04/17/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 04/17/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U - SEWER TIE IN 04/17/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 03/21/2023 APPROVED BTAYLOR
ELECTRIC-TUG 03/10/2023 APPROVED - AS NOTED BTAYLOR
Note: 3-10-23 1. Emailed FPL at 2:47.
ALL ROUGH 03/10/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 03/02/2023 APPROVED BTAYLOR
Note: 2/28/2023 - PREVIOUS INSPECTION NOTES 2-28-23 1. Holes on right side of house need wire lath over them.
ALL ROUGH 03/02/2023 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 02/28/2023 Disapproved - NO FEE BTAYLOR
Note: 2-28-23 1. Holes on right side of house need wire lath over them.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/28/2023 APPROVED BTAYLOR
Note: 2/9/2023 - PREVIOUS INSPECTION NOTES 2-9-23 2. MGT needs to installed on T15. 2. Need red heads in bearing wall. 3. Need to add another row of blocking in bearing wall.
ROOF VALLEY & METAL 02/22/2023 APPROVED BTAYLOR
WALL SHEATHING 02/09/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/09/2023 Disapproved - NO FEE BTAYLOR
Note: 2-9-23 2. MGT needs to installed on T15. 2. Need red heads in bearing wall. 3. Need to add another row of blocking in bearing wall.
FOUND SURVEY APPROVED (OFFICE) 02/06/2023 APPROVED JHOWARD
TIE BEAM / LINTEL 01/30/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 01/24/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 01/20/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/17/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 09/01/2023 09/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/08/2023 03/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/06/2023 02/06/2023
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 02/06/2023 02/06/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 08/31/2022 08/31/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
CUSVC COMPLETE 08/31/2022 09/01/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ENGIN1 COMPLETE 08/31/2022 08/31/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/31/2022 09/08/2022
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 08/22/2022 08/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/22/2022 08/23/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 08/22/2022 08/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/22/2022 08/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/22/2022 08/25/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/22/2022 08/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/22/2022 08/29/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 08/22/2022 08/24/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide walkway width on site plan/survey Setbacks missing on site plan
SWALE COMPLETE 08/22/2022 12/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 10/09/2023
REINSPECTION RESIDENTIAL ¤40.00 10/09/2023
CONTRACTOR CHANGE ¤20.00 10/09/2023
SW ENG REINSPECTION 20 ¤20.00 10/09/2023
SW ENG - REVIEW 20 ¤20.00 10/13/2022
SW ENG RES REVIEW 200 ¤200.00 10/13/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/13/2022
SEWER INSPECTION ¤25.00 10/13/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/13/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/13/2022
SITE PLAN 30 ¤30.00 10/13/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/13/2022
IMPACT FEE FIRE ¤388.65 10/13/2022
IMPACT FEE PARKS ¤1,455.13 10/13/2022
IMPACT FEE SCHOOL ¤3,600.00 10/13/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 10/13/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/13/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/13/2022
SURCHARGE FS 533.721 ¤2.47 10/13/2022
SURCHARGE - FS 468.631 ¤3.71 10/13/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/13/2022
SW ENG INSPECTION 80 ¤80.00 10/13/2022
SW ENG PRE APRON ¤30.00 10/13/2022
CONNECTION FEES ¤1,077.88 10/13/2022
CONTRACTOR CHANGE ¤20.00 10/13/2022
WATER- TURN ON ¤25.00 10/13/2022
ADJUSTMENT 50% (¤366.24) 10/13/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/13/2022
INSPECTION - RESIDENTIAL ¤547.25 10/13/2022
PLAN REVIEW - RESIDENTIAL ¤155.22 10/13/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,711.10