Permit #2022081503
Permit Details
Status: COED
| Parcel Id: 15-11-31-2830-00000-0220 |
| CONDITIONED SPACE: 2490 sqft |
| CONDITIONED SPACE: 906 sqft |
| GARAGE: 1055 sqft |
| OPENED PORCH (WITH ROOF) : 79 sqft |
| OPENED PORCH (WITH ROOF) : 274 sqft |
| OPENED PORCH (WITH ROOF) : 526 sqft |
| Total Square Footage: 5330 sqft |
| Block: 00000 |
| Subdivision: 1071 - FRONT STREET @ GRAND HAVEN PHASE 1 |
| Job Phone: 386-627-0430 |
| Location Address: 26 CHINIER ST |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/12/2022 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: SIFODASKALAKIS FREDERICK C & STACEY M H&W |
|
Address 11 COOPER AVENUE WEATOGUE, CT 06089 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤500,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 04/05/2024 | APPROVED - AS NOTED | GBERTOLA |
| Note: 4/5/24=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 04/03/24 AFTER WALKING THE PROPERTY THE DRAINAGE ON THE LEFT SIDE WILL WORK. I WOULD REQUEST THAT ALONG THE PROPERTY LINE THERE IS A 12-15' SECTION THAT NEEDS TO HAVE A STRIP OF SOD TO HELP KEEP DRAINAGE FLOWING. I ALSO NOTICED THAT IN THE FRONT RIGHT FROM THE WATER BOX TO THE SIDE WALK IS LOW. THIS AREA NEEDS TO BE RAISED UP TO MATCH GRADE OF SIDEWALK. THIS GOES FOR THE ENTIRE LENGTH OF THE SIDEWALK AS WELL. THE SOD ELEVATION SHOULD BE LEVEL TO SIDEWALK TO PREVENT INJURY. I AM APPROVING THIS INSPECTION AS NOTED AND WILL CHECK AT THE FINAL ROW INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ------------------------------------------------------------------------------ 3/26/2024 - PREVIOUS INSPECTION NOTES 03/26/24 LEFT SIDE BETWEEN THE HOMES NEEDS TO BE REGRADED TO REFLECT THE FINAL SURVEY. THERE IS A LARGE ELEVATION CHANGE WHERE THE TWO PROPERTIES JOIN. THE SOD NEEDS TO MATCH GRADE AND ALL FLOW MUST FLOW ACCORDING TO FINAL SURVEY. PLEASE MAKE CORRECTIONS BY CREATING A COMMON SWALE AS INDICATED NOTE TO INSPECTOR MAKE SURE LEFT SIDE OF THE PROPERTY DRAINAGE IS A COMMON SWALE WHERE THE RESIDENTS WATER AT 28 WILL FLOW ON TO THE NEW CONSTRUCTION PROPERTY THEN MAKE THE COMMON SWALE LIKE THEY PROPOSED ON THE SITE PLAN. ANY QUESTIONS CALL PARREN | |||
| U -UTILITY RESIDENTIAL FINAL | 04/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please raise up sewer C/O so not get covered over with grass-send pic when completed -discussed with Peter | |||
| ROW - STORMWATER FINAL | 04/04/2024 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: Inspector Notes from Inspection 9465 04/03/24 AFTER WALKING THE PROPERTY THE DRAINAGE ON THE LEFT SIDE WILL WORK. I WOULD REQUEST THAT ALONG THE PROPERTY LINE THERE IS A 12-15' SECTION THAT NEEDS TO HAVE A STRIP OF SOD TO HELP KEEP DRAINAGE FLOWING. I ALSO NOTICED THAT IN THE FRONT RIGHT FROM THE WATER BOX TO THE SIDE WALK IS LOW. THIS AREA NEEDS TO BE RAISED UP TO MATCH GRADE OF SIDEWALK. THIS GOES FOR THE ENTIRE LENGTH OF THE SIDEWALK AS WELL. THE SOD ELEVATION SHOULD BE LEVEL TO SIDEWALK TO PREVENT INJURY. I AM APPROVING THIS INSPECTION AS NOTED AND WILL CHECK AT THE FINAL ROW INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ------------------------------------------------------------------------------ 3/26/2024 - PREVIOUS INSPECTION NOTES 03/26/24 LEFT SIDE BETWEEN THE HOMES NEEDS TO BE REGRADED TO REFLECT THE FINAL SURVEY. THERE IS A LARGE ELEVATION CHANGE WHERE THE TWO PROPERTIES JOIN. THE SOD NEEDS TO MATCH GRADE AND ALL FLOW MUST FLOW ACCORDING TO FINAL SURVEY. PLEASE MAKE CORRECTIONS BY CREATING A COMMON SWALE AS INDICATED NOTE TO INSPECTOR MAKE SURE LEFT SIDE OF THE PROPERTY DRAINAGE IS A COMMON SWALE WHERE THE RESIDENTS WATER AT 28 WILL FLOW ON TO THE NEW CONSTRUCTION PROPERTY THEN MAKE THE COMMON SWALE LIKE THEY PROPOSED ON THE SITE PLAN. ANY QUESTIONS CALL PARREN | |||
