Permit #2022090013

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00350-0100
CONDITIONED SPACE: 2084 sqft
GARAGE: 585 sqft
OPENED PORCH (WITH ROOF) : 291 sqft
OPENED PORCH (WITH ROOF) : 35 sqft
Total Square Footage: 2995 sqft
Block: 00350
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-4799
Location Address: 14 EASTMOOR LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/14/2022
NOC: RECORDED
Applicant name: JOHN DONALD GORDON
Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC

Address

7755 S US1

BUNNELL, FL 32110

Lot: 0100
Contracted Stated Job Value: ¤400,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

7755 S. US HWY 1

BUNNELL, FL 32110

CGC1528576 (Exp: 08/31/2026) 386-931-4799

Sub Contractors

DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
JACOB D CASTLE
Status Location Address State License Number Phone
CANCEL

508 N MOORE ST

BUNNELL, FL 32110

RF11067810 (Exp: 08/31/2027) 386-864-5066

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/13/2023 FINAL APPROVED JWALKER
Note: 6/12/2023 - PREVIOUS INSPECTION NOTES Cancelled by applicant via phone call at @ 10:01. Stated not ready. 6/8/2023 - PREVIOUS INSPECTION NOTES 6/8/23: 1). AHU breaker is too small. (46amps min. / 50 amp max. required / 45amp breaker installed). 2). AHU closet needs to be sealed around the perimeter / Lineset & condensate need to be sealed where they enter the deck / Right side duct board is not sealed all along the edge as required. 3). Kitchen smoke is not communicating with others. 4). Back lanai outlets have no power. (not connected to other exterior outlets. 5). Microwave is missing locking breaker / breaker lock as required ( NEC 422.31) House is spray foam in attic
BLD - BUILDING FINAL 06/12/2023 CANCELLED BY APPLICANT RSIMS
Note: Cancelled by applicant via phone call at @ 10:01. Stated not ready. 6/8/2023 - PREVIOUS INSPECTION NOTES 6/8/23: 1). AHU breaker is too small. (46amps min. / 50 amp max. required / 45amp breaker installed). 2). AHU closet needs to be sealed around the perimeter / Lineset & condensate need to be sealed where they enter the deck / Right side duct board is not sealed all along the edge as required. 3). Kitchen smoke is not communicating with others. 4). Back lanai outlets have no power. (not connected to other exterior outlets. 5). Microwave is missing locking breaker / breaker lock as required ( NEC 422.31) House is spray foam in attic
ROW - STORMWATER FINAL 06/09/2023 FINAL APPROVED PFLANAGAN
Note: CORRECTIONS MADE ----------------------------------------------------------------------------- NOTE TO INSPECTOR THE ROCK NEEDS REMOVED ON LEFT SIDE VACANT AND SOD NEED TO BE OFF OF FENCE BEFORE PASSING
U -UTILITY RESIDENTIAL FINAL 06/08/2023 FINAL APPROVED JHARDING
U-CROSS CONNECTION 06/08/2023 APPROVED - AS NOTED JHARDING
Note: No cross connections.
BLD - BUILDING FINAL 06/08/2023 Disapproved -FEE REQUIRED RSIMS
Note: 6/8/23: 1). AHU breaker is too small. (46amps min. / 50 amp max. required / 45amp breaker installed). 2). AHU closet needs to be sealed around the perimeter / Lineset & condensate need to be sealed where they enter the deck / Right side duct board is not sealed all along the edge as required. 3). Kitchen smoke is not communicating with others. 4). Back lanai outlets have no power. (not connected to other exterior outlets. 5). Microwave is missing locking breaker / breaker lock as required ( NEC 422.31) House is spray foam in attic
ROW - FINAL APRON (AFTER POUR) 06/07/2023 APPROVED PFLANAGAN
Note: LOOKS GOOD AT THIS TIME
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/07/2023 APPROVED PFLANAGAN
Note: 5/26/2023 - PREVIOUS INSPECTION NOTES PLEASE READ NOTES FROM PREVIOUS INSPECTION STILL HAVING THE SAME ISSUES FROM PREVIOUS FINAL SURVEY. ------------------------------------------------------------------------- 5/23/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO MAKE DRAINAGE ON THE LEFT SIDE OF HOUSE A COMMON SWALE DO TO VACANT LOT TO THE LEFT 2) WATER IS BEING HELD UP IN THE BACK RIGHT OF LOT ACCORDING TO THE ELEVATIONS THAT WAS PROVIDED
ROW FIELD SURVEY /GRADING CERTIFICATION 06/07/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/26/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: PLEASE READ NOTES FROM PREVIOUS INSPECTION STILL HAVING THE SAME ISSUES FROM PREVIOUS FINAL SURVEY. ------------------------------------------------------------------------- 5/23/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO MAKE DRAINAGE ON THE LEFT SIDE OF HOUSE A COMMON SWALE DO TO VACANT LOT TO THE LEFT 2) WATER IS BEING HELD UP IN THE BACK RIGHT OF LOT ACCORDING TO THE ELEVATIONS THAT WAS PROVIDED
