Permit #2022081157

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01580-0090
CONDITIONED SPACE: 1555 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
Total Square Footage: 2201 sqft
Block: 01580
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 832-726-2202
Location Address: 17 BIRCHWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/15/2022
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: ZZMZ CASPIAN, LLC

Address

1802 N ALAFAYA TR STE 162

ORLANDO, FL 32826

Lot: 0090
Contracted Stated Job Value: ¤131,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/20/2023 FINAL APPROVED JWALKER
Note: 12/19/2023 - PREVIOUS INSPECTION NOTES 12/19/23- Previous note not rectified.....Please un earth condensation Line, needs to discharge above ground or into a aproved drainage system....M1411.3 Condensate disposal. 12/18/2023 - PREVIOUS INSPECTION NOTES 12/18/23- Please obtain a revision of energy calcs to match equipment installed. tug electric outlet missing cover. Please ceil exterior cable wall penetration by power meter. Please install anti tip bracket in a way to where it functions at the range. Please un earth condensation Line, needs to discharge above ground or into a aproved drainage system....M1411.3 Condensate disposal. Inspector Notes from Inspection 2490 3/17/2023--Please seal Liquid line chase at AHU closet. Inspector Notes from Inspection 2420 3/8/2023--Missing Mull bar connection front window, will check at insulation. 3/7/2023 - PREVIOUS INSPECTION NOTES 3/7/2023--No energy calcs or product aproval onsite/ DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Missing Mull Bar connection front window. Inspector Notes from Inspection 2320 2/14/2023- superintendant onsite, missing front door detail on back order.
BLD - BUILDING FINAL 12/19/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 12/19/23- Previous note not rectified.....Please un earth condensation Line, needs to discharge above ground or into a aproved drainage system....M1411.3 Condensate disposal. 12/18/2023 - PREVIOUS INSPECTION NOTES 12/18/23- Please obtain a revision of energy calcs to match equipment installed. tug electric outlet missing cover. Please ceil exterior cable wall penetration by power meter. Please install anti tip bracket in a way to where it functions at the range. Please un earth condensation Line, needs to discharge above ground or into a aproved drainage system....M1411.3 Condensate disposal. Inspector Notes from Inspection 2490 3/17/2023--Please seal Liquid line chase at AHU closet. Inspector Notes from Inspection 2420 3/8/2023--Missing Mull bar connection front window, will check at insulation. 3/7/2023 - PREVIOUS INSPECTION NOTES 3/7/2023--No energy calcs or product aproval onsite/ DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Missing Mull Bar connection front window. Inspector Notes from Inspection 2320 2/14/2023- superintendant onsite, missing front door detail on back order.
ROW - FINAL APRON (AFTER POUR) 12/18/2023 APPROVED RGROSS
ROW - STORMWATER FINAL 12/18/2023 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 12/18/2023 FINAL APPROVED DHANEY
BLD - BUILDING FINAL 12/18/2023 Disapproved - NO FEE JSTEWART
Note: 12/18/23- Please obtain a revision of energy calcs to match equipment installed. tug electric outlet missing cover. Please ceil exterior cable wall penetration by power meter. Please install anti tip bracket in a way to where it functions at the range. Please un earth condensation Line, needs to discharge above ground or into a aproved drainage system....M1411.3 Condensate disposal. Inspector Notes from Inspection 2490 3/17/2023--Please seal Liquid line chase at AHU closet. Inspector Notes from Inspection 2420 3/8/2023--Missing Mull bar connection front window, will check at insulation. 3/7/2023 - PREVIOUS INSPECTION NOTES 3/7/2023--No energy calcs or product aproval onsite/ DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Missing Mull Bar connection front window. Inspector Notes from Inspection 2320 2/14/2023- superintendant onsite, missing front door detail on back order.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/15/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 12/15/2023 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 09/20/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/20/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