| BLD - BUILDING FINAL | 04/04/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 04/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has well-no cross connection-ALSO has irrigation meter which will not be needed-spoke with builder -Peter to contact city to remove | |||
| ROW - FINAL APRON (AFTER POUR) | 04/04/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 04/03/24 AFTER WALKING THE PROPERTY THE DRAINAGE ON THE LEFT SIDE WILL WORK. I WOULD REQUEST THAT ALONG THE PROPERTY LINE THERE IS A 12-15' SECTION THAT NEEDS TO HAVE A STRIP OF SOD TO HELP KEEP DRAINAGE FLOWING. I ALSO NOTICED THAT IN THE FRONT RIGHT FROM THE WATER BOX TO THE SIDE WALK IS LOW. THIS AREA NEEDS TO BE RAISED UP TO MATCH GRADE OF SIDEWALK. THIS GOES FOR THE ENTIRE LENGTH OF THE SIDEWALK AS WELL. THE SOD ELEVATION SHOULD BE LEVEL TO SIDEWALK TO PREVENT INJURY. I AM APPROVING THIS INSPECTION AS NOTED AND WILL CHECK AT THE FINAL ROW INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ------------------------------------------------------------------------------ 3/26/2024 - PREVIOUS INSPECTION NOTES 03/26/24 LEFT SIDE BETWEEN THE HOMES NEEDS TO BE REGRADED TO REFLECT THE FINAL SURVEY. THERE IS A LARGE ELEVATION CHANGE WHERE THE TWO PROPERTIES JOIN. THE SOD NEEDS TO MATCH GRADE AND ALL FLOW MUST FLOW ACCORDING TO FINAL SURVEY. PLEASE MAKE CORRECTIONS BY CREATING A COMMON SWALE AS INDICATED NOTE TO INSPECTOR MAKE SURE LEFT SIDE OF THE PROPERTY DRAINAGE IS A COMMON SWALE WHERE THE RESIDENTS WATER AT 28 WILL FLOW ON TO THE NEW CONSTRUCTION PROPERTY THEN MAKE THE COMMON SWALE LIKE THEY PROPOSED ON THE SITE PLAN. ANY QUESTIONS CALL PARREN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/03/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/03/24 AFTER WALKING THE PROPERTY THE DRAINAGE ON THE LEFT SIDE WILL WORK. I WOULD REQUEST THAT ALONG THE PROPERTY LINE THERE IS A 12-15' SECTION THAT NEEDS TO HAVE A STRIP OF SOD TO HELP KEEP DRAINAGE FLOWING. I ALSO NOTICED THAT IN THE FRONT RIGHT FROM THE WATER BOX TO THE SIDE WALK IS LOW. THIS AREA NEEDS TO BE RAISED UP TO MATCH GRADE OF SIDEWALK. THIS GOES FOR THE ENTIRE LENGTH OF THE SIDEWALK AS WELL. THE SOD ELEVATION SHOULD BE LEVEL TO SIDEWALK TO PREVENT INJURY. I AM APPROVING THIS INSPECTION AS NOTED AND WILL CHECK AT THE FINAL ROW INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ------------------------------------------------------------------------------ 3/26/2024 - PREVIOUS INSPECTION NOTES 03/26/24 LEFT SIDE BETWEEN THE HOMES NEEDS TO BE REGRADED TO REFLECT THE FINAL SURVEY. THERE IS A LARGE ELEVATION CHANGE WHERE THE TWO PROPERTIES JOIN. THE SOD NEEDS TO MATCH GRADE AND ALL FLOW MUST FLOW ACCORDING TO FINAL SURVEY. PLEASE MAKE CORRECTIONS BY CREATING A COMMON SWALE AS INDICATED NOTE TO INSPECTOR MAKE SURE LEFT SIDE OF THE PROPERTY DRAINAGE IS A COMMON SWALE WHERE THE RESIDENTS WATER AT 28 WILL FLOW ON TO THE NEW CONSTRUCTION PROPERTY THEN MAKE THE COMMON SWALE LIKE THEY PROPOSED ON THE SITE PLAN. ANY QUESTIONS CALL PARREN | |||
| ROW- PROJECT STATUS | 04/02/2024 | APPROVED | TPOLACEK |
| Note: SPOKE TO BUILDER AND GRADER TO DISCUSS LEFT SIDE DRAINAGE. THEY WILL BE CREATING A COMMON SWALE THAT SPLITS AT THE LEFT PROPERTIES DOWN SPOUT. IT SHOULD FLOW TO THE BACK AROUND THE PLANTER AREA INTO THE REAR DRAINAGE CONVEYANCE AND TO THE FRONT OVER THE SIDEWALK ALLOWING BOTH PROPERTIES TO DRAIN. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/26/2024 | APPROVED | TPOLACEK |
