I want to search for...
Permit #2022090013
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00350-0100 |
| CONDITIONED SPACE: 2084 sqft |
| GARAGE: 585 sqft |
| OPENED PORCH (WITH ROOF) : 291 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| Total Square Footage: 2995 sqft |
| Block: 00350 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-4799 |
| Location Address: 14 EASTMOOR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/14/2022 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC |
|
Address 7755 S US1 BUNNELL, FL 32110 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7755 S. US HWY 1 BUNNELL, FL 32110 |
CGC1528576 (Exp: 08/31/2026) | 386-931-4799 |
Sub Contractors
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
JACOB D CASTLE
| Status | Location Address | State License Number | Phone |
| CANCEL |
508 N MOORE ST BUNNELL, FL 32110 |
RF11067810 (Exp: 08/31/2027) | 386-864-5066 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/13/2023 | FINAL APPROVED | JWALKER |
| Note: 6/12/2023 - PREVIOUS INSPECTION NOTES Cancelled by applicant via phone call at @ 10:01. Stated not ready. 6/8/2023 - PREVIOUS INSPECTION NOTES 6/8/23: 1). AHU breaker is too small. (46amps min. / 50 amp max. required / 45amp breaker installed). 2). AHU closet needs to be sealed around the perimeter / Lineset & condensate need to be sealed where they enter the deck / Right side duct board is not sealed all along the edge as required. 3). Kitchen smoke is not communicating with others. 4). Back lanai outlets have no power. (not connected to other exterior outlets. 5). Microwave is missing locking breaker / breaker lock as required ( NEC 422.31) House is spray foam in attic | |||
| BLD - BUILDING FINAL | 06/12/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: Cancelled by applicant via phone call at @ 10:01. Stated not ready. 6/8/2023 - PREVIOUS INSPECTION NOTES 6/8/23: 1). AHU breaker is too small. (46amps min. / 50 amp max. required / 45amp breaker installed). 2). AHU closet needs to be sealed around the perimeter / Lineset & condensate need to be sealed where they enter the deck / Right side duct board is not sealed all along the edge as required. 3). Kitchen smoke is not communicating with others. 4). Back lanai outlets have no power. (not connected to other exterior outlets. 5). Microwave is missing locking breaker / breaker lock as required ( NEC 422.31) House is spray foam in attic | |||
| ROW - STORMWATER FINAL | 06/09/2023 | FINAL APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ----------------------------------------------------------------------------- NOTE TO INSPECTOR THE ROCK NEEDS REMOVED ON LEFT SIDE VACANT AND SOD NEED TO BE OFF OF FENCE BEFORE PASSING | |||
| U -UTILITY RESIDENTIAL FINAL | 06/08/2023 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 06/08/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| BLD - BUILDING FINAL | 06/08/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/8/23: 1). AHU breaker is too small. (46amps min. / 50 amp max. required / 45amp breaker installed). 2). AHU closet needs to be sealed around the perimeter / Lineset & condensate need to be sealed where they enter the deck / Right side duct board is not sealed all along the edge as required. 3). Kitchen smoke is not communicating with others. 4). Back lanai outlets have no power. (not connected to other exterior outlets. 5). Microwave is missing locking breaker / breaker lock as required ( NEC 422.31) House is spray foam in attic | |||
| ROW - FINAL APRON (AFTER POUR) | 06/07/2023 | APPROVED | PFLANAGAN |
| Note: LOOKS GOOD AT THIS TIME | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/07/2023 | APPROVED | PFLANAGAN |
| Note: 5/26/2023 - PREVIOUS INSPECTION NOTES PLEASE READ NOTES FROM PREVIOUS INSPECTION STILL HAVING THE SAME ISSUES FROM PREVIOUS FINAL SURVEY. ------------------------------------------------------------------------- 5/23/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO MAKE DRAINAGE ON THE LEFT SIDE OF HOUSE A COMMON SWALE DO TO VACANT LOT TO THE LEFT 2) WATER IS BEING HELD UP IN THE BACK RIGHT OF LOT ACCORDING TO THE ELEVATIONS THAT WAS PROVIDED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/07/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/26/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: PLEASE READ NOTES FROM PREVIOUS INSPECTION STILL HAVING THE SAME ISSUES FROM PREVIOUS FINAL SURVEY. ------------------------------------------------------------------------- 5/23/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO MAKE DRAINAGE ON THE LEFT SIDE OF HOUSE A COMMON SWALE DO TO VACANT LOT TO THE LEFT 2) WATER IS BEING HELD UP IN THE BACK RIGHT OF LOT ACCORDING TO THE ELEVATIONS THAT WAS PROVIDED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/23/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO MAKE DRAINAGE ON THE LEFT SIDE OF HOUSE A COMMON SWALE DO TO VACANT LOT TO THE LEFT 2) WATER IS BEING HELD UP IN THE BACK RIGHT OF LOT ACCORDING TO THE ELEVATIONS THAT WAS PROVIDED | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2023 | APPROVED | GBERTOLA |
