Permit #2022081552
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00710-0080 |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 332 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 156 sqft |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 332 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 156 sqft |
| Total Square Footage: 3484 sqft |
| Block: 00710 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-237-1210 |
| Location Address: 15 SLATE BLUE PL |
| Type: DU - DUPLEX |
| Issue Date: 11/02/2022 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: CFHA INVESTMENTS LLC |
|
Address 9738 US HIGHWAY 192 CLERMONT, FL 34714 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/05/2023 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 12/04/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/30/2023 | APPROVED | FSLADISH |
| Note: 11/30/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 11/30/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/30/23 YOU NEED TO REMOVE THE SMALL PILE OF DEBRIS FROM THE DRIVEWAY. I AM APPROVING THIS INSPECTION AS NOTED. PLEASE MAKE CORRECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/30/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/29/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 10/20/23 REVISED SITE PLAN SUBMITTED ACCORDING TO OUR DISCUSSION. PIPE IS GOOD . READY TO POUR AT THE TIME OF THIS INSPECTION. TOLD CM TO MAKE SURE BAND BOLTS ARE BELOW POUR AREA BEFORE POURING CONCRETE. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. New inspection due to canceled inspection 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 TALKED TO BRETT FROM FJF GRADING AND DECIDED THAT THEY WILL BE CHANGING THE DRIVEWAY WIDTH AT ROW TO 24' WITH 3' FLARES. DRIVEWAY WILL FLARE OUT TO 32' BEHIND ROW TO GARAGE. NEED TO HAVE REVISED SITE PLAN BEFORE FINAL SURVEY. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/29/2023 | APPROVED | FSLADISH |
| Note: 11/29/23 DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/20/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/20/23 REVISED SITE PLAN SUBMITTED ACCORDING TO OUR DISCUSSION. PIPE IS GOOD . READY TO POUR AT THE TIME OF THIS INSPECTION. TOLD CM TO MAKE SURE BAND BOLTS ARE BELOW POUR AREA BEFORE POURING CONCRETE. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. New inspection due to canceled inspection 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 TALKED TO BRETT FROM FJF GRADING AND DECIDED THAT THEY WILL BE CHANGING THE DRIVEWAY WIDTH AT ROW TO 24' WITH 3' FLARES. DRIVEWAY WILL FLARE OUT TO 32' BEHIND ROW TO GARAGE. NEED TO HAVE REVISED SITE PLAN BEFORE FINAL SURVEY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/19/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 TALKED TO BRETT FROM FJF GRADING AND DECIDED THAT THEY WILL BE CHANGING THE DRIVEWAY WIDTH AT ROW TO 24' WITH 3' FLARES. DRIVEWAY WILL FLARE OUT TO 32' BEHIND ROW TO GARAGE. NEED TO HAVE REVISED SITE PLAN BEFORE FINAL SURVEY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/06/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 10/06/23 TALKED TO BRETT FROM FJF GRADING AND DECIDED THAT THEY WILL BE CHANGING THE DRIVEWAY WIDTH AT ROW TO 24' WITH 3' FLARES. DRIVEWAY WILL FLARE OUT TO 32' BEHIND ROW TO GARAGE. NEED TO HAVE REVISED SITE PLAN BEFORE FINAL SURVEY. | |||
| ELECTRIC - EARLY POWER | 09/05/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-5-23 1. Emailed FPL at 1:31. | |||
| GRAVITY SEWER TEST | 08/22/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/22/2023 | APPROVED | MGIBSON |
| INSULATION | 07/31/2023 | APPROVED | BTAYLOR |
| Note: 7/27/2023 - PREVIOUS INSPECTION NOTES 7/27/23: Cancelled by applicant in person upon arrival. Not ready. Right side: cardboard baffles at back porch missing. Need additional firestop above breaker box. Left side: area above breaker box still needs to be resolved. Need fireblocking on left side & additional 3/4" board needed (or additional firestop) at wires to meet the 1-1/2" minimum required per FBC 302.11.1. 7/26/2023 - PREVIOUS INSPECTION NOTES 07/26/2023- not all work complete at this time from prior notes 7/25/2023 - PREVIOUS INSPECTION NOTES Missing card boaord stop at change of ceilibf heights at all tray ceilings Missing cardboard right unit at back porch Left unit above electric panel missing fire block/or foam left side of panel | |||
| INSULATION | 07/27/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 7/27/23: Cancelled by applicant in person upon arrival. Not ready. Right side: cardboard baffles at back porch missing. Need additional firestop above breaker box. Left side: area above breaker box still needs to be resolved. Need fireblocking on left side & additional 3/4" board needed (or additional firestop) at wires to meet the 1-1/2" minimum required per FBC 302.11.1. 7/26/2023 - PREVIOUS INSPECTION NOTES 07/26/2023- not all work complete at this time from prior notes 7/25/2023 - PREVIOUS INSPECTION NOTES Missing card boaord stop at change of ceilibf heights at all tray ceilings Missing cardboard right unit at back porch Left unit above electric panel missing fire block/or foam left side of panel | |||
| INSULATION | 07/26/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 07/26/2023- not all work complete at this time from prior notes 7/25/2023 - PREVIOUS INSPECTION NOTES Missing card boaord stop at change of ceilibf heights at all tray ceilings Missing cardboard right unit at back porch Left unit above electric panel missing fire block/or foam left side of panel | |||