| Note: 03/26/24 SURVEY NUMBERS INDICATE PROPER FLOW. THIS IS NOT REFELCTED IN THE FIELD. i WILL APPROVE THE SURVEY AS THE NUMBERS WORK. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. NOTE TO INSPECTOR MAKE SURE LEFT SIDE OF THE PROPERTY DRAINAGE IS A COMMON SWALE WHERE THE RESIDENTS WATER AT 28 WILL FLOW ON TO THE NEW CONSTRUCTION PROPERTY THEN MAKE THE COMMON SWALE LIKE THEY PROPOSED ON THE SITE PLAN. ANY QUESTIONS CALL PARREN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/26/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 03/26/24 LEFT SIDE BETWEEN THE HOMES NEEDS TO BE REGRADED TO REFLECT THE FINAL SURVEY. THERE IS A LARGE ELEVATION CHANGE WHERE THE TWO PROPERTIES JOIN. THE SOD NEEDS TO MATCH GRADE AND ALL FLOW MUST FLOW ACCORDING TO FINAL SURVEY. PLEASE MAKE CORRECTIONS BY CREATING A COMMON SWALE AS INDICATED NOTE TO INSPECTOR MAKE SURE LEFT SIDE OF THE PROPERTY DRAINAGE IS A COMMON SWALE WHERE THE RESIDENTS WATER AT 28 WILL FLOW ON TO THE NEW CONSTRUCTION PROPERTY THEN MAKE THE COMMON SWALE LIKE THEY PROPOSED ON THE SITE PLAN. ANY QUESTIONS CALL PARREN | |||
| ROW- PRE-APRON (PRE-POUR) | 03/11/2024 | APPROVED | PFLANAGAN |
| Note: READY TO POUR SIDEWALK ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - DRAINAGE | 03/06/2024 | APPROVED | PFLANAGAN |
| Note: SPOKE WITH RESIDENT ABOUT THE BERM ALONG THE LEFT SIDE OF HOUSE BUILDER WILL HAVE TO REMOVE BERM AND ALLOW THE WATER FROM HER PROPERTY TO RUN ON TO THERE PROPERTY AND MAKE A COMMON SWALE. ---------------------------------------------------------------------------------- 3/5/2024 - PREVIOUS INSPECTION NOTES NEIGHBOR AT 28 STATES CONSTRUCTION IS CAUSING SWALE ISSUES RESIDENT IS REQUESTING CONTACT 386-569-1868 MH | |||
| ROW - DRAINAGE | 03/05/2024 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: NEIGHBOR AT 28 STATES CONSTRUCTION IS CAUSING SWALE ISSUES RESIDENT IS REQUESTING CONTACT 386-569-1868 MH | |||
| ROW - DRAINAGE | 09/20/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTIONS MADE ------------------------------------------------------------- 9/13/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO RE-ESTABLISH THE SILT FENCE ON EACH SIDE OF THE LOT SO DIRT & SEDIMENT DONT WASH IN ON THE ADJACENT LOTS 2) NEED TO CLEAN ALL DIRT & SEDIMENT FROM ADJACENT LOTS YOU HAVE 9 BUSINESS DAY TO FIX ALL IF THEY ARE NOT FIXED THERE WILL BE A INSPECTION HOLD ON THE PERMIT INTILL ALL CORRECTION ARE MADE NEXT INSPECTION 9/20/23 | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: AT THIS TIME OF THE INSPECTION ALL PAVER BASE IS SPREAD AND COMPACTED READY FOR PAVERS NEED TO CUT CURB AND GUTTER AND FIX THE CONCRETE . ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - DRAINAGE | 09/13/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO RE-ESTABLISH THE SILT FENCE ON EACH SIDE OF THE LOT SO DIRT & SEDIMENT DONT WASH IN ON THE ADJACENT LOTS 2) NEED TO CLEAN ALL DIRT & SEDIMENT FROM ADJACENT LOTS YOU HAVE 9 BUSINESS DAY TO FIX ALL IF THEY ARE NOT FIXED THERE WILL BE A INSPECTION HOLD ON THE PERMIT INTILL ALL CORRECTION ARE MADE NEXT INSPECTION 9/20/23 | |||
| GRAVITY SEWER TEST | 08/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 8/15/2023 - PREVIOUS INSPECTION NOTES IN THE PROCESS OF INSTALLING GRAVITY SEWER CONDUIT WAS COMPROMISED AND BROKEN. CONTACT ''FPL'' AND ELECTRICIAN TO MAKE NESSARY REPAIRS. CALL BACK IN FOR GRAVITY SEWER INSPECTION WHEN REPAIRS ARE MADE THE FPL FEEDER LINES HAVE BEEN REPAIRED PER MAXX TEXT PICTURE | |||