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/23/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO MAKE DRAINAGE ON THE LEFT SIDE OF HOUSE A COMMON SWALE DO TO VACANT LOT TO THE LEFT 2) WATER IS BEING HELD UP IN THE BACK RIGHT OF LOT ACCORDING TO THE ELEVATIONS THAT WAS PROVIDED
ROW- PRE-APRON (PRE-POUR) 04/26/2023 APPROVED GBERTOLA
Note: 4/26/23= READY FOR PAVERS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/13/2023 - PREVIOUS INSPECTION NOTES 04/13/23 READY TO POUR APRON AND PAVER RESTRAINTS. NEED TO HAVE PAVER BASE SPREAD AND COMPACTED FOR NEXT INSPECTION DO NOT LAY ANY PAVERS UNTIL SECONDARY INSPECTION FOR PAVER BASE AND COMPACTION IS APPROVED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 04/13/2023 PARTIALLY APPROVED FSLADISH
Note: 04/13/23 READY TO POUR APRON AND PAVER RESTRAINTS. NEED TO HAVE PAVER BASE SPREAD AND COMPACTED FOR NEXT INSPECTION DO NOT LAY ANY PAVERS UNTIL SECONDARY INSPECTION FOR PAVER BASE AND COMPACTION IS APPROVED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
U - SEWER TIE IN 04/10/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 04/10/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 03/10/2023 APPROVED - AS NOTED BTAYLOR
Note: 3-10-23 1. Emailed FPL at 8:50.
PEP TANK INSTALLATION REQUEST 03/08/2023 APPROVED TSCHWEERS
Note: 2/9/2023 3:38:58 PM- PREVIOUS INSPECTION NOTES 2/9/2023 Drywall materials must be on site and exterior needs to be completed.
LATH/BRICK/ WATER BARRIER 02/28/2023 APPROVED BTAYLOR
INSULATION 02/17/2023 APPROVED TSTAUFFACHER
Note: 2/16/2023 - PREVIOUS INSPECTION NOTES 2/16/2023- please firestop seam in between 2 double walls. please fill spots on block wall where cut out for electric/plumbing. Inspector Notes from Inspection 2420 Support bath fan vent on laft side of house
INSULATION 02/16/2023 Disapproved - NO FEE JSTEWART
Note: 2/16/2023- please firestop seam in between 2 double walls. please fill spots on block wall where cut out for electric/plumbing. Inspector Notes from Inspection 2420 Support bath fan vent on laft side of house
PEP TANK INSTALLATION REQUEST 02/09/2023 Disapproved - NO FEE TSCHWEERS
Note: 2/9/2023 Drywall materials must be on site and exterior needs to be completed.
ALL ROUGH 02/03/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: Support bath fan vent on laft side of house
WALL SHEATHING 01/25/2023 APPROVED TSTAUFFACHER
Note: Inspector Notes from Inspection 2460 1/23/23: Ties & Down cell - Checked and approved. Roof sheathing bump checked - Disapproved 1). One loose piece of plywood on porch at left side next to fourth truss from king(left corner) truss. Check at roof valley metal inspection. Braces checked - disapproved 2). Third C1 truss is missing bracing on 1 web as indicated on MiTek. Check at next inspection. Inspector Notes from Inspection 2340 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well.
ROOF VALLEY & METAL 01/25/2023 APPROVED TSTAUFFACHER
Note: Inspector Notes from Inspection 2460 1/23/23: Ties & Down cell - Checked and approved. Roof sheathing bump checked - Disapproved 1). One loose piece of plywood on porch at left side next to fourth truss from king(left corner) truss. Check at roof valley metal inspection. Braces checked - disapproved 2). Third C1 truss is missing bracing on 1 web as indicated on MiTek. Check at next inspection. Inspector Notes from Inspection 2340 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/23/2023 APPROVED - AS NOTED RSIMS
Note: 1/23/23: Ties & Down cell - Checked and approved. Roof sheathing bump checked - Disapproved 1). One loose piece of plywood on porch at left side next to fourth truss from king(left corner) truss. Check at roof valley metal inspection. Braces checked - disapproved 2). Third C1 truss is missing bracing on 1 web as indicated on MiTek. Check at next inspection. Inspector Notes from Inspection 2340 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well.
ELECTRIC TEMP POLE 01/23/2023 APPROVED RSIMS
Note: 1/23/23: FPL emailed
FOUND SURVEY APPROVED (OFFICE) 12/16/2022 APPROVED TDOAK
TIE BEAM / LINTEL 12/08/2022 APPROVED - AS NOTED JWALKER
Note: 12/5/2022 - PREVIOUS INSPECTION NOTES 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans. 12/8/22 Contractor is revising the front entry layout. At contractors risk the existing down cells as built may be grouted. Please submitt the revision to the building depart showing the eliminated block wall at the left side interior area of the front entry. And the elimination of the two door jamb block walls and lintel. Truss plan layout will need to be revised as well.
TIE BEAM / LINTEL 12/05/2022 Disapproved - NO FEE RSIMS
