Permit #2022081367

Permit Details

Status: CANCEL

Parcel Id: 19-11-31-0330-00000-00B0
Total Square Footage: 1050 sqft
Block: 00000
Subdivision: 2298 - AMERICAN VILLAGE
Job Phone: 386-931-6577
Location Address: 67 GREEN CIR
Type: BC - BUILDING COMMERCIAL
Issue Date: 08/24/2022
NOC: Unknown
Applicant name: LUIS JORGE MEDEIROS
Owner: HAMMOCK REAL ESTATE DEVELOPMENT LLC

Address

200 OCEAN CREST DRIVE #1111

PALM COAST, FL 32137

Lot: 00B0
Contracted Stated Job Value: ¤50,000.00
Job Description: POOL PAVILION - AMENITY BUILDING
Type: CN
Original Permit #: 2021030883

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone Fax
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CGC1519145 (Exp: 08/31/2026) 386-931-6577 386-263-3331

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

1351 HAZELNUT ST

BUNNELL, FL 32110

CFC1427527 (Exp: 08/31/2026) 386-445-2532 386-445-5575
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JOSE E ORTIZ JR
Status Location Address Mailing Address State License Number Phone
CANCEL

4601 E MOODY BLVD

BUNNELL, FL 32110

SUITE B7

BUNNELL, FL 32110

RC29027619 (Exp: 08/31/2023) 386-503-6922
HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

1351 HAZELNUT ST

BUNNELL, FL 32110

CFC1427527 (Exp: 08/31/2026) 386-445-2532 386-445-5575
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JOSE E ORTIZ JR
Status Location Address Mailing Address State License Number Phone
CANCEL

4601 E MOODY BLVD

BUNNELL, FL 32110

SUITE B7

BUNNELL, FL 32110

RC29027619 (Exp: 08/31/2023) 386-503-6922

Inspection History

Type Request Date Result Inspector
EXTERIOR STRAP/CLIP 02/16/2023 APPROVED - AS NOTED JWALKER
Note: The strapping holding 2x rafter to the LVL beam are approved. The anchors holding the LVL to the block columns still need to be detailed and submitted to the building department by the engineer. More notes can be found on the 2/15/23 roof braced inspection.
ROOF SHEATHING / BRACE / TIE DOWN 02/15/2023 Disapproved - NO FEE JWALKER
Note: 2/15/23 1. Please have engineer specifi if P.T. rafter and collar ties are to be used. Or if the existing non P.T. grade #2 rafters and collars ties can remain. 2. Anchor detail for LVLs to block colums has not been provided. Please provide nail patter for fastening the two LVLs together. 3. Gable end framing and anchoring detail has not been provided. Submitt changes and revisions to the building department. 2/13/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department.
ROOF SHEATHING / BRACE / TIE DOWN 02/13/2023 CANCELLED BY APPLICANT JWALKER
Note: THIS IS A REINSPECTION Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department.
WATER METER INSTALLATION REQUEST 06/17/2022 CANCELLED BY INSPECTOR LFITZGERALD
Note: to be inspected on the site permit
WATER SERVICE 06/16/2022 CANCELLED BY INSPECTOR MGIBSON
Note: WRONG INSPECTION CALLED, CONTRACTOR WAS LOOKING FOR A METER TO BE SET, SPOKE TO CONTRACTOR AND EXPLAINED TO HIM THAT REQUIRED A RPZ BACKFLOW DEVICE AND THAT PLUMBER NEEDS TO GO TO THE UTILITY DEPARTMENT
ELECTRIC OTHER 05/11/2022 CANCELLED BY INSPECTOR JMUNSON
Note: Dont do TUGs on commercial buildings must set temp pole or wait till early power.
ROOF SHEATHING / BRACE / TIE DOWN 04/28/2022 Disapproved - NO FEE JWALKER
Note: Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department.
LATH/BRICK/WATER BARRIER 12/29/2021 APPROVED FWILLIS
MONOLITHIC SLAB 06/30/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH 06/18/2021 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NOT READY NO TEST ON WATER OR SANITARY
PLUMBING 1ST ROUGH 06/11/2021 Disapproved -FEE REQUIRED JGIBSON
Note: NOT READY NO TEST ON WATER OR SANITARY
FOUNDATION SURVEY - OFFICE USE ONLY
ELECTRIC FINAL
FRAMING
PLUMBING 2ND ROUGH
GRAVITY SEWER
BLD - SEWER TIE IN
PLUMBING FINAL
HVAC ROUGH
HVAC FINAL
ELECTRIC 1ST ROUGH
ELECTRIC 2ND ROUGH
ELECTRIC - EARLY POWER
U - UTILITY COMMERCIAL FINAL
ROOF SHEATHING / BRACE / TIE DOWN
Note: 2/15/2023 - PREVIOUS INSPECTION NOTES 2/15/23 1. Please have engineer specifi if P.T. rafter and collar ties are to be used. Or if the existing non P.T. grade #2 rafters and collars ties can remain. 2. Anchor detail for LVLs to block colums has not been provided. Please provide nail patter for fastening the two LVLs together. 3. Gable end framing and anchoring detail has not been provided. Submitt changes and revisions to the building department. 2/13/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department.
INSULATION
BUILDING FINAL
FIRE FINAL
EXTERIOR ARCHITECTURAL FEATURES

