I want to search for...
Permit #2022090042
Permit Details
Status: COED
| Parcel Id: 07-11-31-7064-00090-0190 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00090 |
| Subdivision: 2178 - SECTION 64-LAGUNA FOREST |
| Job Phone: 631-929-5500 |
| Location Address: 18 LLACH CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/07/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICK PALM DEVELOPMENT LLC |
|
Address SUITE 110 GREENWOOD VILLAGE, CO 80111 |
|
Address 5460 S QUEBEC ST GREENWOOD VILLAGE, CO 80111 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/02/2023 | FINAL APPROVED | RMARTIN |
| Note: 4/28/2023 - PREVIOUS INSPECTION NOTES 4/28/23: Upon re-inspection noted two additional items. 1). AC condenser pad is (now) cracked all the way through and will need to be replaced. 2). Front door is missing door peephole/glass door viewer. **** Previously listed items 1 and 4 are not resolved properly. 1). Must be sealed with an approved fire resistent product. (which is why I asked for cement.) and 4). AHU return duct is still not properly sealed on the left side as required. 4/25/2023 - PREVIOUS INSPECTION NOTES 4/25/23: 1). Hole in CMU garage wall needs to be sealed with cement. 2). Master Bathroom toilet has no water. 3). AHU Breaker is too small. 4). AHU return duct is not sealed at the ceiling. 5). AC condensing unit has anchor that is not fully set (embedded) into pad. (front right side) 6). Missing Insulation certificate. 7). Garbage disposal has debris in it - jamming blades. 8). Water Heater relief valve drain tube is too long. Needs to be between 1-1/2" & 6" from the drain pan.(FBC-504.6) Also, need to seal the electric cable at the wall with firestop, mastic or joint compound. (no caulk). 9). 2" Service Feed pipe needs to be sealed at the soffit. (FBC-G2402.9) *** Permit box and debris left in garage needs to be removed. | |||
| ROW - STORMWATER FINAL | 05/22/2023 | APPROVED | PFLANAGAN |
| Note: 4/28/2023 - PREVIOUS INSPECTION NOTES 4/28/23=NEED TO LOWER THE SWALE ON THE LEFT SIDE FROM HALF WAY DOWN TO THE END OF THE SWALE, YOU ARE STOPING THE FLOW . NEED TO SOD TE SWALE ON THE EMPTY LOT . +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/25/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP STILL 2) CULVERT PIPE NEED TO BE FREE FROM ANY DIRT ------------------------------------------------------------------------------------------- 4/12/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP IN THE VACANT LOT AND YOUR LOT 2) NEED TO HAVE ALL DIRT AND OVER POURED CONCRETE CLEANED OUT OF THE CULVERT 3) NEED TO HAVE ROAD DAMAGE DONE BEFORE THIS INSPECTION | |||
| ROW - STORMWATER FINAL | 04/28/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 4/28/23=NEED TO LOWER THE SWALE ON THE LEFT SIDE FROM HALF WAY DOWN TO THE END OF THE SWALE, YOU ARE STOPING THE FLOW . NEED TO SOD TE SWALE ON THE EMPTY LOT . +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/25/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP STILL 2) CULVERT PIPE NEED TO BE FREE FROM ANY DIRT ------------------------------------------------------------------------------------------- 4/12/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP IN THE VACANT LOT AND YOUR LOT 2) NEED TO HAVE ALL DIRT AND OVER POURED CONCRETE CLEANED OUT OF THE CULVERT 3) NEED TO HAVE ROAD DAMAGE DONE BEFORE THIS INSPECTION | |||
| BLD - BUILDING FINAL | 04/28/2023 | Disapproved - NO FEE | RSIMS |
| Note: 4/28/23: Upon re-inspection noted two additional items. 1). AC condenser pad is (now) cracked all the way through and will need to be replaced. 2). Front door is missing door peephole/glass door viewer. **** Previously listed items 1 and 4 are not resolved properly. 1). Must be sealed with an approved fire resistent product. (which is why I asked for cement.) and 4). AHU return duct is still not properly sealed on the left side as required. 4/25/2023 - PREVIOUS INSPECTION NOTES 4/25/23: 1). Hole in CMU garage wall needs to be sealed with cement. 2). Master Bathroom toilet has no water. 3). AHU Breaker is too small. 4). AHU return duct is not sealed at the ceiling. 5). AC condensing unit has anchor that is not fully set (embedded) into pad. (front right side) 6). Missing Insulation certificate. 7). Garbage disposal has debris in it - jamming blades. 8). Water Heater relief valve drain tube is too long. Needs to be between 1-1/2" & 6" from the drain pan.(FBC-504.6) Also, need to seal the electric cable at the wall with firestop, mastic or joint compound. (no caulk). 9). 2" Service Feed pipe needs to be sealed at the soffit. (FBC-G2402.9) *** Permit box and debris left in garage needs to be removed. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/25/2023 | APPROVED | PFLANAGAN |
| BLD - BUILDING FINAL | 04/25/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/25/23: 1). Hole in CMU garage wall needs to be sealed with cement. 2). Master Bathroom toilet has no water. 3). AHU Breaker is too small. 4). AHU return duct is not sealed at the ceiling. 5). AC condensing unit has anchor that is not fully set (embedded) into pad. (front right side) 6). Missing Insulation certificate. 7). Garbage disposal has debris in it - jamming blades. 8). Water Heater relief valve drain tube is too long. Needs to be between 1-1/2" & 6" from the drain pan.(FBC-504.6) Also, need to seal the electric cable at the wall with firestop, mastic or joint compound. (no caulk). 9). 2" Service Feed pipe needs to be sealed at the soffit. (FBC-G2402.9) *** Permit box and debris left in garage needs to be removed. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/25/2023 | FINAL APPROVED | JHARDING |