Note: 12/5/22: 1). Missing down rod at left side of entry porch. 2). CMU wall at left side of entry not built as shown on plans.
MONOLITHIC SLAB 11/15/2022 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 11/14/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/02/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 04/06/2023 04/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/30/2023 03/31/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/30/2023 04/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 03/30/2023 03/30/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 03/27/2023 03/27/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 03/23/2023 03/23/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please bring the originals into our office for propcessing
SW1 HOLD 03/23/2023 03/30/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE SITE PLAN IN THE SYSTEM IS NOT READABLE NEED TO HAVE A NEW SITE PLAN TO THE SYSTEM
ENGIN1 COMPLETE 03/23/2023 03/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/17/2023 03/17/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 03/17/2023 03/20/2023
Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM DRAINAGE IS NEGATIVELY IMPCTING LOT ON RIGHT SIDE
ZON HOLD 03/17/2023 03/17/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit a fully completed, signed and notarized Right of Way Utilization Agreement for Paver Driveway. This form must be signed by all persons on deed to property and all signatures must be notarized. Once the electronic copy is reviewed and approved by staff, we will request the original be either mailed or dropped off to the zoning department.
BLD COMPLETE 12/16/2022 12/16/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/15/2022 12/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/15/2022 12/16/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 09/22/2022 09/22/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 09/22/2022 09/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/22/2022 09/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/22/2022 09/30/2022
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ELEC HOLD 09/15/2022 09/19/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in garage must be GFCI protected. NEC 2017 210.8 2nd REQUEST
ZON HOLD 09/15/2022 09/15/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location must be shown on site plan
SW1 COMPLETE 09/15/2022 09/21/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 09/01/2022 09/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/01/2022 09/06/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 09/01/2022 09/06/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in garage must be GFCI protected. NEC 2017 210.8 2. Submit electric load calcs
ENGIN1 COMPLETE 09/01/2022 09/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/01/2022 09/08/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/01/2022 09/02/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 09/01/2022 09/13/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SUBMIT NEW SITE PLAN WITH THE HOUSE ON IT AND ALL DRAINAGE FEATURES
ZON HOLD 09/01/2022 09/08/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a site plan. Only boundary surveys were submitted under the site plan.
SWALE COMPLETE 09/01/2022 12/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/12/2023
PLAN REVIEW - REVISION ¤32.50 05/23/2023
PLAN REVIEW - REVISION ¤32.50 05/23/2023
RECORDING FEE REIMBURSE DOC ¤44.00 05/23/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 10/14/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/14/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/14/2022
SURCHARGE FS 533.721 ¤4.50 10/14/2022
SURCHARGE - FS 468.631 ¤6.75 10/14/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/14/2022
SW ENG INSPECTION 80 ¤80.00 10/14/2022
SW ENG PRE APRON ¤30.00 10/14/2022
SW ENG - REVIEW 20 ¤20.00 10/14/2022
SW ENG RES REVIEW 200 ¤200.00 10/14/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 10/14/2022
SEWER CREDIT (¤1,147.00) 10/14/2022
SEWER INSPECTION ¤25.00 10/14/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/14/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/14/2022
SITE PLAN 30 ¤30.00 10/14/2022
CONNECTION FEES ¤1,077.88 10/14/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/14/2022
IMPACT FEE FIRE ¤388.65 10/14/2022
IMPACT FEE PARKS ¤1,455.13 10/14/2022
IMPACT FEE SCHOOL ¤5,450.00 10/14/2022
WATER- TURN ON ¤25.00 10/14/2022
ADJUSTMENT 50% (¤721.00) 10/14/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/14/2022
INSPECTION - RESIDENTIAL ¤1,100.00 10/14/2022
PLAN REVIEW - RESIDENTIAL ¤312.00 10/14/2022
Fees Total Due: ¤0.00 Total Paid: ¤18,782.94