U-CROSS CONNECTION 06/16/2023 APPROVED DHANEY
U - SEWER TIE IN 06/16/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 06/16/2023 APPROVED MGIBSON
ROW - DRAINAGE 05/31/2023 APPROVED EMADISON
Note: ** 05/31/23 correctioins made _________________________________________________________________________________________________________________ 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER HAS OPENED CATCH BASIN ANS ROAD SIDE SWALE AND DITCH ACROSS STREET ** AN EROSION CONTROL DEVIS STILL REQUIRED AT THE CATCH BASIN TO PREVENT FURTHER ERODED MATERIAL FROM ENTERING STORMWATER SYSTEM ** FOLLOWUP INSPECTION ON 05/31/23 ____________________________________________________________________________________________________________________ 5/24/2023 - PREVIOUS INSPECTION NOTES ** 05/24/23 BUILDER NEEDS TO OPEN THE CATCH BASIN IN THE ROAD SIDE SWALE ON RIGHT SIDE AND PUT A FORM OF AN EROSION CONTROL DEVICE IN PLACE TO PREVENT MORE SEDIMENT FROM ENTERING THE BASIN AND TO DITCH LINE ACROSS THE STREET. ** BUILDER WILL ALSO BE REQUIRED TO CLEAN CATCH BASIN , DRAINAGE PIPE UNDER ROAD AND DITCH OF ALL SEDIMENT BEFORE THE ROW FINAL WILL BE APPROVED. ** BUILDER NEEDS TO CLEAN UP TRASH TO PREVENT IT FROM ENTERING THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/30/23
ROW - DRAINAGE 05/30/2023 Disapproved - NO FEE EMADISON
Note: ** 05/30/23 BUILDER HAS OPENED CATCH BASIN ANS ROAD SIDE SWALE AND DITCH ACROSS STREET ** AN EROSION CONTROL DEVIS STILL REQUIRED AT THE CATCH BASIN TO PREVENT FURTHER ERODED MATERIAL FROM ENTERING STORMWATER SYSTEM ** FOLLOWUP INSPECTION ON 05/31/23 ____________________________________________________________________________________________________________________ 5/24/2023 - PREVIOUS INSPECTION NOTES ** 05/24/23 BUILDER NEEDS TO OPEN THE CATCH BASIN IN THE ROAD SIDE SWALE ON RIGHT SIDE AND PUT A FORM OF AN EROSION CONTROL DEVICE IN PLACE TO PREVENT MORE SEDIMENT FROM ENTERING THE BASIN AND TO DITCH LINE ACROSS THE STREET. ** BUILDER WILL ALSO BE REQUIRED TO CLEAN CATCH BASIN , DRAINAGE PIPE UNDER ROAD AND DITCH OF ALL SEDIMENT BEFORE THE ROW FINAL WILL BE APPROVED. ** BUILDER NEEDS TO CLEAN UP TRASH TO PREVENT IT FROM ENTERING THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/30/23
ROW - DRAINAGE 05/24/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/24/23 BUILDER NEEDS TO OPEN THE CATCH BASIN IN THE ROAD SIDE SWALE ON RIGHT SIDE AND PUT A FORM OF AN EROSION CONTROL DEVICE IN PLACE TO PREVENT MORE SEDIMENT FROM ENTERING THE BASIN AND TO DITCH LINE ACROSS THE STREET. ** BUILDER WILL ALSO BE REQUIRED TO CLEAN CATCH BASIN , DRAINAGE PIPE UNDER ROAD AND DITCH OF ALL SEDIMENT BEFORE THE ROW FINAL WILL BE APPROVED. ** BUILDER NEEDS TO CLEAN UP TRASH TO PREVENT IT FROM ENTERING THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/30/23
ELECTRIC - EARLY POWER 04/24/2023 APPROVED JSTEWART
PEP TANK INSTALLATION REQUEST 04/13/2023 APPROVED TSCHWEERS
INSULATION 03/17/2023 APPROVED - AS NOTED JSTEWART
Note: 3/17/2023--Please seal Liquid line chase at AHU closet. Inspector Notes from Inspection 2420 3/8/2023--Missing Mull bar connection front window, will check at insulation. 3/7/2023 - PREVIOUS INSPECTION NOTES 3/7/2023--No energy calcs or product aproval onsite/ DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Missing Mull Bar connection front window. Inspector Notes from Inspection 2320 2/14/2023- superintendant onsite, missing front door detail on back order.
ALL ROUGH 03/08/2023 APPROVED - AS NOTED JSTEWART
Note: 3/8/2023--Missing Mull bar connection front window, will check at insulation. 3/7/2023 - PREVIOUS INSPECTION NOTES 3/7/2023--No energy calcs or product aproval onsite/ DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Missing Mull Bar connection front window. Inspector Notes from Inspection 2320 2/14/2023- superintendant onsite, missing front door detail on back order.
ALL ROUGH 03/07/2023 Disapproved - NO FEE JSTEWART
Note: 3/7/2023--No energy calcs or product aproval onsite/ DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Missing Mull Bar connection front window. Inspector Notes from Inspection 2320 2/14/2023- superintendant onsite, missing front door detail on back order.
ELECTRIC-TUG 03/07/2023 APPROVED JSTEWART
LATH/BRICK/ WATER BARRIER 02/14/2023 APPROVED - AS NOTED JSTEWART
Note: 2/14/2023- superintendant onsite, missing front door detail on back order.