| GRAVITY SEWER TEST | 08/15/2023 | Disapproved - NO FEE | MGIBSON |
| Note: IN THE PROCESS OF INSTALLING GRAVITY SEWER CONDUIT WAS COMPROMISED AND BROKEN. CONTACT ''FPL'' AND ELECTRICIAN TO MAKE NESSARY REPAIRS. CALL BACK IN FOR GRAVITY SEWER INSPECTION WHEN REPAIRS ARE MADE | |||
| U - SEWER TIE IN | 08/15/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 07/28/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1405. Release Power | |||
| INSULATION | 05/04/2023 | APPROVED | TSTAUFFACHER |
| Note: 5/3/2023 - PREVIOUS INSPECTION NOTES 05/03/2023- Insulation is fine, but electric to bath fans is not connected. Inspector Notes from Inspection 2320 05-01-2023 Silt fence has fallen down. Please remove the trash outside. Please have issues resolved prior to next inspection. | |||
| INSULATION | 05/03/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 05/03/2023- Insulation is fine, but electric to bath fans is not connected. Inspector Notes from Inspection 2320 05-01-2023 Silt fence has fallen down. Please remove the trash outside. Please have issues resolved prior to next inspection. | |||
| INSULATION | 05/01/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 05-01-2023 1. Multipe areas of insulation has fallen down. 2. Fire foam not installed at steps. 3. Upstairs is a mess. Note to superintendent. Broken window upstairs. | |||
| LATH/BRICK/ WATER BARRIER | 05/01/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 05-01-2023 Silt fence has fallen down. Please remove the trash outside. Please have issues resolved prior to next inspection. | |||
| ALL ROUGH | 04/24/2023 | APPROVED | TSTAUFFACHER |
| GAS ROUGH | 04/24/2023 | APPROVED | TSTAUFFACHER |
| Note: Approved with all rough | |||
| ROOF VALLEY & METAL | 04/21/2023 | APPROVED | TSTAUFFACHER |
| ELECTRIC-TUG | 04/04/2023 | APPROVED | RMARTIN |
| WALL SHEATHING | 02/24/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2460 02-21-2023 1. Sheet 4 indicates 2 x12 beam over entry. No beam installed. 2. Sheet 6 - Interior wall detail. Blocking not installed. Check all. 3. 6 x 6 post at second floor roof needs to be exposed for fastening and please provide strapping details for 6 x 6 posts. 4. LVL not exposed for inspection. Please provide nailing pattern and expose LVE on all three LVLs. Roof sheathing approved. Engineering approved. Check at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/21/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 02-21-2023 1. Sheet 4 indicates 2 x12 beam over entry. No beam installed. 2. Sheet 6 - Interior wall detail. Blocking not installed. Check all. 3. 6 x 6 post at second floor roof needs to be exposed for fastening and please provide strapping details for 6 x 6 posts. 4. LVL not exposed for inspection. Please provide nailing pattern and expose LVE on all three LVLs. Roof sheathing approved. Engineering approved. Check at next inspection. | |||
| WALL SHEATHING | 02/21/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 02-21-2023 Multiple shiners. Check all. Firsyt and second floor. | |||
| TIE BEAM / LINTEL | 01/11/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 01/11/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/29/2022 | APPROVED | AGAETANO |
| Note: ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/27/2022 | APPROVED | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/22/2022 | CANCELLED BY APPLICANT | WEB |
| STEM WALL FOUNDATION | 12/09/2022 | APPROVED | DCUSHING |
