I want to search for...
Permit #2022081686
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-1200 |
| CONDITIONED SPACE: 2678 sqft |
| GARAGE: 944 sqft |
| SCREEN PORCH (SOLID ROOF) : 558 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 4212 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: (386)445-9393 |
| Location Address: 27 SABAL BEND |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/01/2022 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: BIXBY ROBERT & NANCY FERRERIA BIXBY H&W |
|
Address 2 ZEPHYR LILY PL PALM COAST, FL 32164 |
| Lot: 1200 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENTIAL |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/20/2024 | FINAL APPROVED | AGAETANO |
| Note: 2/6/2024 - PREVIOUS INSPECTION NOTES 02-06-2024 1. Gas inspection has expired and needs to be approved prior to building final. Gas on a separate permit. 2. Laundry room top outlet not GFCI protected. 3.Master bedroom just outside master bath switches not installed properly. 4. Energy calcs do not match. 5. Lanai outlet at ceiling needs weatherproof cover. | |||
| BLD - BUILDING FINAL | 02/06/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 02-06-2024 1. Gas inspection has expired and needs to be approved prior to building final. Gas on a separate permit. 2. Laundry room top outlet not GFCI protected. 3.Master bedroom just outside master bath switches not installed properly. 4. Energy calcs do not match. 5. Lanai outlet at ceiling needs weatherproof cover. | |||
| ROW - STORMWATER FINAL | 02/06/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/06/24 PERMIT FOR POOL IS ON FILE AS INDICATED IN APPLICANT NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 02/06/2024 | FINAL APPROVED | DHANEY |
| Note: 2/1/2024 - PREVIOUS INSPECTION NOTES Need sewer clean out trimmed to ground level . | |||
| ROW - STORMWATER FINAL | 02/01/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO READ NOTES FROM INSPECTION 9465 AND BELOW THIS INSPECTION FOR ALL THINGS NEEDED TO PASS THIS INSPECTION --------------------------------------------------------------------------------- Inspector Notes from Inspection 9465 ** 01/25/24 LANDSCAPING AROUND STRUCTURE ON ALL BARE EARTH NEEDS TO BE COMPLETED BEFORE STORMWATER FINAL ** ALONG BOTH PROPERTY LINES OF ADJACENT VACANT PROPERTIES **SEED** AND ** STRAW** IS REQUIRED ON ALL DISTURBED EXPOSED BARE EARTH BEFORE STORMWATER FINAL ** NEED TO CLEAN CURB AND GUTTER OF SEDIMENT | |||
| U -UTILITY RESIDENTIAL FINAL | 02/01/2024 | Disapproved - NO FEE | DHANEY |
| Note: Need sewer clean out trimmed to ground level . | |||
| ROW - FINAL APRON (AFTER POUR) | 02/01/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 02/01/2024 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/25/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/25/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 01/25/24 LANDSCAPING AROUND STRUCTURE ON ALL BARE EARTH NEEDS TO BE COMPLETED BEFORE STORMWATER FINAL ** ALONG BOTH PROPERTY LINES OF ADJACENT VACANT PROPERTIES **SEED** AND ** STRAW** IS REQUIRED ON ALL DISTURBED EXPOSED BARE EARTH BEFORE STORMWATER FINAL ** NEED TO CLEAN CURB AND GUTTER OF SEDIMENT | |||
| LATH/BRICK/ WATER BARRIER | 11/22/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2490 New inspection due to canceled inspection Inspector Notes from Inspection 2420 06-14-2023 1. Kitchen vent at roof deck not sealed. 2. Add window / door nailing for SGD and transom above. 3. Front and back doors no glass. 4. Shield plate needed at slab at HVAC line. 06-23-2023 1. Insulation not complete at back left. Contractor on site and waiting for material. 2. Back SGD not installed. Front window and transom installed. 5. Energy calcs and mechanical layout not on site. Check at insulation inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/27/2023 | APPROVED | GBERTOLA |
| Note: 10/27/23= ready for pavers 10/26/2023 - PREVIOUS INSPECTION NOTES 10/26/23= NOT READY FOR INSPECTION, NOT FORMED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/29/2023 - PREVIOUS INSPECTION NOTES ** 09/29/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ** BUILDER REVISING SITE PLAN USING OPTION 3B | |||
| ROW- PRE-APRON (PRE-POUR) | 10/26/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 10/26/23= NOT READY FOR INSPECTION, NOT FORMED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/29/2023 - PREVIOUS INSPECTION NOTES ** 09/29/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ** BUILDER REVISING SITE PLAN USING OPTION 3B | |||
| ELECTRIC - EARLY POWER | 10/05/2023 | APPROVED | AGAETANO |
