I want to search for...
Permit #2022090167
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7034-01530-0170 |
| CONDITIONED SPACE: 1988 sqft |
| GARAGE: 464 sqft |
| OPENED PORCH (WITH ROOF) : 330 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 2878 sqft |
| Block: 01530 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-6577 |
| Location Address: 73 EBB TIDE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/08/2022 |
| NOC: Unknown |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: PINTO MANUEL & MARIA LOURDES H&W |
|
Address 3244 REEVE DRIVE WEST BETHLEHEM, PA 18020 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤290,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
JOSE E ORTIZ JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4601 E MOODY BLVD BUNNELL, FL 32110 |
SUITE B7 BUNNELL, FL 32110 |
RC29027619 (Exp: 08/31/2023) | 386-503-6922 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| PROJECT STATUS (OFFICE USE) | 10/02/2024 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 10/2/2024 4:02:19 PM *** Water meter still installed, form boards and plumbing are gone Please provide a description of the property and take photos of the current condition. | |||
| ROW - DRAINAGE | 06/03/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/3/24 NOTHING HAS CHANGED. PLEASE READ THE PREVIOUS INSPECTION NOTES. THE TEMPORARY PIPE YOU HAVE INSATLLED IS CLOGGED. ON THE RIGHT SIDE IT IS COMPLETELY COVERED AND ON THE LEFT SIDE IT IS OBSTRUCTED.. YOU NEED TO CLEAN IT OUT AND MAKE SURE IT IS SET TO GRADE TO ALLOW THE SWALE TO HAVE POSITIVE DRAINAGE. WILL BE BACK FOR COMPLIANCE REINSPECTION 6/4/24 PHOTOS FOR REFERENCE. __________________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES A TEMPORARY CULVERT PIPE IS BLOCKING THE FLOW OF STORMWATER BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE inspector be back on 6/3/24 | |||
| ROW - DRAINAGE | 05/28/2024 | Disapproved - NO FEE | GBERTOLA |
| Note: A TEMPORARY CULVERT PIPE IS BLOCKING THE FLOW OF STORMWATER BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE inspector be back on 6/3/24 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/10/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO HAVE PORTABLE RESTROOM BEFORE SCHEDUALING SLAB INSPECTION, ALSO NEED TO HAVE ADDRESS PAINTED ON PERMIT BOX OR SOME OTHER LOCATION BECAUSE OF ''911' LOCATION | |||
| WATER METER INSTALLATION REQUEST | 05/15/2023 | APPROVED | CSTONE |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| WALL SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| FOUND SURVEY APPROVED (OFFICE) | |||
| PROJECT STATUS (OFFICE USE) | |||
| Note: 10/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 10/2/2024 4:02:19 PM *** Water meter still installed, form boards and plumbing are gone Please provide a description of the property and take photos of the current condition. | |||
| ROW - DRAINAGE | |||
| Note: 6/3/2024 - PREVIOUS INSPECTION NOTES 6/3/24 NOTHING HAS CHANGED. PLEASE READ THE PREVIOUS INSPECTION NOTES. THE TEMPORARY PIPE YOU HAVE INSATLLED IS CLOGGED. ON THE RIGHT SIDE IT IS COMPLETELY COVERED AND ON THE LEFT SIDE IT IS OBSTRUCTED.. YOU NEED TO CLEAN IT OUT AND MAKE SURE IT IS SET TO GRADE TO ALLOW THE SWALE TO HAVE POSITIVE DRAINAGE. WILL BE BACK FOR COMPLIANCE REINSPECTION 6/4/24 PHOTOS FOR REFERENCE. __________________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES A TEMPORARY CULVERT PIPE IS BLOCKING THE FLOW OF STORMWATER BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE inspector be back on 6/3/24 | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/21/2022 | 09/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/21/2022 | 09/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/21/2022 | 09/21/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/07/2022 | 01/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/06/2022 | 09/12/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Detail 7/F on sheet SD-2 calls-out the truss system as existing. Application is for a new home. 2. Provide manufacture specifications for the proposed fireplace. | |||
| CUSVC | COMPLETE | 09/06/2022 | 09/08/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 09/06/2022 | 09/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/06/2022 | 09/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/06/2022 | 09/08/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/06/2022 | 09/07/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Energy Calcs and heatload needs to be Daytona Beach or St. Augustine. 2. Plans show R5 insulation on walls. Energy Calcs say R4.1. Revise to match | |||
| SW1 | COMPLETE | 09/06/2022 | 09/13/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/06/2022 | 09/12/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 5 I only see 3 trees drawn on landscape plan color sheet missing: Please provide color sheet. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 12/08/2022 |
| ADJUSTMENT 50% | (¤526.85) | 12/08/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/08/2022 |
| INSPECTION - RESIDENTIAL | ¤797.50 | 12/08/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤226.20 | 12/08/2022 |
| CONNECTION FEES | ¤1,077.88 | 12/08/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/08/2022 |
| SW ENG PRE APRON | ¤30.00 | 12/08/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/08/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/08/2022 |
| SEWER CREDIT | (¤1,466.00) | 12/08/2022 |
| SEWER INSPECTION | ¤25.00 | 12/08/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 12/08/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 12/08/2022 |
| SITE PLAN 30 | ¤30.00 | 12/08/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/08/2022 |
| SURCHARGE FS 533.721 | ¤3.39 | 12/08/2022 |
| SURCHARGE - FS 468.631 | ¤5.09 | 12/08/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/08/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/08/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| CONTRACTOR CHANGE | ¤20.00 | |
| IMPACT FEE FIRE | ¤388.65 | |
| IMPACT FEE PARKS | ¤1,455.13 | |
| Fees | Total Due: ¤3,687.78 | Total Paid: ¤14,618.47 |