| Note: 4/26/23= READY FOR PAVERS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/13/2023 - PREVIOUS INSPECTION NOTES 04/13/23 READY TO POUR APRON AND PAVER RESTRAINTS. NEED TO HAVE PAVER BASE SPREAD AND COMPACTED FOR NEXT INSPECTION DO NOT LAY ANY PAVERS UNTIL SECONDARY INSPECTION FOR PAVER BASE AND COMPACTION IS APPROVED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 04/13/2023 | PARTIALLY APPROVED | FSLADISH |
| Note: 04/13/23 READY TO POUR APRON AND PAVER RESTRAINTS. NEED TO HAVE PAVER BASE SPREAD AND COMPACTED FOR NEXT INSPECTION DO NOT LAY ANY PAVERS UNTIL SECONDARY INSPECTION FOR PAVER BASE AND COMPACTION IS APPROVED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 04/10/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 04/10/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 03/10/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-10-23 1. Emailed FPL at 8:50. | |||
| PEP TANK INSTALLATION REQUEST | 03/08/2023 | APPROVED | TSCHWEERS |
| Note: 2/9/2023 3:38:58 PM- PREVIOUS INSPECTION NOTES 2/9/2023 Drywall materials must be on site and exterior needs to be completed. | |||
| LATH/BRICK/ WATER BARRIER | 02/28/2023 | APPROVED | BTAYLOR |
| INSULATION | 02/17/2023 | APPROVED | TSTAUFFACHER |
| Note: 2/16/2023 - PREVIOUS INSPECTION NOTES 2/16/2023- please firestop seam in between 2 double walls. please fill spots on block wall where cut out for electric/plumbing. Inspector Notes from Inspection 2420 Support bath fan vent on laft side of house | |||
| INSULATION | 02/16/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 2/16/2023- please firestop seam in between 2 double walls. please fill spots on block wall where cut out for electric/plumbing. Inspector Notes from Inspection 2420 Support bath fan vent on laft side of house | |||
| PEP TANK INSTALLATION REQUEST | 02/09/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 2/9/2023 Drywall materials must be on site and exterior needs to be completed. | |||
| ALL ROUGH | 02/03/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Support bath fan vent on laft side of house | |||
| WALL SHEATHING | 01/25/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2460 1/23/23: Ties & Down cell - Checked and approved. Roof sheathing bump checked - Disapproved 1). One loose piece of plywood on porch at left side next to fourth truss from king(left corner) truss. Check at roof valley metal inspection. Braces checked - disapproved 2). Third C1 truss is missing bracing on 1 web as indicated on MiTek. Check at next inspection. Inspector Notes from Inspection 2340 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well. | |||
| ROOF VALLEY & METAL | 01/25/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2460 1/23/23: Ties & Down cell - Checked and approved. Roof sheathing bump checked - Disapproved 1). One loose piece of plywood on porch at left side next to fourth truss from king(left corner) truss. Check at roof valley metal inspection. Braces checked - disapproved 2). Third C1 truss is missing bracing on 1 web as indicated on MiTek. Check at next inspection. Inspector Notes from Inspection 2340 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/23/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 1/23/23: Ties & Down cell - Checked and approved. Roof sheathing bump checked - Disapproved 1). One loose piece of plywood on porch at left side next to fourth truss from king(left corner) truss. Check at roof valley metal inspection. Braces checked - disapproved 2). Third C1 truss is missing bracing on 1 web as indicated on MiTek. Check at next inspection. Inspector Notes from Inspection 2340 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well. | |||
| ELECTRIC TEMP POLE | 01/23/2023 | APPROVED | RSIMS |
| Note: 1/23/23: FPL emailed | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/16/2022 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 12/08/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well. | |||