| Note: Inspector Notes from Inspection 2270 11-28-2022 Approved for outside perimeter footing. Sheet 8 Foundation plan. Covered lanai and kitchen column/footing not excavated. Notes 5,6, and 7. | |||
| FOOTER | 11/28/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 11-28-2022 Approved for outside perimeter footing. Sheet 8 Foundation plan. Covered lanai and kitchen column/footing not excavated. Notes 5,6, and 7. | |||
| WATER METER INSTALLATION REQUEST | 10/27/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/23/2024 | 02/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/25/2023 | 09/28/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/19/2023 | 09/19/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/19/2023 | 09/25/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO INDACATE WHAT PAVER DETAIL YOU ARE USEING ON SITE PLAN SO INSPECTION CAN BE INSPECED CORRECTLY | |||
| ENGIN1 | COMPLETE | 09/19/2023 | 09/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/22/2023 | 02/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/11/2023 | 01/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/11/2023 | 01/11/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/07/2022 | 09/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/07/2022 | 09/07/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/26/2022 | 08/30/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Properly identify ALL Florida Product Approval Number (i.e. 7849.# & 17676.#); there are various types of approvals under these numbers provided. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 08/26/2022 | 08/29/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 08/26/2022 | 08/29/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/26/2022 | 08/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/26/2022 | 08/31/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/26/2022 | 08/26/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 08/26/2022 | 09/01/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/26/2022 | 09/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/04/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/12/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/12/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 09/12/2022 |
| SEWER INSPECTION | ¤25.00 | 09/12/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 09/12/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 09/12/2022 |
| SITE PLAN 30 | ¤30.00 | 09/12/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/12/2022 |
| SW ENG PRE APRON | ¤30.00 | 09/12/2022 |
| WATER-METER | ¤467.09 | 09/12/2022 |
| WATER- TURN ON | ¤25.00 | 09/12/2022 |
| WATER- TURN ON | ¤25.00 | 09/12/2022 |
| ADJUSTMENT 50% | (¤897.50) | 09/12/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/12/2022 |
| INSPECTION - RESIDENTIAL | ¤1,375.00 | 09/12/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤390.00 | 09/12/2022 |
| CONNECTION FEES | ¤1,077.88 | 09/12/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 09/12/2022 |
| IMPACT FEE FIRE | ¤388.65 | 09/12/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 09/12/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/12/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 09/12/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/12/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/12/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 09/12/2022 |
| SURCHARGE FS 533.721 | ¤5.51 | 09/12/2022 |
| SURCHARGE - FS 468.631 | ¤8.27 | 09/12/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/12/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,175.76 |