| Note: 4/12/2023 - PREVIOUS INSPECTION NOTES No power. Need power to check pep system. | |||
| ROW - STORMWATER FINAL | 04/25/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP STILL 2) CULVERT PIPE NEED TO BE FREE FROM ANY DIRT ------------------------------------------------------------------------------------------- 4/12/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP IN THE VACANT LOT AND YOUR LOT 2) NEED TO HAVE ALL DIRT AND OVER POURED CONCRETE CLEANED OUT OF THE CULVERT 3) NEED TO HAVE ROAD DAMAGE DONE BEFORE THIS INSPECTION | |||
| ROW - STORMWATER FINAL | 04/12/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO HAVE ALL TRASH AND CONSTRUCTION DEBRIS PICK UP IN THE VACANT LOT AND YOUR LOT 2) NEED TO HAVE ALL DIRT AND OVER POURED CONCRETE CLEANED OUT OF THE CULVERT 3) NEED TO HAVE ROAD DAMAGE DONE BEFORE THIS INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 04/12/2023 | Disapproved - NO FEE | JHARDING |
| Note: No power. Need power to check pep system. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/11/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/11/2023 | APPROVED | PFLANAGAN |
| U - SEWER TIE IN | 03/23/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/23/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 03/07/2023 | APPROVED | RSIMS |
| Note: 3/6/2023 - PREVIOUS INSPECTION NOTES 3/6/23: 1). Service Feeds cannot be landed at Meter Panel for underground power before approved early power inspection. 2). Left side exterior - romex wire coming out of the wall is not safed off. | |||
| ELECTRIC - EARLY POWER | 03/06/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/6/23: 1). Service Feeds cannot be landed at Meter Panel for underground power before approved early power inspection. 2). Left side exterior - romex wire coming out of the wall is not safed off. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/23/2023 | APPROVED | EMADISON |
| Note: ** 02/23/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| PEP TANK INSTALLATION REQUEST | 01/30/2023 | APPROVED | TSCHWEERS |
| Note: 1/25/2023 9:15:03 AM- PREVIOUS INSPECTION NOTES 1/18/2023 8:23:05 AM- PREVIOUS INSPECTION NOTES dumpster will need to move 1/19/2023 Dumpster is still in the way for tank install. | |||
| PEP TANK INSTALLATION REQUEST | 01/19/2023 | Disapproved -FEE REQUIRED | TSCHWEERS |
| Note: 1/18/2023 8:23:05 AM- PREVIOUS INSPECTION NOTES dumpster will need to move 1/19/2023 Dumpster is still in the way for tank install. | |||
| INSULATION | 01/18/2023 | APPROVED | RSIMS |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 1/17/23: Still missing firestop at top plate penetration kitchen ceiling side as listed in item 1 previously. 1/13/2023 - PREVIOUS INSPECTION NOTES 1/13/23: 1). Missing firestop at top plate penetration for kitchen range hood vent line. 2). Laundry room - Missing firestop at top plate for 2" PVC vent line. 3). Bathroom - Missing firestop at top plate for 2" PVC vent line 4). Bathroom tub area - Missing firestop at top plate between bump out wall and bedroom wall. | |||
| INSULATION | 01/17/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/17/23: Still missing firestop at top plate penetration kitchen ceiling side as listed in item 1 previously. 1/13/2023 - PREVIOUS INSPECTION NOTES 1/13/23: 1). Missing firestop at top plate penetration for kitchen range hood vent line. 2). Laundry room - Missing firestop at top plate for 2" PVC vent line. 3). Bathroom - Missing firestop at top plate for 2" PVC vent line 4). Bathroom tub area - Missing firestop at top plate between bump out wall and bedroom wall. | |||
| INSULATION | 01/13/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/13/23: 1). Missing firestop at top plate penetration for kitchen range hood vent line. 2). Laundry room - Missing firestop at top plate for 2" PVC vent line. 3). Bathroom - Missing firestop at top plate for 2" PVC vent line 4). Bathroom tub area - Missing firestop at top plate between bump out wall and bedroom wall. Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). | |||
| U-CROSS CONNECTION | 01/13/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigatin-no cross connection | |||
| PEP TANK INSTALLATION REQUEST | 01/13/2023 | Disapproved - NO FEE | CSTONE |
| Note: dumpster will need to move | |||
| LATH/BRICK/ WATER BARRIER | 01/12/2023 | APPROVED | RSIMS |
| Note: 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23 : Still missing lath / stop around back sliding door. 1/4/2023 - PREVIOUS INSPECTION NOTES 1/4/23: Lath is missing around back sliding door. | |||
| LATH/BRICK/ WATER BARRIER | 01/09/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/9/23 : Still missing lath / stop around back sliding door. 1/4/2023 - PREVIOUS INSPECTION NOTES 1/4/23: Lath is missing around back sliding door. | |||
| ALL ROUGH | 01/09/2023 | APPROVED | RSIMS |
| Note: 1/4/2023 - PREVIOUS INSPECTION NOTES 1/4/23: 1). 5ft head pressure is not holding. 2). Laundry room - missing nail plate at shoe plate for kitchen island wire. 3). Laundry room - water line needs to be secured inside of wall framing. | |||