| TIE BEAM / LINTEL | 12/05/2022 | Disapproved - NO FEE | RSIMS |
| Note: 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. | |||
| MONOLITHIC SLAB | 11/15/2022 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/14/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/02/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/06/2023 | 04/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/30/2023 | 03/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/30/2023 | 04/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/30/2023 | 03/30/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/27/2023 | 03/27/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/23/2023 | 03/23/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please bring the originals into our office for propcessing | |||
| SW1 | HOLD | 03/23/2023 | 03/30/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE SITE PLAN IN THE SYSTEM IS NOT READABLE NEED TO HAVE A NEW SITE PLAN TO THE SYSTEM | |||
| ENGIN1 | COMPLETE | 03/23/2023 | 03/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/17/2023 | 03/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/17/2023 | 03/20/2023 |
| Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM DRAINAGE IS NEGATIVELY IMPCTING LOT ON RIGHT SIDE | |||
| ZON | HOLD | 03/17/2023 | 03/17/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit a fully completed, signed and notarized Right of Way Utilization Agreement for Paver Driveway. This form must be signed by all persons on deed to property and all signatures must be notarized. Once the electronic copy is reviewed and approved by staff, we will request the original be either mailed or dropped off to the zoning department. | |||
| BLD | COMPLETE | 12/16/2022 | 12/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/15/2022 | 12/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/15/2022 | 12/16/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/22/2022 | 09/22/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/22/2022 | 09/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/22/2022 | 09/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/22/2022 | 09/30/2022 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 09/15/2022 | 09/19/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in garage must be GFCI protected. NEC 2017 210.8 2nd REQUEST | |||
| ZON | HOLD | 09/15/2022 | 09/15/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location must be shown on site plan | |||
| SW1 | COMPLETE | 09/15/2022 | 09/21/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/01/2022 | 09/07/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/01/2022 | 09/06/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 09/01/2022 | 09/06/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in garage must be GFCI protected. NEC 2017 210.8 2. Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 09/01/2022 | 09/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/01/2022 | 09/08/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/01/2022 | 09/02/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/01/2022 | 09/13/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SUBMIT NEW SITE PLAN WITH THE HOUSE ON IT AND ALL DRAINAGE FEATURES | |||
| ZON | HOLD | 09/01/2022 | 09/08/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a site plan. Only boundary surveys were submitted under the site plan. | |||
| SWALE | COMPLETE | 09/01/2022 | 12/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/23/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/23/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 05/23/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/14/2022 |
| SURCHARGE FS 533.721 | ¤4.50 | 10/14/2022 |
| SURCHARGE - FS 468.631 | ¤6.75 | 10/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/14/2022 |
| SEWER CREDIT | (¤1,147.00) | 10/14/2022 |
| SEWER INSPECTION | ¤25.00 | 10/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/14/2022 |
| SITE PLAN 30 | ¤30.00 | 10/14/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/14/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/14/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/14/2022 |
| WATER- TURN ON | ¤25.00 | 10/14/2022 |
| ADJUSTMENT 50% | (¤721.00) | 10/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/14/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 10/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 10/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,782.94 |