ROOF VALLEY & METAL 02/08/2023 APPROVED JSTEWART
WALL SHEATHING 01/25/2023 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/25/2023 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 01/24/2023 APPROVED TBAKER
TIE BEAM / LINTEL 01/12/2023 APPROVED FWILLIS
MONOLITHIC SLAB 01/05/2023 APPROVED FWILLIS
WATER METER INSTALLATION REQUEST 01/04/2023 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 01/03/2023 APPROVED MGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/19/2023 09/21/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/19/2023 09/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/19/2023 09/20/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/11/2023 09/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 09/11/2023 09/19/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ZON COMPLETE 09/11/2023 09/11/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 09/01/2023 09/01/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation is off by .70' compared to COPC GPS and ITT as-built drawings.
MECH COMPLETE 09/01/2023 09/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 HOLD 08/17/2023 08/17/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation is off by .70' compared to COPC GPS and ITT as-built drawings.
BLD COMPLETE 03/08/2023 03/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/24/2023 01/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/24/2023 01/24/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 10/24/2022 11/01/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/24/2022 10/24/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/24/2022 10/24/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/12/2022 10/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 10/12/2022 10/19/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM CAN NOT IMPACT THE LOT TO THE RIGHT OF YOURS
ZON COMPLETE 10/12/2022 10/13/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 09/09/2022 09/09/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations off by.65' from ITT as-builts and COPC GPS
SWALE COMPLETE 09/01/2022 09/13/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/31/2022 09/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/31/2022 09/01/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 08/31/2022 09/08/2022
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 08/22/2022 08/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/22/2022 08/23/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 08/22/2022 08/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 08/22/2022 08/22/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
LOCATE COMPLETE 08/22/2022 08/25/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/22/2022 08/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/22/2022 08/29/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 08/22/2022 08/24/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Survey and site plan are missing the section number in the legal description.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 01/06/2024
SW ENG - INSPECTION 20 ¤20.00 01/06/2024
SW ENG - INSPECTION 20 ¤20.00 01/06/2024
SW ENG - INSPECTION 20 ¤20.00 01/06/2024
REINSPECTION RESIDENTIAL ¤40.00 01/06/2024
CONNECTION FEES ¤1,077.88 11/15/2022
WATER- TURN ON ¤25.00 11/15/2022
ADJUSTMENT 50% (¤366.24) 11/15/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/15/2022
INSPECTION - RESIDENTIAL ¤547.25 11/15/2022
PLAN REVIEW - RESIDENTIAL ¤155.22 11/15/2022
SW ENG INSPECTION 80 ¤80.00 11/15/2022
SW ENG PRE APRON ¤30.00 11/15/2022
SW ENG - REVIEW 20 ¤20.00 11/15/2022
SW ENG RES REVIEW 200 ¤200.00 11/15/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 11/15/2022
SEWER CREDIT (¤2,465.75) 11/15/2022
SEWER INSPECTION ¤25.00 11/15/2022
SEWER CAPITAL FACILITY ¤4,939.76 11/15/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 11/15/2022
SITE PLAN 30 ¤30.00 11/15/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 11/15/2022
IMPACT FEE FIRE ¤388.65 11/15/2022
IMPACT FEE PARKS ¤1,455.13 11/15/2022
IMPACT FEE SCHOOL ¤3,600.00 11/15/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 11/15/2022
WATER -IRRIGATION INSPECTION ¤25.00 11/15/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 11/15/2022
SURCHARGE FS 533.721 ¤2.47 11/15/2022
SURCHARGE - FS 468.631 ¤3.71 11/15/2022
SW ENG - FOUNDATION SURVEY ¤20.00 11/15/2022
Fees Total Due: ¤0.00 Total Paid: ¤15,225.35