| INSULATION | 07/25/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Missing card boaord stop at change of ceilibf heights at all tray ceilings Missing cardboard right unit at back porch Left unit above electric panel missing fire block/or foam left side of panel | |||
| PEP TANK INSTALLATION REQUEST | 07/24/2023 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 07/21/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 07/13/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 06/08/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/08/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 06/08/2023 | APPROVED | BTAYLOR |
| FIREWALL FINAL | 06/05/2023 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 05/31/2023 | APPROVED | BTAYLOR |
| Note: 5/23/2023 - PREVIOUS INSPECTION NOTES 5-23-23 1. Not finished. | |||
| FIREWALL DRYWALL NAILING | 05/23/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-23-23 1. Not finished. | |||
| TIE BEAM / LINTEL | 02/09/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 01/06/2023 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 12/28/2022 | APPROVED | LMILLER |
| Note: 12/27/2022 - PREVIOUS INSPECTION NOTES 12/27/22: INSPECTION STOPPED! No APPROVED plans in permit box for inspection! [A] 107.3.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance." One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative. 12-28-22 Notes above resolved | |||
| MONOLITHIC SLAB | 12/27/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 12/27/22: INSPECTION STOPPED! No APPROVED plans in permit box for inspection! [A] 107.3.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance." One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/19/2022 | APPROVED | MGIBSON |
| Note: 12/16/2022 - PREVIOUS INSPECTION NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/16/2022 | CANCELLED BY APPLICANT | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/30/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 10/13/2023 | 10/13/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/13/2023 | 10/13/2023 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Include a site plan with any changes to proposed driveway | |||
| BADMIN | INFORMATION | 10/13/2023 | 10/13/2023 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Include site plan for any changes to the proposed driveway | |||
| ENGIN1 | COMPLETE | 10/09/2023 | 10/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/09/2023 | 10/12/2023 |
| Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/09/2023 | 10/09/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM You submitted a revised site plan. Please provide note on your revision sheet as to what has changed on the site plan. | |||
| BADMIN | INFORMATION | 05/02/2023 | 05/02/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO A-2.PDF | |||
| BLD | COMPLETE | 05/02/2023 | 05/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/02/2022 | 09/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/02/2022 | 09/06/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/29/2022 | 12/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/27/2022 | 08/30/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Design Pressures on Sheet C1 do not meet the minimum design standards of Table R301.2(2) | |||
| CUSVC | COMPLETE | 08/27/2022 | 08/29/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 08/27/2022 | 08/29/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in master bedroom. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 08/27/2022 | 08/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/27/2022 | 08/31/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/27/2022 | 08/29/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/27/2022 | 09/01/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/27/2022 | 09/02/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/08/2023 |
| CONNECTION FEES | ¤2,155.76 | 11/02/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 11/02/2022 |
| IMPACT FEE FIRE | ¤777.30 | 11/02/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 11/02/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 11/02/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 11/02/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 11/02/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 11/02/2022 |
| SURCHARGE FS 533.721 | ¤4.00 | 11/02/2022 |
| SURCHARGE - FS 468.631 | ¤6.00 | 11/02/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/02/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/02/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/02/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/02/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/02/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 11/02/2022 |
| SEWER INSPECTION | ¤25.00 | 11/02/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 11/02/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 11/02/2022 |
| SITE PLAN 30 | ¤30.00 | 11/02/2022 |
| WATER- TURN ON | ¤50.00 | 11/02/2022 |
| ADJUSTMENT 50% | (¤632.75) | 11/02/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/02/2022 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 11/02/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 11/02/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤33,908.82 |