Permit #2022081202
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00370-0240 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00370 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 631-929-5500 |
| Location Address: 13 WHITE HAVEN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/14/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOGUE RE DEVELOPMENT LLC |
|
Address SUITE 300 ORLANDO, FL 32819 |
|
Address 7450 DR PHILLIPS BLVD ORLANDO, FL 32819 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 07/19/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: 7/19/23= At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. 7/12/2023 - PREVIOUS INSPECTION NOTES 07/12/23 NEED TO FIX THE WASHOUTS ON THE LEFT SIDE PROPERTY SLOPE. FILL IN, RESLOPE AND RESET SOD BEFORE ROW FINAL PASSAGE. PLEASE SEE PHOTO FOR REFERENCE. ______________________________________________________________________________________________________________________ 04/3/23= FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| U -UTILITY RESIDENTIAL FINAL | 07/18/2023 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 07/18/2023 | FINAL APPROVED | MKRASKI |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/12/2023 | APPROVED | FSLADISH |
| Note: 5/26/2023 - PREVIOUS INSPECTION NOTES 05/26/23 PLEASE SEE FINAL SURVEY DOCUMENT FOR NEEDED INFORMATION. WE NEED TO DETERMINE IF THE DRAINAGE WILL FLOW TO THE FRONT OF THE PROPERTY FROM THIS POINT FORWARD. ___________________________________________________________________________________________________________________ 04/3/23= FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/12/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 07/12/23 FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| ROW - STORMWATER FINAL | 07/12/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 07/12/23 NEED TO FIX THE WASHOUTS ON THE LEFT SIDE PROPERTY SLOPE. FILL IN, RESLOPE AND RESET SOD BEFORE ROW FINAL PASSAGE. PLEASE SEE PHOTO FOR REFERENCE. ______________________________________________________________________________________________________________________ 04/3/23= FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| ROW - FINAL APRON (AFTER POUR) | 07/12/2023 | APPROVED | FSLADISH |
| Note: 07/12/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. LOOKED GOOD AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 07/12/23 FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| ROW- PROJECT STATUS | 06/14/2023 | APPROVED | GBERTOLA |
| Note: meeting with the cm | |||
| ROW- PROJECT STATUS | 06/02/2023 | APPROVED | GBERTOLA |
| Note: 06/2/23= WE HAVE CONVERSATION WITH THE CM ABOUT THE GRADE ON THE RIGHT BACK CORNER | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/26/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 05/26/23 PLEASE SEE FINAL SURVEY DOCUMENT FOR NEEDED INFORMATION. WE NEED TO DETERMINE IF THE DRAINAGE WILL FLOW TO THE FRONT OF THE PROPERTY FROM THIS POINT FORWARD. ___________________________________________________________________________________________________________________ 04/3/23= FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| ELECTRIC - EARLY POWER | 05/24/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1344. Release Power 5/23/2023 - PREVIOUS INSPECTION NOTES 4/10/2023 - PREVIOUS INSPECTION NOTES 1. Power under sink not safed off 2. Smoke outside master bedroom not safed off 3. Load side conductors in meter main can not be terminated before power has been released 5-23-23 1. Load side conductors can not be hooked up till power is released. 2. House locked. | |||
| ELECTRIC - EARLY POWER | 05/23/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 1. Power under sink not safed off 2. Smoke outside master bedroom not safed off 3. Load side conductors in meter main can not be terminated before power has been released 5-23-23 1. Load side conductors can not be hooked up till power is released. 2. House locked. | |||
| ELECTRIC - EARLY POWER | 04/10/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Power under sink not safed off 2. Smoke outside master bedroom not safed off 3. Load side conductors in meter main can not be terminated before power has been released | |||
| ROW- PROJECT STATUS | 04/03/2023 | APPROVED | GBERTOLA |
| Note: 04/3/23= FROM THE LEFT BACK CORNER WATER GO TO THE DITCH ON THE LEFT SIDE.COMMON SWALE TO THE DITCH LINE IN THE BACK PROPERTY LINE FROM THE RIGHT SIDE CORNER OF THE HOUSE WATER GOING TO THE FRONT COMMON SWALE FROM THE LEFT SIDE CORNER OF THE HOUSE WATER WILL MOVE TO THE FRONT BERMO ON THE LEFT SIDE | |||
| ROW- PRE-APRON (PRE-POUR) | 03/29/2023 | APPROVED | FSLADISH |
| Note: 03/29/23 CORRECTIONS MADE READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 3/28/2023 - PREVIOUS INSPECTION NOTES NEED PUT DIRT UP AGAINST THE FORMS SO THERE IS NO OVER POURED CONCRETE COMING OUT FROM UNDER FORMS. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED PUT DIRT UP AGAINST THE FORMS SO THERE IS NO OVER POURED CONCRETE COMING OUT FROM UNDER FORMS. | |||
| U-CROSS CONNECTION | 03/17/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| GRAVITY SEWER TEST | 03/17/2023 | APPROVED | MKRASKI |
| U - SEWER TIE IN | 03/17/2023 | APPROVED | MKRASKI |
| INSULATION | 02/10/2023 | APPROVED | JSTEWART |
| Note: 2/9/2023 - PREVIOUS INSPECTION NOTES 2/9/23 Met Brian with JNS walked job and marked areas that need to be repaired, Missing baffles insulation not meeting bottom cord on exterior walls in vaulted areas, and other issues 2/6/2023 - PREVIOUS INSPECTION NOTES 1. Missing card board baffles in some locations 2. Divider cardboard missing from vaulted ceilings to lower ceiling 3. Above electrical panel needs to be fire foamed better | |||
| INSULATION | 02/09/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/9/23 Met Brian with JNS walked job and marked areas that need to be repaired, Missing baffles insulation not meeting bottom cord on exterior walls in vaulted areas, and other issues 2/6/2023 - PREVIOUS INSPECTION NOTES 1. Missing card board baffles in some locations 2. Divider cardboard missing from vaulted ceilings to lower ceiling 3. Above electrical panel needs to be fire foamed better | |||
| PEP TANK INSTALLATION REQUEST | 02/07/2023 | APPROVED | TSCHWEERS |
| INSULATION | 02/06/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Missing card board baffles in some locations 2. Divider cardboard missing from vaulted ceilings to lower ceiling 3. Above electrical panel needs to be fire foamed better | |||
| ALL ROUGH | 02/03/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Front double window missing mullbar Check on insulation | |||