Review History

Department Status Date In Date Out
BLD COMPLETE 11/29/2022 12/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ARCHR COMPLETE 08/24/2022 08/25/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD HOLD 08/24/2022 08/29/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Revised Cross Section Detail calls-out #2 Grade Lumber. Provide Grade of Lumber to be installed.
DSD COMPLETE 08/24/2022 08/25/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC COMPLETE 08/24/2022 08/25/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 CANCEL 08/24/2022 08/25/2022
Note: not needed
MECH CANCEL 08/24/2022 08/25/2022
Note: not needed
PLLA COMPLETE 08/24/2022 08/25/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
PLUM COMPLETE 08/24/2022 08/30/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
UD1 COMPLETE 08/24/2022 08/25/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM
ARCHR COMPLETE 05/04/2021 05/06/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 04/22/2021 04/22/2021
Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/22/2021 05/06/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ARCHR HOLD 04/22/2021 04/23/2021
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Architectural plan is missing the color chart. Please provide colors to be used for the building and roof.
PLLA COMPLETE 03/17/2021 03/31/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - dramirez@ci.palm-coast.fl.us Landscaping for this site will be part of the site permit.
ARCHR HOLD 03/12/2021 03/31/2021
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - dramirez@ci.palm-coast.fl.us Provide DO approved architectural plans.
BLD HOLD 03/12/2021 03/26/2021
Note: Held By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us 1. Clarify footer detail as to the number of # 5 rebar and depth as there are (2) different details per FBC 7th Ed. Sec. 107.2.1. 2. Provide truss layout per FBCR 7th Ed. Sec. R802.10.2.
DSD COMPLETE 03/12/2021 03/18/2021
Note: Released By: JACQUELINE GONZALEZ - - JGONZALEZ@CI.PALM-COAST.FL.US
ELEC COMPLETE 03/12/2021 03/17/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 03/12/2021 03/23/2021
Note: Released By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
MECH COMPLETE 03/12/2021 03/18/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/12/2021 03/26/2021
Note: Released By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us
UD1 HOLD 03/12/2021 03/16/2021
Note: Held By: CHRIS JOHNSON - - cjohnson@ci.palm-coast.fl.us Utility fees, agreements and FDEP permits or Design Engineers letter of determination must be completed before a building permit will be issued.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤212.50) 08/24/2022
ADMINISTRATIVE - COMMERCIAL ¤75.00 08/24/2022
INSPECTION COMMERCIAL ¤350.00 08/24/2022
CONTRACTOR CHANGE ¤40.00 08/24/2022
REINSPECTION FEE ¤40.00 08/24/2022
SURCHARGE FS 533.721 ¤2.49 08/24/2022
SURCHARGE - FS 468.631 ¤3.73 08/24/2022
SITE PLAN 30 ¤30.00 08/24/2022
Fees Total Due: ¤0.00 Total Paid: ¤328.72