I want to search for...

Permit #2022081370

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00690-0060
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00690
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 631-929-5500
Location Address: 80 PITTMAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/13/2023
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: 96 TRUST PALM COAST RESI A LLC

Address

SUITE 210

WEST PALM BEACH, FL 33401

Address

515 N FLAGLER DRIVE

WEST PALM BEACH, FL 33401

Lot: 0060
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Home
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/29/2023 FINAL APPROVED KSANDOE
U-CROSS CONNECTION 08/29/2023 APPROVED - AS NOTED LFITZGERALD
Note: now hs potable irrigation added with PVB installed-no cross connection
ROW - FINAL APRON (AFTER POUR) 08/29/2023 APPROVED GBERTOLA
Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 08/29/2023 APPROVED GBERTOLA
Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 08/29/2023 APPROVED - AS NOTED LFITZGERALD
Note: realign water meter assembly so is linear-pic and send
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/25/2023 APPROVED FSLADISH
Note: 08/25/23 Inspector Notes from Inspection 9270 06/01/23 READY TO POUR. LOOKED GOOD AT TIME OF INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW FIELD SURVEY /GRADING CERTIFICATION 08/25/2023 APPROVED - AS NOTED FSLADISH
Note: 08/25/23 DRAINAGE WILL WORK. EVEN THOUGH A COMMON SWALE WAS PROPOSED IN THIS CASE THE DRAINAGE WILL BE OK AND WORK WITH MINIMAL DIFFERENCE.
ROW- PROJECT STATUS 08/25/2023 APPROVED GBERTOLA
Note: Inspector Notes from Inspection 9465 08/25/23 DRAINAGE WILL WORK. EVEN THOUGH A COMMON SWALE WAS PROPOSED IN THIS CASE THE DRAINAGE WILL BE OK AND WORK WITH MINIMAL DIFFERENCE.
ELECTRIC - EARLY POWER 07/10/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1010. Release Power Inspector Notes from Inspection 2200 Emailed FPL @ 1028. Release Power 4/21/2023 - PREVIOUS INSPECTION NOTES
GRAVITY SEWER TEST 06/06/2023 APPROVED MGIBSON
U - SEWER TIE IN 06/06/2023 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 06/01/2023 APPROVED - AS NOTED FSLADISH
Note: 06/01/23 READY TO POUR. LOOKED GOOD AT TIME OF INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
U-CROSS CONNECTION 06/01/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
PEP TANK INSTALLATION REQUEST 05/17/2023 APPROVED CSTONE
INSULATION 05/17/2023 APPROVED KSANDOE
LATH/BRICK/ WATER BARRIER 05/12/2023 APPROVED KSANDOE
ALL ROUGH 05/12/2023 APPROVED KSANDOE
ELECTRIC-TUG 04/27/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1028. Release Power 4/21/2023 - PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 04/26/2023 APPROVED KSANDOE
WALL SHEATHING 04/21/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2023 APPROVED - AS NOTED KSANDOE
Note: A16 missing bracing MTS12 not nailed correctly over garage Nailing over front entry incomplete
ELECTRIC-TUG 04/21/2023 CANCELLED BY APPLICANT KSANDOE
FOUND SURVEY APPROVED (OFFICE) 04/03/2023 APPROVED TBAKER
TIE BEAM / LINTEL 04/03/2023 APPROVED RMARTIN
MONOLITHIC SLAB 03/22/2023 APPROVED KSANDOE
Note: 3/21/2023 - PREVIOUS INSPECTION NOTES Missing Ufer
MONOLITHIC SLAB 03/21/2023 Disapproved - NO FEE KSANDOE
Note: Missing Ufer
PLUMBING 1ST ROUGH UNDERGROUND 03/16/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/16/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 04/28/2023 04/28/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 04/14/2023 04/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 03/31/2023 03/31/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/31/2023 04/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/06/2022 09/13/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/06/2022 09/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/06/2022 09/06/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 08/25/2022 12/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 08/24/2022 08/30/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/24/2022 08/25/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 08/24/2022 08/25/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/24/2022 08/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/24/2022 08/26/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 08/24/2022 08/25/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 08/24/2022 08/31/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM WATER IS BEING TRAPED IN BACK YARD
ZON COMPLETE 08/24/2022 08/30/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 08/29/2023
SW ENG REINSPECTION 20 ¤20.00 08/29/2023
PLAN REVIEW - REVISION ¤32.50 08/29/2023
PLAN REVIEW - REVISION ¤32.50 08/29/2023
CONNECTION FEES ¤1,166.26 03/13/2023
WATER- TURN ON ¤25.00 03/13/2023
ADJUSTMENT 50% (¤405.07) 03/13/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/13/2023
INSPECTION - RESIDENTIAL ¤607.75 03/13/2023
PLAN REVIEW - RESIDENTIAL ¤172.38 03/13/2023
SW ENG - REVIEW 20 ¤20.00 03/13/2023
SW ENG RES REVIEW 200 ¤200.00 03/13/2023
3% TRANS IMPACT FEE CREDIT (¤52.92) 03/13/2023
SEWER CREDIT (¤2,511.12) 03/13/2023
SEWER INSPECTION ¤25.00 03/13/2023
SEWER CAPITAL FACILITY ¤5,344.82 03/13/2023
WATER CREDIT (¤70.18) 03/13/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 03/13/2023
SITE PLAN 30 ¤30.00 03/13/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/13/2023
IMPACT FEE FIRE ¤388.65 03/13/2023
IMPACT FEE PARKS ¤1,455.13 03/13/2023
IMPACT FEE SCHOOL ¤3,600.00 03/13/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 03/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 03/13/2023
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/13/2023
SURCHARGE FS 533.721 ¤2.69 03/13/2023
SURCHARGE - FS 468.631 ¤4.04 03/13/2023
SW ENG - FOUNDATION SURVEY ¤20.00 03/13/2023
SW ENG INSPECTION 80 ¤80.00 03/13/2023
SW ENG PRE APRON ¤30.00 03/13/2023
Fees Total Due: ¤0.00 Total Paid: ¤15,925.00