| ROW- PAVER RESTRAINTS | 09/29/2023 | APPROVED | EMADISON |
| Note: ** 09/29/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** BUILDER REVISING SITE PLAN USING OPTION 3B | |||
| ROW- PRE-APRON (PRE-POUR) | 09/29/2023 | CANCELLED BY INSPECTOR | EMADISON |
| Note: ** 09/29/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** BUILDER REVISING SITE PLAN USING OPTION 3B _____________________________________________________________________________________________________________________ | |||
| ROW- PRE-APRON (PRE-POUR) | 09/29/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 09/29/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ** BUILDER REVISING SITE PLAN USING OPTION 3B | |||
| U - SEWER TIE IN | 07/28/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 07/28/2023 | APPROVED | MGIBSON |
| INSULATION | 06/23/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2420 06-14-2023 1. Kitchen vent at roof deck not sealed. 2. Add window / door nailing for SGD and transom above. 3. Front and back doors no glass. 4. Shield plate needed at slab at HVAC line. 06-23-2023 1. Insulation not complete at back left. Contractor on site and waiting for material. 2. Back SGD not installed. Front window and transom installed. 5. Energy calcs and mechanical layout not on site. Check at insulation inspection. | |||
| INSULATION | 06/21/2023 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2420 06-14-2023 1. Kitchen vent at roof deck not sealed. 2. Add window / door nailing for SGD and transom above. 3. Front and back doors no glass. 4. Shield plate needed at slab at HVAC line. 5. Energy calcs and mechanical layout not on site. Check at insulation inspection. | |||
| ALL ROUGH | 06/14/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 06-14-2023 1. Kitchen vent at roof deck not sealed. 2. Add window / door nailing for SGD and transom above. 3. Front and back doors no glass. 4. Shield plate needed at slab at HVAC line. 5. Energy calcs and mechanical layout not on site. Check at insulation inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/05/2023 | APPROVED | AGAETANO |
| Note: 6/1/2023 - PREVIOUS INSPECTION NOTES 5/9/2023 - PREVIOUS INSPECTION NOTES 5/4/2023 - PREVIOUS INSPECTION NOTES 05-04-2023 Roof sheathing only is approved. 05-09-2023 1. Truss A26, please provide engineering for the cut triple truss at the sun room. 2. D01 missed engineering. 3. B01 straps are fastened to blocking. Please provide engineering to the building department or install as per plans. 4. A01, A02 missed engineering. 5. A01, A02, A03, A05, A06 truss installation do not match engineering packet. 6. Garage overhang has been added. Please revise and submit to the building department and have on site. Inspection stopped. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/01/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 5/9/2023 - PREVIOUS INSPECTION NOTES 5/4/2023 - PREVIOUS INSPECTION NOTES 05-04-2023 Roof sheathing only is approved. 05-09-2023 1. Truss A26, please provide engineering for the cut triple truss at the sun room. 2. D01 missed engineering. 3. B01 straps are fastened to blocking. Please provide engineering to the building department or install as per plans. 4. A01, A02 missed engineering. 5. A01, A02, A03, A05, A06 truss installation do not match engineering packet. 6. Garage overhang has been added. Please revise and submit to the building department and have on site. Inspection stopped. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/09/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 5/4/2023 - PREVIOUS INSPECTION NOTES 05-04-2023 Roof sheathing only is approved. 05-09-2023 1. Truss A26, please provide engineering for the cut triple truss at the sun room. 2. D01 missed engineering. 3. B01 straps are fastened to blocking. Please provide engineering to the building department or install as per plans. 4. A01, A02 missed engineering. 5. A01, A02, A03, A05, A06 truss installation do not match engineering packet. 6. Garage overhang has been added. Please revise and submit to the building department and have on site. Inspection stopped. | |||
| ROOF VALLEY & METAL | 05/09/2023 | APPROVED | AGAETANO |
| WALL SHEATHING | 05/04/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/04/2023 | PARTIALLY APPROVED | AGAETANO |
| Note: 05-04-2023 Roof sheathing only is approved. | |||
| TIE BEAM / LINTEL | 01/24/2023 | APPROVED | AGAETANO |
| Note: 1/23/2023 - PREVIOUS INSPECTION NOTES 01-23-2023 Sheet 4 Rear porch section indicates 2 rebar in bottom of lintel. HOnly one installed. Highlighted on drawings. | |||