| LATH/BRICK/ WATER BARRIER | 01/04/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/4/23: Lath is missing around back sliding door. | |||
| ALL ROUGH | 01/04/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/4/23: 1). 5ft head pressure is not holding. 2). Laundry room - missing nail plate at shoe plate for kitchen island wire. 3). Laundry room - water line needs to be secured inside of wall framing. | |||
| LATH/BRICK/ WATER BARRIER | 12/29/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/15/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2450 12/14/22: Repair small hole in sheathing at top of left gable before brick/lathe inspection. 12-15-2022 Job site has trash around the exterior of the home. Please remove prior to next inspection. | |||
| ROOF VALLEY & METAL | 12/15/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2450 12/14/22: Repair small hole in sheathing at top of left gable before brick/lathe inspection. | |||
| ROOF VALLEY & METAL | 12/14/2022 | Disapproved - NO FEE | RSIMS |
| Note: 12/14/22: ROOF VALLEY METAL CANNOT BE APPROVED BEFORE ROOF SHEATHING. | |||
| WALL SHEATHING | 12/14/2022 | APPROVED - AS NOTED | RSIMS |
| Note: 12/14/22: Repair small hole in sheathing at top of left gable before brick/lathe inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/14/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 12/14/22: NO PLANS IN BOX FOR INSPECTION! (except MiTech & truss layout) INSPECTION STOPPED! *** Truss engineering checked & approved. *** Roof sheathing bump checked - Disapproved (marked at areas below) 1). Loose sheathing at front wall. 2). Loose sheathing left side wall. | |||
| ELECTRIC-TUG | 12/05/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/30/2022 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 11/15/2022 | APPROVED | BTAYLOR |
| Note: 11/14/2022 - PREVIOUS INSPECTION NOTES 11/14/2022: 1). No Compaction report or permit in permit box laying on the ground. 2). Clean out back left corner where hose bibb is to allow minimum 3" clearance to rebar. R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). | |||
| MONOLITHIC SLAB | 11/14/2022 | Disapproved - NO FEE | RSIMS |
| Note: 11/14/2022: 1). No Compaction report or permit in permit box laying on the ground. 2). Clean out back left corner where hose bibb is to allow minimum 3" clearance to rebar. R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/08/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/08/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/14/2023 | 02/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/30/2022 | 12/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/30/2022 | 11/30/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/01/2022 | 09/07/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/01/2022 | 09/06/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 09/01/2022 | 09/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/01/2022 | 09/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/01/2022 | 09/08/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/01/2022 | 09/02/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/01/2022 | 09/13/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/01/2022 | 09/08/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/01/2022 | 12/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/02/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/02/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/02/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/02/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/02/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/02/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/02/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 06/02/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/02/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/02/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/02/2023 |
| UTILITY PEP REINSPECTION | ¤40.00 | 06/02/2023 |
| SEWER CREDIT | (¤2,291.75) | 11/07/2022 |
| SEWER INSPECTION | ¤25.00 | 11/07/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 11/07/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 11/07/2022 |
| SITE PLAN 30 | ¤30.00 | 11/07/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/07/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/07/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 11/07/2022 |
| WATER- TURN ON | ¤25.00 | 11/07/2022 |
| ADJUSTMENT 50% | (¤405.07) | 11/07/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/07/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 11/07/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 11/07/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/07/2022 |
| IMPACT FEE FIRE | ¤388.65 | 11/07/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/07/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/07/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 11/07/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/07/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/07/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 11/07/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 11/07/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/07/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/07/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/07/2022 |
| CONNECTION FEES | ¤1,077.88 | 11/07/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,561.23 |