| ALL ROUGH | 02/02/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/2/23 All items not corrected from privious inspection, Check all window anchoring, stopped inspection 1/31/2023 - PREVIOUS INSPECTION NOTES 1. No 50 lbs. water pressure 2. Failed 5' head pressure 3. Missing anchors for master bedroom window Stopped inspection in master be sure to CHECK all window anchors | |||
| ALL ROUGH | 01/31/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No 50 lbs. water pressure 2. Failed 5' head pressure 3. Missing anchors for master bedroom window Stopped inspection in master be sure to CHECK all window anchors | |||
| LATH/BRICK/ WATER BARRIER | 01/31/2023 | APPROVED | MKRASKI |
| Note: Inspector Notes from Inspection 2450 | |||
| ALL ROUGH | 01/30/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1/30/23 Previous inspection notes not fixed stopped inspection 1/18/23: Permit box needs to be mounted in front area of property. (Found it laying in garage) Address needs to be visable from street & contrasting in color per FBC 319.1 & 501.2.. | |||
| WALL SHEATHING | 01/18/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 1/18/23: Permit box needs to be mounted in front area of property. (Found it laying in garage) Address needs to be visable from street & contrasting in color per FBC 319.1 & 501.2.. 1/17/2023 - PREVIOUS INSPECTION NOTES Tape needs to be removed from joints to show nails | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/18/2023 | APPROVED | RSIMS |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES OSB needs to be removed from clean outs STOPPED inspection Trade work should not start untill after Sheathing braces and tie downs inspection has been approved | |||
| ROOF VALLEY & METAL | 01/17/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/17/2023 | Disapproved - NO FEE | MKRASKI |
| Note: OSB needs to be removed from clean outs STOPPED inspection Trade work should not start untill after Sheathing braces and tie downs inspection has been approved | |||
| WALL SHEATHING | 01/17/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Tape needs to be removed from joints to show nails | |||
| ELECTRIC-TUG | 01/13/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:15 PM | |||
| TIE BEAM / LINTEL | 01/05/2023 | APPROVED | MKRASKI |
| TIE BEAM / LINTEL | 01/04/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1/4/23 1. Clean outs must be cleaned of all debris FBC 606.3.5.2 2. Address not per FBC R319.1 12/29/2022 - PREVIOUS INSPECTION NOTES 12/27/2022 - PREVIOUS INSPECTION NOTES 1. Dowels can not be within 2'' of face of block, stopped inspection check all clean outs FBC 606.13.5 2. Address no visible from road FBC R319.1 12/29/22 - ALL THE CLEAN-OUTS ARE BOARDED UP. NO ONE ON SITE TO REMOVE. ON SITE AT 1:30PM. | |||
| TIE BEAM / LINTEL | 12/29/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: 12/27/2022 - PREVIOUS INSPECTION NOTES 1. Dowels can not be within 2'' of face of block, stopped inspection check all clean outs FBC 606.13.5 2. Address no visible from road FBC R319.1 12/29/22 - ALL THE CLEAN-OUTS ON THIS DUPLEX ARE BOARDED UP. NO ONE ON SITE TO REMOVE. ON SITE AT 1:30PM. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/29/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/27/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Dowels can not be within 2'' of face of block, stopped inspection check all clean outs FBC 606.13.5 2. Address no visible from road FBC R319.1 | |||
| MONOLITHIC SLAB | 12/19/2022 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/15/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/15/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/20/2023 | 03/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/18/2023 | 01/18/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/17/2023 | 01/17/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide truss reaction for Truss A04. | |||
| BLD | HOLD | 01/17/2023 | 01/18/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comment 1. Provide truss reaction for Truss A04. Truss layout was submitted. | |||
| ENGIN1 | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/28/2022 | 12/28/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/06/2022 | 09/13/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/06/2022 | 09/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/06/2022 | 09/06/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/22/2022 | 08/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/22/2022 | 08/24/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/22/2022 | 08/25/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/22/2022 | 08/25/2022 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See Checklist dated 8/25/22. Drainage in the rear should split in the middle and flow to the front from each side. Right side drainag elevations are higher then the adjacent lot. Storm water cannot impact that adjacent lot as proposed. | |||
| ZON | COMPLETE | 08/22/2022 | 08/25/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/22/2022 | 12/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/19/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/19/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/19/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/19/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/19/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 12/14/2022 |
| SEWER CREDIT | (¤1,466.00) | 12/14/2022 |
| SEWER INSPECTION | ¤25.00 | 12/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 12/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 12/14/2022 |
| SITE PLAN 30 | ¤30.00 | 12/14/2022 |
| WATER- TURN ON | ¤25.00 | 12/14/2022 |
| ADJUSTMENT 50% | (¤405.07) | 12/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/14/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 12/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 12/14/2022 |
| CONNECTION FEES | ¤1,077.88 | 12/14/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 12/14/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 12/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 12/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 12/14/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 12/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 12/14/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 12/14/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 12/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 12/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,559.48 |