| TIE BEAM / LINTEL | 01/23/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 01-23-2023 Sheet 4 Rear porch section indicates 2 rebar in bottom of lintel. HOnly one installed. Highlighted on drawings. | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/20/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/28/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/21/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/30/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/15/2024 | 02/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/24/2023 | 10/31/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/19/2023 | 01/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/19/2023 | 01/19/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/03/2022 | 10/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/23/2022 | 09/23/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/16/2022 | 09/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/16/2022 | 09/19/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ZON | HOLD | 09/16/2022 | 09/20/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please submit a new landscape plan Site plan changes approved please make sure the landscape matches the changes made in the drive way. | |||
| SW1 | HOLD | 09/16/2022 | 09/23/2022 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See highlighted item on Checklist dated 9/23/22 for corrections needed. | |||
| ENGIN1 | COMPLETE | 09/16/2022 | 09/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/30/2022 | 09/06/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 08/30/2022 | 08/31/2022 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 08/30/2022 | 08/30/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/30/2022 | 08/30/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/30/2022 | 09/06/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/30/2022 | 08/30/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R30 insulation in attic. Energy Calcs say R20 on roof deck. Revise to match 2. Energy calcs need to be signed by the builder | |||
| SW1 | HOLD | 08/30/2022 | 09/07/2022 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM SHOW PROPOSED ELEVATIONS AT ALL EXISTING ELEVATIONS ON SITE PLAN | |||
| ZON | HOLD | 08/30/2022 | 09/07/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color sheet: Please correct color of garage door on color sheet as per our conversation via telephone. Driveways as per code; Driveways shall either lead to a garage (standard driveway), or a circular driveway may be constructed. Except for corner lots, one approach of a circular driveway shall double as the standard driveway.5.A standard driveway may also have a flare where the driveway widens to provide for an additional lane for vehicle parking. Additionally, standard driveways may have a turnaround so residents may avoid backing out onto the street. Turnarounds shall be located solely on the homeowner's property, except for radii, and not within rights-of-way. In side yards, flares and turnarounds shall not encroach into side yard easements and shall not be located within five feet of side property lines. turn around needs to be no more that 18 in length and 9 in wide allowing for a vehicle to safely tun around please reduce the size of the turn around to meet the measurements above | |||
| PLENV | COMPLETE | 08/30/2022 | 09/12/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 9/12/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/20/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/20/2024 |
| CONNECTION FEES | ¤25.00 | 11/01/2022 |
| WATER-METER | ¤467.09 | 11/01/2022 |
| ADJUSTMENT 50% | (¤721.00) | 11/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/01/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 11/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 11/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/01/2022 |
| TRANSPORTATION IMPACT FEE | ¤1,764.00 | 11/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 11/01/2022 |
| SEWER INSPECTION | ¤25.00 | 11/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 11/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 11/01/2022 |
| SITE PLAN 30 | ¤30.00 | 11/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/01/2022 |
| FIRE RESIDENTIAL IMPACT FEE | ¤388.65 | 11/01/2022 |
| PARKS IMPACT FEE | ¤1,455.13 | 11/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/01/2022 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 11/01/2022 |
| SURCHARGE FS 533.721 | ¤4.50 | 11/01/2022 |
| SURCHARGE - FS 468.631 | ¤6.75 | 11/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,367.65 |